STEP 7 (See Diagram 7 & Cable Loop Diagram)
A.) Attach the 128” Lower Cable (#36) to the open bracket on the bottom of the Leg
Developer (#7).
Note:
The Ball Stopper on the cable should be in front of the pulley
not on top.
B.) Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#72), two Ø
¾” Washers (#83), and one M10 Aircraft Nut (#85).
C.) Draw the Cable underneath the Pulley to the opening on the Leg Developer Holder
(#1). Attach a Pulley to the opening. Secure it with one M10 x 2 3/8” Allen Bolt (#71),
two Pulley Bushings (#50), two Pulley Covers (#91), and one M10 Aircraft Nut (#85).
D.) Draw the Cable underneath the Pulley along the Main Base Frame to the opening on
the bottom of the Lower Vertical Frame (#3). Repeat Procedure C above to install
another Pulley.
E.) Pull the Cable upward to the Crossed Double Floating Pulley Bracket (#20)
previously installed in Step-6.
F.) Attach a Pulley to the Bracket. Secure it with one M10 x 2” Allen Bolt (#87), two Ø ¾”
Washers (#83), two Cable Retainers (#89), and one M10 Aircraft Nut (#85).
G.) Draw the Cable around the Pulley then downward to the open bracket on the Main
Base Frame. Repeat F to install another Pulley.
H.) Pull the Cable around the Pulley then upward to the Double Floating Pulley Bracket
(#31) previously installed in Step-5. Repeat F to install another Pulley.
I.) Draw the Cable around the Pulley then pull downward to the bracket on the back of
the Upper Vertical Frame (#14). Secure the Cable to the bracket with one M10 x 1”
Allen Bolt (#73), two Ø ¾” Washers (#83), and one M10 Aircraft Nut (#85).
J.) Adjust the tension of the Cable by adjusting the Pulley position on the Double
Floating Pulley Bracket (#31). If the cables are too loose, move up the Pulley. If the
cables are too tight, move down the Pulley.
K.) For best performance of the machine, adjust the Cables so the Selector Stem
(Top Plate) on the weight stack is ¼” above the first plate. While pinning the
weight stack, push down on the Selector Stem to close up the gap then pin the
plates. This will remove the slack in the cable system so the range of motion is
smooth and tight.
L.) Connect the Shiver Bar (#19) to a Long Chain (#48) with a C-clip (#53). Connect the
Long Chain to the Lower Cable with another C-clip.
17
Summary of Contents for APEX AX-2109.1
Page 7: ...HARDWARE PACK 6 ...
Page 9: ...DIAGRAM 1 8 ...
Page 11: ...DIAGRAM 2 10 ...
Page 14: ...CABLE LOOP DIAGRAM 13 ...
Page 16: ...DIAGRAM 5 15 ...
Page 19: ...DIAGRAM 7 18 ...
Page 20: ...EXPLODED DIAGRAM 19 ...