Immergas NATURAL SOL 150 V2 Instructions And Recommendations Download Page 32

32

1-32

k

k5

k6

k4

k4

k2

k2

k1

k3

k8

k7

k9

k9

N

L

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

1.11 ELECTRICAL RESISTANCE.

Ref.

Description

Q.ty

k1 Closing plate

1

k2 Nut

8

k3 Storage tank gasket

1

k4 Washer

8

k5 Flange

1

k6 Gasket

1

k7 1.5 kw electric resistance

1

k8 Solar storage tank anode

1

k9 Screw

4

N.B.: before closing the external cover (k1) 

regulate the thermostat of the resistance 

(k7) to the desired temperature (the 

device is deactivated on the first notch).
The resistance must be regulated and 

started only for emergency situations 

and in the case of low environment 

temperature.

N.B.: the electric resistance must be connected 

by a qualified technician. All of the con-

nections must be performed following 

the diagram shown below.

N.B.: the electric connections must only be 

made on the thermostat. DO NOT 

connect the electric power supply to the 

resistance by-passing the thermostat.

N.B.: the resistance must be connected to the 

power supply via a bipolar safety switch. 

The distance between the connectors 

must be AT LEAST 3 mm.

Safety button

Thermostat

1.12 SOLAR SYSTEM FILLING.

The steps stated below must be performed before 

commissioning:

- washing the system and sealing test

If copper piping is uses and strong braze-welding 

is performed, the system must be washed to re-

move the residues of braze-welding. Successively 

perform the sealing test.
When installation has been completed, fill the cir-

cuit using the hole on the top of the tank (remove 

the 3/4" cap located near the flange). To facilitate 

filling, it is recommended to remove the safety valve 

in order to use the hole as a vent. On completion 

re-mount the cap and the safety valve.

N.B.:  the circuit must be loaded slowly in a way 

to remove the air it contains completely.

1.13 SYSTEM FILLING WITH GLYCOL.

The glycol must be mixed with the water in a con-

tainer before the system is filled (e.g. 40% glycol 

and 60% water allow an anti-freeze resistance to 

temperature of -22°C).

The propylene glycol is studied especially for 

solar applications as it maintains its features 

within the -32÷180°C interval. Moreover, it is 

non-toxic, biodegradable and biocompatible.
Do not use automatic filling systems.
The solar collector must be filled immediately 

with the water and glycol mixture, since after 

washing it may still contain water (freezing 

hazard).

Use the following table as a reference:

Concentration %

Temperature °C

10

-5

20

-8

30

-16

40

-22

50

-32

Unless strictly necessary, it is recommended 

not to mix the protective liquid at a concen-

tration > 50% (protection to -32°C).
When the system has been completed, make 

sure that the water pipes have been isolated 

correctly.
Do not fill the system in conditions with strong 

insolation and with the manifolds at high 

temperatures.
Make sure that all air bubbles have been com-

pletely eliminated.

STD.005441/000

Summary of Contents for NATURAL SOL 150 V2

Page 1: ...Instructions and recommendations Installer User Maintenance technician IE SOLAR SYSTEM WITH NATURAL CIRCULATION NATURAL SOL 150 200 V2 1 042024ENG STD 005441 000...

Page 2: ...STD 005441 000...

Page 3: ...in force and the principles of good practice In compliance with the legislation in force the systems must be designed by qualified professionals within the dimensional limits established by the Law I...

Page 4: ...r collectors 9 1 6 Kit composition 9 1 7 Installation on sloping roof 11 1 8 Free installation 21 1 9 System connection 31 1 10 By pass kit optional 31 1 11 Electrical resistance 32 1 12 Solar system...

Page 5: ...5 1 1 INSTALLER USER MAINTENANCE TECHNICIAN 1 INSTALLATION 1 1 PACKAGING It must be stored in a dry place protected from humidity in its original closed packaging STD 005441 000...

Page 6: ...2 2705 580 A 580 15 30 1 3 0 6 4 8 2000 2088 37 2002 1192 150 L mm 200 L mm A 1058 1290 INSTALLER USER MAINTENANCE TECHNICIAN 1 2 OVERALL DIMENSIONS FREE INSTALLATION INSTALLATION ON SLOPING ROOF STD...

Page 7: ...7 1 3 250 870 134 620 250 1970 100 100 134 1870 INSTALLER USER MAINTENANCE TECHNICIAN 1 3 CLEARANCES WITH BRACKETS FOR SLATES TILES OPTIONAL STD 005441 000...

Page 8: ...297 360 1 4 TECHNICAL DATA Forecastofannualperformanceaccordingtothe EN12976 2StandardforEuropeaninstallations 150 L Storage tank performance Performance indicators just for solar and solar pre heati...

Page 9: ...ndards before starting the system the solar collector must be covered to protect the absorber from overheating and the operator from any burns The system must only be filled after all the hydraulic co...

Page 10: ...s t u v w x y z aa ab ad ae ac af 1 5 INSTALLER USER MAINTENANCE TECHNICIAN Installation drawings key a Unmistakeable component identification 1 Sequential identification of the operation to perform...

Page 11: ...USER MAINTENANCE TECHNICIAN 1 7 INSTALLATION ON SLOPING ROOF N B during installation of the components represented below pay full attention to the holes used and their correct recipro cal positioning...

Page 12: ...4 c d c d ac z aa aa z ac aa z aa z 3 6 5 6 5 ab s ac s i aa z h s ac s i z aa ab h aa z z aa z aa z aa INSTALLER USER MAINTENANCE TECHNICIAN Assembletheupperframefollowingoperations 3 to 10 STD 0054...

Page 13: ...13 1 8 e 9 10 7 8 10 9 e z ab aa z aa ab aa z ab aa z ab INSTALLER USER MAINTENANCE TECHNICIAN N B assemble the e bars without fully tight ening the nuts aa STD 005441 000...

Page 14: ...ab z aa f INSTALLER USER MAINTENANCE TECHNICIAN Install the 4 frame fixing laminate f using the holes present on the bars b selecting from those suitable in a way to centre the laminates with the pit...

Page 15: ...12 13 f ad ae ad ae 1 10 INSTALLER USER MAINTENANCE TECHNICIAN N B fix the laminates f to the roof using the mostsuitabledeviceforthetypeofroofon which the installation is to be carried out STD 005441...

Page 16: ...N B if the installer does not deem it appropri ate to apply the complete weight of the structure on the tiles it is possible to fix the same using the brackets for slates tiles g supplied as an optio...

Page 17: ...11 15 11 15 11 15 11 15 11 15 ab z aa aa z ab ab z aa ab z aa 1 13 INSTALLER USER MAINTENANCE TECHNICIAN Join the lower frame fixed to the roof to the upper frame as represented below sequences 14 an...

Page 18: ...HNICIAN After positioning the manifold j as shown in the figure slide the upper mount bar e down until it touches the manifold itself At the end tighten the nuts used to assemble both bars e N B do no...

Page 19: ...ENANCE TECHNICIAN Position the storage tank Cylinder on the two calenderedbrackets i selectingthemostsuitable hole on the basis of the inclination of the slope At the end of installation the upper fit...

Page 20: ...11 22 t 11 23 11 24 11 24 11 25 11 26 v u u p w 1 17 1 18 INSTALLER USER MAINTENANCE TECHNICIAN N B the safety valves v and w must be mounted in a way that any emission of steam caused by overheating...

Page 21: ...z z aa z aa z aa INSTALLER USER MAINTENANCE TECHNICIAN 1 8 FREE INSTALLATION N B during installation of the components represented below pay maximum at tention to the holes used and the correct recipr...

Page 22: ...22 1 20 e 5 6 4 4 6 5 e z ab aa z aa ab aa z ab aa z ab INSTALLER USER MAINTENANCE TECHNICIAN N B assemble the e bars without fully tight ening the nuts aa STD 005441 000...

Page 23: ...23 1 21 z 7 7 7 7 8 8 8 8 8 8 8 8 8 aa ab c ab z aa ab z aa ab o o ab c z aa z aa INSTALLER USER MAINTENANCE TECHNICIAN Assemble the rear vertical mount sequences 7 and 8 STD 005441 000...

Page 24: ...24 1 22 9 a 10 10 10 9 10 a a ab z aa aa z a ab INSTALLER USER MAINTENANCE TECHNICIAN Fix the frame to the two frame structure bars a STD 005441 000...

Page 25: ...11 12 12 12 12 12 12 12 12 z aa ab aa z ab ab aa z c aa z c 1 23 INSTALLER USER MAINTENANCE TECHNICIAN Assemble the rear mount to the frame and to the two horizontal cross members Sequences 11 and 12...

Page 26: ...26 13 ab 13 14 14 14 14 14 14 14 14 z aa z aa ab z aa ab ab aa z n n 1 24 INSTALLER USER MAINTENANCE TECHNICIAN Fix the two frame reinforcement bars n se quence from 13 to 14 STD 005441 000...

Page 27: ...le device for the type of surface on which installation must be carried out After positioning the manifold j as shown in the figure slide the upper mount bar e down until it touches the manifold itsel...

Page 28: ...ENANCE TECHNICIAN Position the storage tank k on the two calen dered plates i selecting the most suitable hole on the basis of the inclination of the slope At the end of installation the upper fitting...

Page 29: ...v p p r w INSTALLER USER MAINTENANCE TECHNICIAN N B the safety valves v and w must be mounted in a way that any emission of steam caused by overheating of the system does not cause damage to objects o...

Page 30: ...30 1 30 25 y 27 25 27 29 28 26 28 29 m y q u q y l y u 26 29 x 29 x INSTALLER USER MAINTENANCE TECHNICIAN STD 005441 000...

Page 31: ...TIONAL This kit allows you to install a bypass on the DHW circuit of a storage tank unit with natural circulation to keep it from freezing during the winter season see the relative instruction sheet G...

Page 32: ...idues of braze welding Successively perform the sealing test When installation has been completed fill the cir cuit using the hole on the top of the tank remove the 3 4 cap located near the flange To...

Page 33: ...yearly cleaning and maintenance contract with an authorised local company The frequency and methods of maintenance on the Immergas Solar Systems leave any control and maintenance obligations prescribe...

Page 34: ...ircuit and DHW circuit Checksealingoftheassemblyelements screws bolts plugs structure elements etc Check that the system is in good condition Vent Any air present in the system must be bled upon start...

Page 35: ...35 STD 005441 000...

Page 36: ...S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 042024ENG rev ST 003657 000 07 18 Inglese per IRLA...

Reviews: