17
1
3
4
5
2-14
2
Probe housing for solar system or boiler (for
SOL versions only)
(Fig. 2-14)
:
1 -
Pull out the plug and foam insert beside the
internal exchanger.
2 -
Push the probe through the plug (if it has a
suitable hole).
3 -
Insert the probe into the conduit, ensuring it is
placed correctly at the bottom of the housing.
4 -
Put the foam insert back, and clip the plug
onto the product.
2.7 COMMISSIONING.
Filling the water heater.
- Open the hot water taps.
- Open the cold water tap on the safety device
(ensure the unit emptying valve is closed).
- Run the hot water from the taps then close
them: the water heater is now full.
- Check water tightness of the pipe fittings.
- Check correct operation of hydraulic devices by
opening the discharge valve of the safety device
to eliminate any residues from inside the relief
valve.
Commissioning.
Note:
if the water heater has been tilted, wait at
least 1 hour prior to commissioning.
- Turn on the water heater.
- Check that the screen (4 Fig. 3-1) does not
display errors.
- During first power-up, the adjustment in-
structions are displayed on the screen. Follow
the on-screen instructions carefully to set
parameters (date and time, air ducts, language,
recirculation, photovoltaic, operating time
slots, anti-legionella system).
- After setting the parameters, check the opera-
tion of the water heater (see section “Operation
check”).
To go back to the settings, refer to the paragraph
“System settings” or ”Installation parameters”.
Operation check.
The parameters can be accessed in INSTALLER
MODE.
Hold down the Menu button (2 Fig. 3-1) and
turn the selector switch (1 Fig. 3-1) by a half
turn to the right.
To exit the installer mode, proceed in the same
way or wait for 10 minutes.
Access settings
→
(
) →
Test
→
Actuators.
The "TEST" menu allows you to start the actua-
tors of the device in Forced mode.
Heat pump
Start of the
fan then of
the compres-
sor
Fan
at low speed
Operation of
the fan at low
speed
at high speed
O p e r at i on
of the fan at
high speed
Additional
electric backup
C o m m i s -
sioning of
electrical in-
tegration
Defrost
Starting of
the fan, then
the compres-
sor and pop
noise of the
coil
Boiler
integration
Sending the
signal to the
b o i l e r t o
request hy-
draulic inte-
gration
Temperature
sensors
Display of
t e m p e r a -
tures: Incom-
ing air, High
evaporator,
Low evapo-
rator, Return
compressor,
Hot water