INSTALLATION INSTRUCTIONS
Before putting your service cellar into
service
●
Remove all inner and outer packaging
components.
●
Check that none of the following parts are
missing:
-
3 removable shelves
-
1 operating manual
●
Before connecting your device to a power
supply, allow it to stand upright for about 2
hours. This reduces the risk of malfunction of
the refrigeration
system due to handling during transport.
●
Clean the inner surfaces of the unit with a
soft cloth and warm water.
●
Place your unit on a floor strong
enough to support the weight of the
fully filled unit.
●
Make sure the unit is level by adjusting the
front feet underneath the unit. Make sure
that the cellar rests on its feet in a stable
manner.
-
0
5
-
Summary of Contents for WCL-12L
Page 1: ...MANUAL DE USUARIO ES Vinoteca WCL 28T WCL 18T WCL 12L WCL 6B...
Page 2: ......
Page 25: ...USER S MANUAL EN WCL 28T WCL 18T WCL 12L WCL 6B Service Cellar...
Page 48: ...MANUAL DE USU RIO PT Adega de servi o WCL 28T WCL 18T WCL 12L WCL 6B...
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......