STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it
with an Axle (#17), two M10 x ¾” Allen Bolts (#35), and two
∅
¾” Washers (#41).
B.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two
Foam Tubes halfway through the holes on the Leg Developer (#5). Push six Foam
Rolls (#24) onto the Tubes from both ends. Plug six Foam Roll End Caps (#25) into
the ends.
C.) Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a
Spring Clip (#22) to the Sleeve.
DIAGRAM 4
20
Summary of Contents for POWERHOUSE CLUB POWER 8
Page 4: ...SQUAT LAT PULL HARDEWARE PACK 3...
Page 5: ...SQUAT LAT PULL HARDEWARE PACK 4...
Page 10: ...CABLE LOOP DIAGRAM 9...
Page 12: ...DIAGRAM 5 11...
Page 14: ...DIAGRAM 6 13...
Page 15: ...EXPLODED DIAGRAM 14...
Page 17: ...MULTI PURPOSE BENCH HARDWARE PACK 16...
Page 23: ...22...