background image

 

XDB300-0-0-GB-04 

December 2007 

Page 6 

 

XDB903-1-0-GB-XX 

Mount the Drop Box in a suitable location on a cement slab. Take into consideration 
any security issues, accessibility, routing of wires and visibility of the “Diagnostic 
Indicators

”.   

 

Figure 3:  Tag Retention Box Position 

1. 

Position the Mounting Bracket inside the base of the Drop Box. 

2. 

Mark out and drill the mounting hole. 

3. 

Fix the Drop Box into position (using the Mounting Bracket and M10 Rawl Bolt). 

4. 

Remove the Face Plate Assembly (including the Throat Assembly). 

5. 

Connect the Drop Box as per Figure 4. 

6. 

Re-attach the Face Plate Assembly. 

7. 

Hang the Tag Retention Box in position 1 (see Figure 3) below the Throat 
Assembly.   

8. 

Mark out and drill two suitable holes for the Power Cable and Comms Cable.  

9. 

Seal the Power Cable Hole and Comms Cable Hole using the supplied PG7 Cable 
Glands. 

Summary of Contents for IMPROX DBV

Page 1: ...or outdoor environment similar to IP54 XDB903 1 0 GB XX The Drop Box is designed to work in an indoor or outdoor environment similar to IP66 Input Voltage 12 V DC polarity sensitive Power Requirement...

Page 2: ...V continuous 80 V to 80 V surge LED Diagnostic Indicators Status LED Power On Continuous Red Upgrade Mode Flashing Red Steady RS485 Communications Failure Flashing Red Intermittent Incoming RS485 Dat...

Page 3: ...es a Tag Retention Box for catching the Tags The Drop Box Throat Assembly includes a 1 m 7 ft twisted black 0 5 mm 2 Conductor Power Cable One mild steel Mounting Bracket Two Keys Two PG7 Plastic Cabl...

Page 4: ...er ranges between 2 m to 16 m 7 ft to 53 ft Achieve this by using good quality screened twisted pair cable Distance between the Antenna Reader and the Drop Box To avoid mutual interference install the...

Page 5: ...the outside of the counter and the Throat Assembly is mounted on the inside of the counter CAUTION Make allowance during installation for the Tag Retention Box Ensure that the Tag Retention Box does N...

Page 6: ...e of the Drop Box 2 Mark out and drill the mounting hole 3 Fix the Drop Box into position using the Mounting Bracket and M10 Rawl Bolt 4 Remove the Face Plate Assembly including the Throat Assembly 5...

Page 7: ...off the lip located at position 1 see Figure 3 3 Turn the Tag Retention Box so that the lip faces away from the open Cabinet door 4 Hang the Tag Retention Box on the lip located at position 2 see Fig...

Page 8: ...0 GB 04 December 2007 Page 8 ELECTRICAL CONNECTIONS Typical Electrical Connections Figure 4 shows a typical electrical connection diagram for the ImproX DBv Figure 4 Typical ImproX DBv Electrical Con...

Page 9: ...ed Address Labels in the position of the Drop Box on the sketched site plan When the system installation is complete and all the units are represented on the site plan by their Fixed Address Labels fi...

Page 10: ...XDB300 0 0 GB 04 December 2007 Page 10 USER NOTES...

Page 11: ...XDB300 0 0 GB 04 December 2007 Page 11 USER NOTES...

Page 12: ...cable to the ImproX DBv Vertical Mount Drop Box XDB902 1 0 GB 02 and XDB903 1 0 GB 01 The last two digits of the Impro stock code indicate the issue status of the product XDB300 0 0 GB 04 Issue 05 Dec...

Reviews: