background image

RAPAX 300 V2 

RAPAX 300 SOL V2 

Instruction and

 

recommendation booklet

IE

Summary of Contents for Rapax 300 Sol V2

Page 1: ...RAPAX 300 V2 RAPAX 300 SOL V2 Instruction and recommendation booklet IE...

Page 2: ......

Page 3: ...the regulations in force and the principles of good practice In compliance with the legislation in force the systems must be designed by qualified professionals within the dimensional limits establis...

Page 4: ...1 Remote panel 18 4 2 Description of symbols 18 4 3 Main menu 18 4 4 System settings 19 4 5 Parameters to be adjusted upon installation 19 4 6 Selection of operating modes 19 4 7 Controls lock 20 4 8...

Page 5: ...nd extraordinary maintenance opera tions which might require emptying filling the boiler In order to prevent any stability and safety issues it is obligatory to secure theboiler tothefloor ona flatsur...

Page 6: ...s can be hazardous due to high pressure and electrical parts Thermodynamic boilers must be installed commissioned and maintained by trained and qualified personnel only 2 2 TECHNICAL FEATURES Dimensio...

Page 7: ...4 Terminals unit 15 Front cover 16 Compressor 17 Compressor jacket 18 Column support guide 19 Heating element 20 Heating element 21 Control console 22 Control unit 23 Front column 24 Plug in the lower...

Page 8: ...by temperature exceeding 5 C and preferably insulated from the home s heated rooms Recommended room basement or semi base ment room where the temperature is higher than 10 C all year round garage boi...

Page 9: ...ying the room and recovery of waste calories from washing machines and tumble dryers Basement room recovery of free calories re leased by the floor and walls of the basement 2a configuration installat...

Page 10: ...entially harmful for the duration in service of your boiler Connection to an attic In the presence of inadequate isolation between the building and the relative attics this type of installation may in...

Page 11: ...downward gradient to remove any expansion water generated by the heating process or drainage water coming from the boiler itself The pipes used must tolerate a temperature of 100 C and a pressure of...

Page 12: ...hase 230V AC power supply Con nect the boiler with a cable having conductors with 2 5mm section Installationshallconsistof A thermal magnetic breaker or 16A multi pole fuse with contacts compliant wit...

Page 13: ...13 3 11 3 12 The ducts must be fitted to the adjustable air intake and outlet vents Specific cable duct...

Page 14: ...LER AND PHOTOVOLTAIC SYSTEM Legend A3 Integrated P C B B2 Storage tank NTC probe K1 Relay for DHW request R1 Resistor 2 2 K Legend A3 Integrated P C B B2 Storage tank NTC probe N B with this configura...

Page 15: ...1 Immersion heater 12 Domestic hot water sensor 13 High pressure sensor 14 Compressor protection thermostat 15 Compressor engage condenser 16 Compressor 17 Hot gas valve 18 Control panel Colour code k...

Page 16: ...fully to set param eters date and time air ducts installation recirculation loop photovoltaic operating bands anti legionella system After setting the parameters check the op eration of the boiler see...

Page 17: ...OPTIONAL Key 1 Flat solar collectors 2 Electronic control unit 3 Single solar circulation unit 4 Expansion vessel 5 Safety valve 6 System probe and venting unit 7 Mixing valve 8 Rapax Sol V2 boiler 9...

Page 18: ...initial settings The BOOST can be interrupted at any time BOOST pause OPERATION mode Chose the operating mode Select AUTO or MANUAL see section 4 6 Operating modes ABSENCE mode Schedule an absence It...

Page 19: ...eaches 62 C 1 4 times a month depending on the desired setting Emergency mode Enabling this mode allows continuous opera tion only with the electrical integration Recirculation loop This mode should b...

Page 20: ...tank Our product permanently calculates depending on the air temperature and the water temperature which energy is cheaper This SMART Energy function can decide to start heating with the heat pump and...

Page 21: ...tightening Fill the boiler by leaving a hot water tap open if the water flows it indicates that the boiler is full Check the water tightness of the seal and only then replace the thermostat and its fi...

Page 22: ...eplace the probe reference A4 Contact the installer Ineffi cient de frost ing func tion De icing malfunction HP stoppage Heating with electrical integration Check the connections or replace the coil r...

Page 23: ...r cable on the terminal board so that the rear cover of the heat pump can be removed Fig 5 2 Remove the five screws from the cover with a screwdriver Fig 5 3 Access to the auxiliary electric unit of t...

Page 24: ...e electrical integration does not work Faulty electrical thermostat Faulty heating element Replace the thermostat Replace the heating element Outflow of condensates The boiler is not properly levelled...

Page 25: ...ith regulations standards professional rules especially Missing or incorrectly fitted new safety unit modification of calibration etc Sleevings cast iron steel or insulating miss ing on hot water conn...

Page 26: ...herein 6 PRODUCT FICHE IN COMPLIANCE WITH REGULATION 812 2013 Parameter value Energy efficiency in normal climate conditions 127 Energy efficiency in colder climate conditions 103 Energy efficiency in...

Page 27: ...he package of products provided far in this fiche may not correspond to its actual energy efficiency once installed in a building as the efficiency is influenced by fur ther factors such as heat loss...

Page 28: ...efficiency under colder and warmer climate conditions Colder 0 2 x Warmer 0 4 x Declared load profile Solar contribution From fiche of solar device 1 ___ 2 1 1 x ___ 10 x ___ ____ ____ Auxiliary elect...

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ...rgas Italia immergas com Immergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 041168 rev ST 003...

Reviews: