background image

15

IN

ST

ALLER

U

SER

MAINTE

NA

NCE TECHN

IC

IAN

2.4  BOILER IGNITION.

Before ignition make sure the central heating 

(15) indicates a pressure of 1 - 1.2 bar;

- Open the gas cock to the boiler.
- Turn the main selector switch (12) taking it 

to the Domestic Hot Water/Comando Amico 

Remoto

V2

 (CAR

V2

) (

) or Domestic Hot 

Water and Central heating position(

).

N.B.: 

once  the  main  switch  (12)  has  been 

positioned the green indicator light (1), which 

indicates the presence of voltage in the boiler, 

will remain on.
During normal boiler functioning the LEDs from 

5 to 11 indicate the temperature of the outlet 

water of the main heat exchanger.

Attention: 

indicates that there is an anomaly present, refer 

to the successive paragraph.
Functioning of the boiler in domestic hot water 

mode and in central heating mode is indicated 

respectively by the switch-on of LED 3 or LED 4.

 Operation with Comando Amico Remoto

V2

 

(CAR

V2

)(Optional). With selector switch (12) 

in position (

) and CAR

V2

 connected, 

the boiler selector switches (13) and (14) are 

are set from the control panel of the CAR

V2

Connection to the CAR 

V2

 is indicated by LEDs 

). 

Also in the presence of CAR

V2

 remote control 

indications of the temperature and any faults 

are maintained on the control panel.

 

Operation with Comando Amico Remoto

V2

 

(CAR

V2

).  With  the  selector  switch  (12)  in 

position  (

)  the  heating  adjustment 

selector switch is excluded, the domestic hot 

water temperature is adjusted by the selector 

switch (13). With the selector switch in position 

(

)  the  heating  adjustment  selector 

switch (14) is used to regulate the temperature 

of radiators, while selector (13) continues to be 

used for domestic hot water. Turn the selector 

switches clockwise to increase the temperature 

and anti-clockwise to decrease it.

N.B.: 

the boiler may start-up automatically if the 

anti-freeze function is activated.
With the boiler main switch in stand-by position 

(

) the boiler does not produce hot water but 

safety functions are guaranteed, such as: pump 

anti-block, anti-freeze and three way anti-block.

2.5  FAULT AND ANOMALY SIGNALS.

of LED 1.

Fault code

  

LED  

Remote 

display

No ignition block

Led 5 (

)

E01

Flue pressure 

switch fault

Led 6 (

)

E11

pressure

Led 7 (

)

E10

Circulation 

Led 8 (

)

E27

Flow probe 

fault

Led 9 (

)

E05

Domestic hot water 

probe fault

Led 10 (

)

E06

Safety  thermostat 

block (overheating), 

ue  thermostat  or 

control fault

Led 11 ( )

E02

Contacts resistance 

block

LED 6 (

) and 

Led 10 (

simultaneous 

E02 + E04

alternating 

block

LED 2 ( ) and 

Led 11 ( ) 

simultaneous 

E02 + E20

alternating 

Comando Remoto 

communication 

loss or RS232 

LEDs 3 and 4 

alternating 

(

)

E31

Ignition block.

with each demand for room central heating or hot 

water production. If this does not occur within 

10 seconds, the boiler remains in stand-by for 30 

seconds, try again and if the second attempt fails 

eliminate the “start-up block” it is necessary to 

turn the main switch (12) taking it temporarily to 

the Reset position or using the Reset key on the 

CAR

V2

in inhibited for at least one hour. One attempt is 

gained every hour for a maximum of 5 attempts. 

may be necessary to eliminate the “ignition block”. 

Or in the event the heat exchanger or the trap are 

clogged and cannot drain the condensation. If this 

Fumes pressure switch fault. 

intake or exhaust pipes are blocked or in case of 

a fan fault. If normal conditions are restored the 

boiler restarts without having to be reset. If this

technician for assistance. 

Water pressure 

to guarantee the correct functioning of the boiler 

is not detected. Check that the system pressure 

is between 1÷1.2 bar.

water  circulating  in  the  primary  circuit;  the 

causes can be:

devices are closed on the heating circuit and 

that the system is free of air (deaerated);

- circulating pump blocked; free the circulating 

pump.

If this phenomenon occurs frequently, contact a

assistance. 

Delivery probe fault. 

If the board detects an 

fault on the system NTC delivery probe, the boiler

technician for assistance.

 

Domestic hot water probe fault. 

If the P.C.B. 

detects a fault on the DHW NTC probe 

of LED 10. In this case, the boiler continues to 

produce DHW but not with optimal performance. 

Moreover, the anti-freeze function is prevented, 

for assistance.

Overheating block.

 During operation, if a fault 

causes excessive fumes overheating internally, or 

an over-temperature block is triggered in the 

“overheating block” it is necessary to turn the 

main switch (12) taking it temporarily to the 

Reset position or using the Reset key on the CAR

V2

If this phenomenon occurs frequently, contact a 

Contacts resistance block.

case of faults to the safety thermostat (over-

boiler  does  not  start.  To  eliminate  “contacts 

resistance block” the main selector (12) must 

be turned to the Reset position temporarily. If 

this phenomenon occurs frequently, contact a 

Parasite  ame block. 

is occurs in case of 

a leak on the detection circuit or anomaly in 

the  ame  control  unit.  e  boiler  does  not 

main selector (12) must be turned to the Reset 

position temporarily. If this phenomenon occurs, 

Loss  of  remote  control  communication.

 

is  occurs  in  the  case  of  an  incompatible 

connection to a remote control or if there is a 

loss of communication between the boiler and 

Comando  Amico  Remoto

V2

  (CAR

V2

)  remote 

control. Try the connection procedure again by 

switch (12) to position (On). If the CAR

V2

 is still 

not detected on re-starting the boiler will switch 

to local operating mode, i.e. using the controls 

on the boiler itself. If this phenomenon occurs, 

assistance.

assistance.

Hunt Heating technician for assistance.

 / EXT

N.B.: 

Please check carefully for the selector switch

is set to the correct position when using CAR

V@ 

.

Also check correct switch position when using

own room thermostat.  Unit will not operate if

not in correct position.

Summary of Contents for HE COMBI EXTERNAL

Page 1: ...HE COMBI INTERNAL EXTERNAL INSTRUCTION INSTALLATION USER MANUAL Wall Mounted Heating Only Boiler ...

Page 2: ...for installation use and maintenance stages sites environment protection injury prevention comply with the laws in force and technical standards hed by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions and Improper installation or assembly of Immergas appliance and or components accessories kit and device...

Page 3: ...n to another type of gas 16 3 6 Possible adjustments 16 3 7 Programming the P C B 16 3 8 Automatic slow ignition function with timed ramp delivery 18 3 9 Chimney sweep function 18 3 10 Pump anti block function 18 3 11 three way anti block system 18 3 12 Radiators anti freeze function 18 3 13 P C B periodical self check 18 3 14 Casing removal 19 3 15 Yearly control and maintenance of the appliance ...

Page 4: ...incorrect operation modify or repair the appliance alone Failuretocomply withtheaboveimpliespersonal responsibility and invalidates the warranty Installation Standards All installation must comply with AS 5601 Attention wall mounting of the boiler must generator they only ensure adequate support if inserted correctly according to technical standards in walls made of solid or semi hollow brick or b...

Page 5: ...mperature in the boiler falls below 4 C the boiler is correctly connected to gas and electricity power supply circuits the boiler is powered constantly the boiler is not in no ignition block Par 2 5 the boiler essential components are not faulty In these conditions the boiler is protected against freezing to an environmental temperature of 5 C Minimum temperature 15 C If the boiler is installed in...

Page 6: ...malies temperature to be adjusted to the actual needs of the room being heated in order to obtain the desired room temperature with extreme precision and therefore with evident saving in directly by the boiler by means of the same 2 wires used for the transmission of data between boiler and chrono thermostat Comando Amico Remoto remote control V2 CARV2 Optional the voltage from the appliance Any C...

Page 7: ...of pipe of the same diameter the so called equivalent length obtained from the ration between the relative Resistance Factors All boilers have an experimentally obtainable maximum Resistance Factor equal to 100 e maximum Resistance Factor allowed corresponds to the resistance encountered with the maximum allowed pipe length for each calculations to be made to verify the possibility Positioning of ...

Page 8: ...t 21 m 1 3 Intake m Exhaust m Concentric bend 45 Ø60 100 Intake and Exhaust 16 5 m 1 Intake m Exhaust m Terminal complete with concentric horizontal intake exhaust Ø60 100 Intake and Exhaust 46 m 2 8 Intake m Exhaust m Concentric horizontal intake exhaust terminal Ø60 100 Intake and Exhaust 32 m 1 9 Intake m Exhaust m Terminal complete with concentric vertical intake exhaust Ø60 100 Intake and Exh...

Page 9: ...oiler positioning the gasket 1 which does not require lubrication with the circular projections downwards in the screws present in the kit Imitation aluminium tile installation replace the tile with the aluminium sheet 4 shaping it to half shell 6 and insert the intake exhaust pipe 5 Fit the Ø60 100 3 concentric terminal pipe up to the stop making sure that the wall sealing and joining of the elem...

Page 10: ...nents No 1 No 1 No 1 90 concentric bend 4 No 1 90 concentric bend exhaust gasket 5 No 1 90 concentric bend intake gasket 6 No 1 Gasket 8 No 1 External wall sealing plate 9 No 1 Concentric intake exhaust terminal Ø 60 100 10 Flue kit complete 60 100 Australia code 3 023633 HE external boilers HE 30 COMBI EXTERNAL The Immergas boiler when exposed to extreme wind conditions will deactivate the gas an...

Page 11: ...e the concentric intake exhaust pipe 8 with the male end smooth into the female end sure that the external wall sealing plate 7 has on the casing front 2 this will ensure proper sealing and joining of the elements Fit the cover 9 on the casing front 10 using the gasket 11 Mount the casing front 10 referring to Paragr 3 14 Product code 3 023758 available only from Hunt Heating and can be extended t...

Page 12: ... device is engaged in the event of gas supply failure and check activation time check the intervention of the main switch located upstream from the boiler and in the boiler check that the concentric intake exhaust one of the checks should be negative N B the boiler preliminary check must be carried boiler warranty is valid as of the date of testing user 1 16 CIRCULATION PUMP are supplied with a bu...

Page 13: ...estic hot water probe 13 Gas valve 14 15 Manometer 16 17 Flow probe 18 Safety thermostat 19 Flue hood 20 Primary heat exchanger 21 Ignition and detection electrodes 22 Burner 23 Air vent valve 24 System expansion vessel 25 3 bar safety valve 26 DHW heat exchanger 27 3 way valve motorised 28 Condensate drain trap 29 By pass System draining valve GAS DHW COLD INLET RETURN FLOW N B Schematic shown he...

Page 14: ...act with Heating service technician 2 2 GENERAL WARNINGS Never expose the wall mounted boiler to direct vapours from a cooking surface Use of the boiler by unskilled persons or children is strictly prohibited For safety purposes check that the concentric air intake ue exhaust terminal if tted is not blocked If temporary shutdown of the boiler is required proceed as follows a drain the heating syst...

Page 15: ... second attempt fails eliminate the start up block it is necessary to turn the main switch 12 taking it temporarily to the Reset position or using the Reset key on the CARV2 in inhibited for at least one hour One attempt is gained every hour for a maximum of 5 attempts may be necessary to eliminate the ignition block Or in the event the heat exchanger or the trap are clogged and cannot drain the c...

Page 16: ...TORE HEATING SYSTEM PRESSURE Periodically check the system water pressure between 1 and 1 2 bar If the pressure falls below 1 bar with cool circuit restore normal pressure using the valve provided by the maintenance technician N B If pressure values reach around 3 bar the safety valve may be activated In this case contact a professional technician for assistance In the event of frequent pressure d...

Page 17: ...h ensure activation of all adjustment devices ensure production of domestic hot water check ventilation and or aeration of the installation room where provided result do not commission the system 3 1 HYDRAULIC DIAGRAM Key 1 2 Flow limiter 3 Domestic hot water probe 4 System pressure switch 5 Gas valve 6 Burner 7 Sealed chamber 8 Primary heat exchanger 9 Flue hood 10 Fan 11 Flue pressure switch 12 ...

Page 18: ...e no residues of material blocking the the trap being blocked Check by means of the condensate drain cap that there are no residues Noise due to air in the system Check opening of the hood of the special air vent valve Fig 1 18 Make sure the system pressure and expansion vessel pre charge values are within the expansion vessel must be 1 0 bar the value of system pressure must be between 1 and 1 2 ...

Page 19: ...AMMING THE P C B for possible programming of several operation parameters By modifying these parameters as described below the boiler can be adapted To access the programming phase proceed as follows position the main switch on Reset for a time between 15 and 20 seconds LED 1 will start At this point re position the general selector on When the programming phase has been to choose the parameter to...

Page 20: ...ing ramp timer continuous variation Flashing LED slow 65 seconds LED 2 130 seconds LED 3 195 seconds LED 4 260 seconds LED 5 325 seconds LED 6 390 seconds LED 7 455 seconds LED 8 520 seconds LED 9 585 seconds LED 10 650 seconds Standard setting LED 11 Heating switch on delay request from Room thermostat and Comando Amico Remoto remote controlV2 CARV2 case of particular systems e g area systems wit...

Page 21: ...least once every 3 hours for 2 5 minutes 3 11 Both in domestic hot water and in domestic hot water central heating phase the boiler is equipped with a function that starts the three in operation running it for a full cycle so as to reduce the risk of the three way group becoming blocked due to prolonged inactivity 3 12 FUNCTION If the system return water is below 4 C the boiler starts up until rea...

Page 22: ... from the lateral hooks 4 and upper ones 5 Det B Det A 3 16 VARIABLE HEAT POWER N B the pressures indicated in the tables between the gas valve outlet and the combustion remove the sides 6 by loosening the screws 7 and pulling towards yourself to free the side from the seat 8 Fig 3 5 carried out using a di erential manometer small U shaped column or digital manometer with the probes inserted in th...

Page 23: ...osen the two screws 2 remove the front 3 of the boiler by pushing it upwards and at the same time pull it towards yourself to release it from the upper pins 4 remove the lower protection plate 5 by loo sening the two screws 6 remove the upper right bracket 7 by loo sening the upper screw 8 and pushing it to remove it from the screw with stop 9 remove the casing side 10 by loosening the screws 11 a...

Page 24: ...ated in the tables between the gas valve outlet and the combustion carried out using a di erential manometer small U shaped column or digital manometer with the probes inserted in the pressure test gas valve outlet and on the sealed chamber positive Key 1 Modulating Coil 2 Minimum power adjustment nut 3 Maximum power adjustment nut 4 Gas valve outlet pressure point 5 Gas valve inlet pressure point...

Page 25: ...perature C 35 85 System expansion vessel total volume l 5 1 Expansion vessel factory set pressure bar 1 Pressure relief setting bar psi 3 44 Expansion vessel capacity L 10 Water content in generator l 4 0 Head available with 1000 l h flowrate kPa m H2 O 30 2 3 1 Internal pump head kPa Hot water productionheatoutput MJ h kW 126 34 9 Speci c ow rate t25o C l min 20 Domestichot watercircuit max worki...

Page 26: ...a plate Gas Type Natural Gas LPG Internal External Gas pressure Settings Central Heating Adjusted output setting Max kPa kW New Existing System FLUSHED before instal lation of boiler Yes Water treatment No Yes Product Qty Used Litres System Volume Litres Dilution rate Litres per 100 litres Installer Details Company Address City State Postcode Installer Name PIC Licence No Commissioning completed D...

Page 27: ...e system heats up 11 Check that heat is circulating to all radiators through the manual or thermostatic radiator valve 12 ture to a mid temperature point se the water temperature to the new setting 13 Check that all radiators are hot all the way up If the radiator is cold at the top then there is usually air in the radiator Bleed the radiator Balance the system so that all radiators are hot as acc...

Page 28: ...y Contact phone number Work Completed Note 6 SERVICE RECORDS Handover Instructions No Description when done 1 Fill in all the details on this Boiler manual 2 Instruct the owner users on the correct operation of this heating system this includes how to 3 4 ple fault resolution i e power on 5 How to check and remove air in the radiators Give them a bleed key 6 7 Recommend that the boiler should be s...

Page 29: ...Contact phone number Work Completed Note Service 6 year 5 Date Service technician Name PIC Licence No Service Company Contact phone number Work Completed Note Service 7 year 6 Date Service technician Name PIC Licence No Service Company Contact phone number Work Completed Note 31 ...

Page 30: ...Contact phone number Work Completed Note Service 6 year 8 Date Service technician Name PIC Licence No Service Company Contact phone number Work Completed Note Service 7 year 9 Date Service technician Name PIC Licence No Service Company Contact phone number Work Completed Note 32 ...

Page 31: ......

Page 32: ...Cod 1 034245 rev 15 038552 001 04 2013 AS 4552 Cert GAS40003 SAI Global Hunt Heating reserves the right to modify its products and ...

Reviews: