STEP 5 (See Diagram 5 & Cable Loop Diagram)
A.) Attach the 138” Upper Cable (#35) to the opening at the front of the Upper Frame
(#4).
Note:
The Ball Stopper on the cable should be underneath the Frame.
B.) Attach a Pulley (#63) to the opening. Secure it with one M10 x 2 3/8” Allen Bolt
(#71), two Pulley Bushings (#50), and one M10 Aircraft Nut (#85).
C.) Draw the Cable towards the back of the machine to the second opening on the
Upper Frame. Repeat Procedure B above to install a second Pulley with two
Pulley Covers (#91).
D.) Draw the Cable around the Pulley then pull back towards the opening on the
Front Press Base (#11).
E.) Attach a Pulley to the opening on the Front Press Base (#11). Secure the Pulley
with one M10 x 5 1/8” Allen Bolt (#68), two Pulley Covers (#91), and M10 Aircraft
Nut (#85).
F.) Draw the Cable around the Pulley then to the opening on the Upper Vertical
Frame (#14). Repeat Procedure B above to install another Pulley with two Pulley
Covers (#91).
G.) Draw the Cable around the Pulley then downward. Attach the Cable to the upper
holes on the two Double Floating Pulley Brackets (#31).
H.) Attach a Pulley to the Brackets. Secure it with one M10 x 2” Allen Bolt (#87), two
Ø ¾” Washers (#83), two Cable Retainers (#89), and one M10 Aircraft Nut (#85).
I.)
Leave the bracket hanging for now.
J.) Pull the Cable upward to the open bracket underneath the Upper Frame (#4).
Repeat H to install a Pulley.
K.) Pull the Cable downward between the two Guide Rods to the Selector Rod (#17).
Fully thread the bolt at the end of the Cable into the top opening on the Selector
Rod.
L.) Connect the Lat Bar (#18) to a Short Chain (#49) with a C-clip (#53). Then
connect the Short Chain to the Upper Cable with another C-clip.
14
Summary of Contents for APEX AX-2109.1
Page 7: ...HARDWARE PACK 6 ...
Page 9: ...DIAGRAM 1 8 ...
Page 11: ...DIAGRAM 2 10 ...
Page 14: ...CABLE LOOP DIAGRAM 13 ...
Page 16: ...DIAGRAM 5 15 ...
Page 19: ...DIAGRAM 7 18 ...
Page 20: ...EXPLODED DIAGRAM 19 ...