Immergas 3.028358 Instructions And Recommendations Download Page 65

65

INS

TALLER

U

SER

M

AINTEN

AN

CE

 TECHNI

CI

AN

TECHNI

CAL

 D

AT

A

3.14  SOLAR PANELS COUPLING FUNCTION

The boiler is prepared to receive pre-heated water from a system of 

solar panels up to a maximum temperature of 65°C. In any case, it 

is always necessary to install a mixing valve on the hydraulic cir-

cuit upstream of the boiler, on the cold water inlet.

For good functioning of the boiler; the temperature se-

lected on the solar valve must be 5 °C greater with respect 

to the temperature selected on the boiler control panel.

In this condition, parameter t2 (DHW thermostat) must be set at 

“1” and parameter t3 (solar delay time) must be set for a period that 

is sufficient to receive water from a storage tank located upstream 

of the boiler. The greater the distance from the storage tank, the 

longer the stand-by time to be set.

3.15  "CHIMNEY SWEEP” FUNCTION

When activated, this function forces the boiler to variable output 

for 15 minutes.

In this state, all adjustments are excluded and the safety thermo-

stat and the limit thermostat functions remain active. To activate 

the chimney sweep function, press the “

” button until acti-

vation of the function in the absence of DHW requests.

Its activation on the boiler display is confirmed by the indicators 

flashing at the same time (

,  ), while on the CAR

V2

 (optional) 

it is reported as “ERR>07”.

This function allows the technician to check the combustion pa-

rameters.

Once the function is activated, it is possible to select whether to 

make the check in C.H. status or D.H.W. status by opening any hot 

water cock adjusting the power via the buttons (

).

The maximum power than can be supplied (99 %) is relative to the 

power set by parameter “P2” (Par. 13).

The central heating or D.H.W. operating mode is displayed by the 

relative symbols 

 or 

.

After the checks, deactivate the function by switching the boiler 

off and starting it again using “ ”.

The boiler needs a certain amount of time to stabilise it-

self before carrying out a combustion parameters check. 

It is thus necessary to wait for the boiler to carry out a 

self-diagnosis test, which is signalled by the (

) flash-

ing symbol. Once the symbol stops flashing, it is possible 

to check the combustion parameters.

3.16  PUMP ANTI-BLOCK FUNCTION

The boiler has a function that starts the pump at least once every 

24 hours for the duration of 30 seconds in order to reduce the risk 

of the pump becoming blocked due to prolonged inactivity.

3.17  THREE-WAY ANTI-BLOCK SYSTEM

Both in “domestic hot water” and in “domestic hot water-central 

heating” phase the boiler is equipped with a function that starts 

the three-way motorised group 24 hours after it was last in opera-

tion, running it for a full cycle so as to reduce the risk of the three-

way group becoming blocked due to prolonged inactivity.

3.18  RADIATORS ANTIFREEZE FUNCTION

If the system return water is below 4°C, the boiler starts up until 

reaching 42°C.

3.19  P.C.B. PERIODICAL SELF-CHECK

During functioning in central heating mode or with boiler in 

standby, the function activates every 18 hours after the last boiler 

check/power supply. In case of functioning in domestic hot water 

mode the self-check starts within 10 minutes after the end of the 

withdrawing in progress, for duration of approx. 10 seconds.

During the self-check the boiler remains inactive. Noti-

fications included.

3.20  AUTOMATIC VENTING FUNCTION

In the case of new central heating systems and in particular mode 

for floor systems, it is very important that deaeration is performed 

correctly. The function consists of the cyclic activation of the 

pump (100 s ON, 20 s OFF) and the 3-way valve (120 s D.H.W., 120 

s C.H.).

The function is activated by pressing buttons “

” + “

” at 

the same time for 5 seconds with boiler in stand-by.

If the boiler is connected to the CAR

V2

 the “stand-by” func-

tion can only be activated via the remote control panel.

The function lasts for 18 hours and it can be stopped by simply 

pressing the button “

”.

Activation of the function is signalled by the countdown shown 

on the indicator (

).

Summary of Contents for 3.028358

Page 1: ...Instructionsandrecommendations Installer User Maintenancetechnician 1 042016ENG 1 042016ENG IE VICTRIXOMNIA...

Page 2: ...2...

Page 3: ...38 1 32 Main components 39 2 Instructions for use and maintenance 40 2 1 General recommendations 40 2 2 Cleaning and maintenance 42 2 3 Control panel 42 2 4 Boiler use 43 2 5 Fault and anomaly signals...

Page 4: ...indications for installa tion useandmaintenancestages Incompliancewiththelegislationinforce thesystemsmustbedesignedbyqualifiedprofessionals withinthedimensional limitsestablishedbytheLaw Installation...

Page 5: ...herequirementsofstandardUNIENISO9001 2015 ForfurtherdetailsontheproductCEmarking requestacopyoftheDeclarationofConformityfromthemanufacturer specifyingthe appliancemodelandthelanguageofthecountry Them...

Page 6: ...WARNINGS Strictlyfollowalloftheindicationsnexttothepictogram Failuretofollowtheindicationscangeneratehazardsituations resultinginpossibleminorinjuriestothehealthofboththeoperatorandtheuseringeneral a...

Page 7: ...varying the type of installation the classification of theboileralsovaries precisely Type B23 or B53 boiler if installed using the relevant terminal for air intake directly from the room in whichtheb...

Page 8: ...rminals are not ob structed Check that no flue gas recirculation is foundintheairsamplepoints Allowthe appliance to reach the maximum heat output theCO2 valuemeasuredintheair must be less than 10 of t...

Page 9: ...appropriate support only if in stalled correctly according to the rules of good practice follow ingtheinstructionsonitsinstructionsleaflet Therecessedframefortheboilerisnotasupportingstructureand must...

Page 10: ...notallowthe fluegastopass TypeBopenchamberboilersmustnotbe installedinplaceswherecommercial ar tisan or industrial activities take place whichuseproductsthatmaydevelopvol atile vapours or substances e...

Page 11: ...m AC Domestichotwateroutlet G Gassupply AF Domestichotwaterinlet R Systemreturn 1 Boilerdirecthydraulicconnection 2 Wall mounted hydraulic connection with Im mergasDINtemplate Height mm Width mm Depth...

Page 12: ...g circuit of Immergas boilers resist ethylene and propylene glycol based antifreeze liquids ifthemixturesarepreparedperfectly Minimumtemperature 15 C Protectthedomestichotwatercircuitagainstfreezingby...

Page 13: ...therelativeseats Fig 5 The boiler 4 is now mounted inside the recessed frame 1 Fig 6 1 2 3 3 4 1 4 2 2 5 1 4 6 1 6 BOILERCONNECTIONGROUP OPTIONAL The connection unit consisting of all the necessary pa...

Page 14: ...of each connection between the appliance and the gas system This cock if suppliedbytheappliance smanufacturer canbedirect lyconnectedtotheappliance i e downstreamfromthe pipesconnectingthesystemtothe...

Page 15: ...stewaters In the event condensate is not discharged into the wastewater drainage system a condensate neutraliser must be installed to ensurecompliancewiththeparametersestablishedbythelegisla tioninfor...

Page 16: ...withoutplug Thepowersupplycablemustbeconnect ed to a 230V 10 50Hz mains supply respecting L N polarity and earth con nection this network must also have a multi pole circuit breaker with class III ov...

Page 17: ...interveneonthepreviouslyset parameters without having to go to where the appliance is in stalled The panel is provided with self diagnosis to display any boiler functioninganomalies The climate chrono...

Page 18: ...operation The boiler must be installed with an original Immergas GreenRange inspectionableairintakesystemandvis ible flue gas extraction system made of plastic with the exception of the C6 configurati...

Page 19: ...rminaland orextensionconcentricpipe needs shortening consider that the internal duct must always protrude by 5 mm with respect to the external duct For safety purposes do not obstruct the boiler intak...

Page 20: ...Equivalent length inmofconcentric pipe 80 125 Concentricpipe80 125 m1 2 1 1 90 concentricbend80 125 3 0 1 4 Concentricbend45 80 125 2 1 1 Terminal complete with concentric horizontal intake exhaust 8...

Page 21: ...Intakem 16 3 m 2 5 Intakem 18 7 Exhaustm 4 9 m 7 7 Exhaustm 16 3 Exhaustm 13 6 Concentricvertical intake exhaust ter minal 60 100 Intakem 9 m 1 4 Intakem 10 3 Exhaustm 2 7 m 4 3 Exhaustm 9 Exhaustm 7...

Page 22: ...ng care to insert the gasket supplied with the kit and tighten by meansofthescrewsprovided Install the upper cover fixing it using the 4 screws present in the kit positioningtherelevantgaskets Engage...

Page 23: ...hecoverkitincludes Fig 15 No 1 Thermoformedcover No 1 Gasketclampingplate No 1 Gasket No 1 Gaskettighteningclip No 1 Intakeholecoveringplate Theterminalkitincludes Fig 15 No 1 Gasket No 1 Exhaustflang...

Page 24: ...16 1 Install the discharge flange on the central hole of the boiler positioning the relative gasket with the circular projections downwardsincontactwiththeboilerflange andtightenusing thehexscrewswit...

Page 25: ...kit 60 100 Fig 18 1 Installthebendwithflange 2 onthecentralholeoftheboiler positioning gasket 1 with the circular projections down wards in contact with the boiler flange and tighten using the screwsp...

Page 26: ...heboiler Ifadditionalcomponentsareassembled thelengthequivalentto themaximumallowedmustbesubtracted Inthiscasethespecialextensionsmustberequested C13 21 1 17 CONCENTRICVERTICALKIT INSTALLATION TypeCco...

Page 27: ...entricflange 2 onthecentralholeoftheboil er positioning gasket 1 with the circular projections down wardsincontactwiththeboilerflange 2 Tightentheconcentricflangewiththescrewsinthekit 3 Replace the ti...

Page 28: ...dandflatpointscrewsprovid edinthekit 3 Replacetheflatflangepresentinthelateralholewithrespectto the central one according to needs with the flange 3 posi tioningthegasket 2 alreadypresentintheboiler 4...

Page 29: ...e C9 adapter kit Fig 30 Version 125 only before assembly check the gaskets areintherightposition Intheeventcomponentlubrication alreadycarriedout bythemanufacturer isnotsufficient removetheresid ual l...

Page 30: ...rcircularsectionshaftsand20 mmintheeventof asquaresectionshaft Fig 29 Maximum 2 changes of direction are allowed on the vertical sec tion of the flue system with a maximum clearance angle of 30 withre...

Page 31: ...and operation over time of the ducting system makesure it is used in average atmospheric and environmental condi tions accordingtocurrentregulations absenceofcombustion products dustsorgasesthatcanalt...

Page 32: ...requirements of the standards suchasUNI13384 byprofessionallyqualifiedtechnicalstaff Chimney or flue sections for connection of the flue exhaust pipe mustcomplywithrequisitesoftechnicalstandardsinforc...

Page 33: ...alstoreducewater fillingconductiv ityupto10microsiemens cm Givenitslowconductivity desal inated water does not only prevent the formation of lime scale butalsoservesasprotectionagainstcorrosion Insert...

Page 34: ...tings thetypeofgasappearsonthedisplayonfirstconnection to the power supply or by checking the relative parameter G 3 checkthatthereisnoairinthegaspipe 4 check connection to a 230V 50Hz power mains co...

Page 35: ...rop belowthespeedminimumvalue Indomestichotwatermode thecirculatorpumpalways runsatfullspeed Pumprelease Ifafteralongperiodofinactivity thecirculatorisblocked adjust thescrewinthecentreoftheheadinorde...

Page 36: ...nalisconnected The LED lights up steady green when the pump is pow ered and the signal cable disconnected In these condi tionsthepumpworksatmaximumandwithoutcontrol Alarmwarnings Ifthepumpdetectsanala...

Page 37: ...ad kPa v6 v9 v9 A B C D Circulator pump absorbed power W Flowrate l h 36 Key Fig 35 A B Headavailablewithby passclosed B Headavailablewithby passopen C D Powerabsorbedbythepumpwithby passclosed dotted...

Page 38: ...eandpreservesthe originalheatexchangeanddomestichotwaterproductioncon ditions The boiler is prepared for application of the polyphos phatedispenserkit This is a type of chemical conditioning treatment...

Page 39: ...Gasvalve 6 Condensatedraintrap 7 D H W flowswitch 8 Manualairventvalve 9 Flowprobe 10 Air gasmixer 11 Systemexpansionvessel 12 Burner 13 Samplepoints airA fluegasesF 14 Flueprobe 15 Airintakepipe 16 I...

Page 40: ...s Never clean the appliance or connected partswitheasilyflammablesubstances Never leave containers or flammable substances in the same environment as theappliance Donotopenortamperwiththeappliance Don...

Page 41: ...telephones or intercom de vicesinthebuilding call an authorised company e g Au thorisedTechnicalAssistanceCentre ifyousmellburningorseesmokecoming outoftheappliance switchitoff discon nectpower close...

Page 42: ...ducethedomestichotwatertemperature 2 Buttontoincreasethedomestichotwatertemperature 3 ResetButton 4 Summer WinterButton 5 Keytoincreasethesystemwatertemperature 6 Keytoreducethesystemwatertemperature...

Page 43: ...the CARV2 is connected the symbol will appear on the dis play The boiler regulation parameters can be set via the CARV2 control panel and the button remains active on the boiler controlpanel alongwith...

Page 44: ...sto producedomestichotwaterbutnot withoptimalperformanceandwith possiblescaldingrisk 1 08 MaximumN ofresets Numberofallowedresetsalreadyperformed Theanomalycanbereset5consecu tivetimes afterwhichthefu...

Page 45: ...ly and the burner flame switches off unexpectedly a new attempt at ignition is performed and if normal conditions are re stored theboilerdoesnothavetobereset Ifnormalconditionsarerestoredthe boilerres...

Page 46: ...ioncontrol fault Highcurrentonthegasvalveisdetected Theboilerdoesnotstart 1 79 Combustioncontrol fault Reducedcurrentonthegasvalveisdetected Theboilerdoesnotstart 1 80 Block gasvalve driverissue This...

Page 47: ...thouthavingtobe reset 1 2 95 Combustionsignal discontinuous Thesystemdetectsadiscontinuouscombustionsignal Theboilerkeepsworking 1 2 96 Cloggedflue This occurs in the event an obstruction is detected...

Page 48: ...ng d0 7 Notused d0 8 Displaysthesystemreturnwatertemperature d0 9 Displaysthelistofthelastfiveanomalies Pressthe buttontodisplaytheanomalies Thenpressthe keystoscrollthelistofanomalies d1 0 Anomaly li...

Page 49: ...makesureitisrecoveredanddisposedofinaccord ancewithstandardEN1717 2 10 EMPTYINGTHED H W CIRCUIT Todothis alwaysclosethedomesticcoldwaterinletupstreamof theappliance Open any domestic hot water tap to...

Page 50: ...rts whenreplacingcomponents If additional documentation needs to be consulted for extraordinarymaintenance contacttheAuthorisedAf ter SalesService 3 2 INITIALCHECK Tocommissiontheboiler ensure that th...

Page 51: ...gauge the expansion vessel pressureisat1 0bar systemregulationprobesintervention Domestichotwatercontrolthermostatintervention Checksealingefficiencyofgascircuitandtheinternalsystem Check the interve...

Page 52: ...52 Installer User Maintenance technician Technical Data...

Page 53: ...an 11 Ignition detectionelectrode 12 Flueprobe 13 Fluesamplepoint 14 Airsamplepoint 15 Fluehood 16 Burner 17 Air gasmanifold 18 Returnprobe 19 Systemexpansionvessel 20 Airventvalve 21 Boilercirculatin...

Page 54: ...statjumper Y1 Gasvalve Colourcodekey Fig 40 BK Black BL Blue BR Brown G Green GY Grey OR Orange P Viola PK Pink R Red W White Y Yellow Y G Yellow Green ComandoAmicoRemotoV2 theboilerispreparedfortheap...

Page 55: ...ularcombustionor noisiness Dirty burner clogged primary heat ex changer incorrect combustion parame ters intake exhaustterminalnotcorrectly installed Checktheindicatedcomponents Non optimalignitionof...

Page 56: ...beensuccessful youmustmakesurethat thereisnoflameinthecombustionchamber theburnerflameisnottoohighorlowandthatitisstable does notdetachfromburner The pressure testers used for calibration should be pe...

Page 57: ...lasts5minutesatthemost afterwhichitswitchesau tomatically to the next parameter until the calibration process is complete Onceactivated tocancelthecompletecalibrationfunc tion pressthebutton for2secon...

Page 58: ...onself check Once calibration operations are complete the boiler runs a self checkforaboutoneminute Duringthischeck theboilercanrun at different powers and it is not possible to apply modifications to...

Page 59: ...vely the energy can be released from the DHW circuit by open inganyhotwatertap In this case the only active temperature control is the flow probe that limits the maximum temperature exiting the boiler...

Page 60: ...ultaneously until function activation which is displayed by indicating the fan operation speed in hundreds of revs and ignition of the flashing and symbols The appliance remains in this mode for a max...

Page 61: ...ontodisplay thevalueoftheselectedparam eter 59 Its value can be adjusted by using the central heating tem perature adjustment buttons 60 Press the mode of operation button for more than 1 second to st...

Page 62: ...nottocompromisethe properoperationoftheboiler 750 1700 rpm 1300 nG LG S1 Maxoutput S0 6900rpm 6200 nG LG S2 Ignitionoutput 2000 4500 rpm 3200 nG LG Intheeventofanalteration anomaly E62 appearsandcompl...

Page 63: ...s anactiverequest Timingsetsatimeperiodinwhichthe boilerwaitsbeforechangingtheoperatingmode inorderto quicklyandcomfortablysatisfyanadditionalrequestfor domestichotwater 0 100 seconds step 10sec 2 t5...

Page 64: ...ypeofhydraulicsintheboiler 0 0 A1 Notusedonthisboilermodel A2 Circulating pumpmodel Definesthetypeofcirculatorintheboiler 0 1 0 A3 Maximum pumpspeed Setsthemaximumpumpoperatingspeed 1 9 9 A4 Minimum p...

Page 65: ...me to stabilise it selfbeforecarryingoutacombustionparameterscheck It is thus necessary to wait for the boiler to carry out a self diagnosis test which is signalled by the flash ingsymbol Oncethesymbo...

Page 66: ...he and buttons for more than5seconds The function lasts in total 7 days 3 days at the lower temperature setand4daysatthehighertemperatureset Fig 61 After activating the function the lower set range 20...

Page 67: ...owergrid Fig 62 Loosenthetwosidescrews a Loosenthetwoscrewsunderthefrontpanel b Removethegrid c Casingandcontrolpanel Fig 63 64 Removethecoveringcaps d Thenunscrewthetwofixingscrewsonthecontrolpanel e...

Page 68: ...m h kg h 25 0 21500 D H W 99 2 72 99 2 00 24 0 20640 95 2 61 95 1 92 23 0 19780 91 2 50 91 1 84 22 0 18920 87 2 40 87 1 76 20 2 17372 HEAT D H W 79 2 20 79 1 62 20 0 17200 78 2 18 78 1 60 19 0 16340 7...

Page 69: ...nominalQ 9 2 0 2 10 2 0 2 CO 2toignitionQ 9 0 2 10 0 2 CO 2tominimumQ 9 0 2 10 0 2 COwith0 O2 atNom Min Q ppm 230 9 240 69 NOx with0 O2 atNom Min Q mg kWh 37 26 43 39 Fluetemperatureatnominaloutput C...

Page 70: ...25 21500 Domestichotwateradjustabletemperature C 20 60 Domestichotwatercircuitmin pressure dynamic bar MPa 0 3 0 03 Domestichotwatercircuitmax operatingpressure bar MPa 10 0 1 00 Flowratecapacityincon...

Page 71: ...NG Md Model Cod Md Modelcode SrN SerialNumber CHK Check Cod PIN PINcode Type Typeofinstallation ref CENTR1749 Qnwmin MinimumDHWheatinput Qnmin Centralheatingminimumheatinput Qnwmax DHWmaximumheatinput...

Page 72: ...30 of nominal heat output in a low tem peraturemode P1 6 6 kW At 30 of nominal heat output in a low tem peraturemode 1 95 8 Auxiliaryelectricityconsumption Otheritems Atfullload elmax 0 018 kW Heatlo...

Page 73: ...this booklet fortheinstaller andcurrentinstallationregulations For proper maintenance refer to chapter 3 of this booklet for the maintenancetechnician andadheretothefrequenciesandmeth odssetoutherein...

Page 74: ...tion e g boiler solarthermalsystem Facsimileforfillinginthepackageficheforroomcentralheatingsystems Boiler and supplementary heat pump installed with low temperature heat emitters at 35 C FFrom the bo...

Page 75: ...tion and supplementary heat pump Select the lowest value Boiler and supplementary heat pump installed with low temperature heat emitters at 35 C From the board of the heat pump in the distribution sys...

Page 76: ...r contribution From the board of the solar device I 1 1 x I 10 x II III I Auxiliary electricity G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85...

Page 77: ...productionsystempackagefiche average climate conditions Colder 0 2 x Hotter 0 4 x Solar contribution From the board of the solar device _____ 1 1 x _____ 10 x _____ ____ ______ Auxiliary electricity G...

Page 78: ...78...

Page 79: ...79...

Page 80: ...letismadeof ecologicalpaper immergas com ImmergasEuropeS r o 059051Poprad Matejovce SK Tel 421 524314311 Fax 421 524314316 UNIENISO9001 2015 CERTIFIED QUALITYSYSTEM Design manufactureandafter sales as...

Reviews: