STEP 2 (See Diagram 2)
A.) Attach an Upright Beam (#4) to the Right Stabilizer (#1) and the Right Support (#5). Secure
the Upright Beam to the Right Stabilizer with two M10 x 2 3/8” Carriage Bolts (#56), one 7”
x 3 1/8” Bracket (#26), two Ø ¾” Washers (#67), and two M10 Aircraft Nuts (#69).
B.) Secure the Upright Beam to the Right Support with two M10 x ¾” Allen Bolts (#63) and two
Ø ¾” Washers (#67).
C.) Repeat Steps A and B above to install the other side.
D.) Place the Upper Frame (#8) onto the two Upright Beams. Secure each end of the Upper
Frame with three M10 x 5/8” Allen Bolts (#64) and Ø ¾” Washers (#67).
E.) Securely tighten all the Nuts and Bolts previously installed.
6
Summary of Contents for POWERHOUSE CLUB POWER 8
Page 4: ...SQUAT LAT PULL HARDEWARE PACK 3...
Page 5: ...SQUAT LAT PULL HARDEWARE PACK 4...
Page 10: ...CABLE LOOP DIAGRAM 9...
Page 12: ...DIAGRAM 5 11...
Page 14: ...DIAGRAM 6 13...
Page 15: ...EXPLODED DIAGRAM 14...
Page 17: ...MULTI PURPOSE BENCH HARDWARE PACK 16...
Page 23: ...22...