ELITURBO SYSTEM 

Section 3 – Installation and testing 

 

 
 

 

 

 
 
 

 

 
 
 
It is suggested to hang the Eliturbo

®

 units from the ceiling or from a beam, at a minimum distance 

equal to at least 15% of the entire height of the environment, in any case not lower than one meter. 
 
For example: 
 

Ceiling height (meters) 

Hanging height (meters) 

6 5 

6,5 ÷ 7 

10 

8 ÷ 8,5 

14 

11 ÷ 12 

 

 

 

For a quick installation it is suggested to use chaines. 

To lift people the machinery has to be specifically certified and used by
qualified personnel. 

 

The personnel that will be working at heights has to be previously trained,

wear and use individual protection media to respect the legislation in force,
safety shoes, gloves, protection helmet, harness, etc. 

Before positioning the unit, verify that it will not interfere with existing

machineries as lifters, kranes etc. 
Avoid positioning the unit near scaffolding,

 

racks,etc.. 

In case of accessible scaffolding, verify that the unit is positioned at least
2,5m from the scaffolding. 

To anchor the unit to the ceiling use steel chains with a minimum diameter of
3.5 mm or use steel cables with minimum diameter of 4.0 mm 

 
The anchor points have to be at a sufficient distance to contrast the starting torque; it is suggested to 
apply the anchoring points in a way that the chains will form an angle of 30° 

÷

 40° from the 

vertical. 
 
The length of the sustaining devices has to be at least a meter, this is to guarantee this distance 
between the anchor point and the Eliturbo

®

’s engine. 

 
The sustaining devices have to support a weight equivalent to 10 times the weight of the unit 
distributed on the anchor points (at least 100 Kg for each anchor point: on two anchor points). 
 

The Eliturbo

® 

air mixer does not have to be installed at less than 2,5 m from

the floor. 

 

 

 

11  

IST. E101.101GB –- ed. 11/08 

Summary of Contents for E.L.C. 2000

Page 1: ...Air Mixer User and maintenance guide Distribuitor CALOR SRL Str Progresului nr 30 40 sector 5 Bucuresti tel 021 411 44 44 fax 021 411 36 14 www calorserv ro www calor ro...

Page 2: ...ge 9 SECTION 3 INSTALLATION AND TESTING 10 3 1 General warnings for installation 10 3 2 Positioning the Eliturbo 10 3 3 Electric network connection 12 SECTION 4 PROTECTION SYSTEMS 15 4 1 Protection de...

Page 3: ...This guide has to be conserved until the final dismantling of the product in case of property change the guide has to be delivered to the new owner In case of damage and consequent block of the produc...

Page 4: ...and on the cover of the guide The product is in accordance with the following community directives 2006 42 CE Machine Directive 2006 95 CE Low Voltage Directive 2004 108 CE Electromagnetic Compatibil...

Page 5: ...t bother workers it is manufactured in accordance with the security norms and the environment s hygiene norms The Eliturbo air mixer differing from the other ceiling ventilators doesn t direct air flu...

Page 6: ...licentrifugal Fan type 2 Rotor version n blades 2 4 Treated air m3 h 7500 10000 Speed Rpm 700 Diameter mm 680 Height mm 570 Weight kg 16 18 External finishing Epoxy powder paint Colour black Table 1 T...

Page 7: ...ELY FORBIDDEN TO MODIFY THE SWITCHBOARD IT IS ABSOLUTELY FORBIDDEN TO ESTINGUISH FIRES WITH WATER 1 7 Improper use The unit can t be used for different scopes than the ones stated in the paragraph 1 3...

Page 8: ...rrier logistics and positioning to avoid damages to the unit IMPRESIND SRL DECLINES ANY RESPONSABILITY FOR DAMAGES DUE TO TRANSPORT UPLOAD DOWNLOAD OF THE ELITURBO UNITS Move Eliturbo units with maxim...

Page 9: ...anger of fire and suffocation of people or animals The discharge of the packaging material has to be done in specification to the norms in force in the destination Country of the Eliturbo 2 5 Storage...

Page 10: ...ified by different colour arrows applied on the unit and the packaging Clockwise rotation Anti clockwise rotation When installing it is important to follow a chess board global positioning of the unit...

Page 11: ...s as lifters kranes etc Avoid positioning the unit near scaffolding racks etc In case of accessible scaffolding verify that the unit is positioned at least 2 5m from the scaffolding To anchor the unit...

Page 12: ...e to be certified Before operating on the power cables ensure that the network was severed Ensure an efficient connection of earthing using the specific terminals The foreseen power is 230 V 50 Hz For...

Page 13: ...right hand clockwise V 230 50 Hz CAPACITOR CHECK VALUE ON PLATE LABEL ON ENGINE V2 W2 U2 W1 U1 V1 L3 L1 L2 V 400 50 Hz TO REVERS THE ROTATION EXCHANGE PHASES L1 L2 left hand anticlockwise capacitor C...

Page 14: ...he Technical Assistance of Impresind Srl do not start the product if is shows any of the anomalies stated above To invert the direction of rotation of the engine after cutting off the electric power t...

Page 15: ...g prescription for the personnel The maintenance personnel are obliged to wear specific clothing and to use personal protection devices 4 3 Residual risks Pay attention to the movement of the ventilat...

Page 16: ...to work constantly to contrast the natural elevation of hot air to the ceiling For a better management of the system and to achieve energetic savings it is necessary that the heating system has an env...

Page 17: ...are visible by all access areas Record on a register all the maintenance carried out making sure to sign date hour type of maintenance and name of the personnel that carried out the maintenance The e...

Page 18: ...WITH THE SECURITY SYSTEMS DEACTIVATED OR DISCONNECTED DEACTIVATE OR TRICK THE ALARM SIGNALS APPLIED ON THE PRODUCT USE THE PRODUCT WITH THE METALLIC PROTECTIONS REMOVED IGNORE THE WARNINGS AND SIGNS A...

Page 19: ...alised personnel with correct instruments and personal protection devices Do not smoke and not use free flames In case of dismantling or alienation of the system it is necessary to recover all the mat...

Reviews: