background image

27

- Lift the door by gripping the metal-sheet plate with your right hand, 

also using the front round handle and with your left hand grip the 

internal handle (1a).

- Engage the tab (1c) into the provided slot (1e);
- Once the tab is inserted, lock everything in position by tightening 

the 3 screws (3).

N.B.:

 the vertical position of the door can be adjusted using the slots 

(1d).

N.B.:

 if the front door (1) is not aligned with the frame, a further 

adjustment can be made by loosening the screws (1f) and moving the 

profile (1g) vertically using the provided slots. Once adjusted, tighten 

the screws (1f).

Fig. 10

•  Make the hydraulic connection between the storage tank unit, 

appliance and hydraulic unit by referring to the instruction booklet 

of the installed product.

•  Connect the appliance to the flue, while referring to the relevant 

instruction booklet of the installed product.

N.B.:

 with the Domus Container it is possible to use all the 

condensation 

boiler

 flue kits provided for the Solar Container with upper, front, 

rear, right hand side and left hand side outlet. For the latter solution 

(storage tank unit side) it will always be necessary to use a flanged 

stub pipe to allow the pipes to pass over the storage tank unit itself.

N.B.:

 the following image is only an example of the various installation 

options possible.

1a

1g

1f

1

1c

1e

1f

3

3

3

1d

Summary of Contents for 3.022167

Page 1: ...COD 3 022167 KIT DOMUS CONTAINER KIT DOMUS CONTAINER IT Istruzioni e avvertenze Instruction and warning book IE...

Page 2: ...n ambienti asciutti ed al riparo dalle intemperie Il presente foglio istruzioni contiene informazioni tecniche relative all installazione del kit Immergas Per quanto concerne le altre tematiche correl...

Page 3: ...allacciamento sono riferite all adesivo posto all interno del Domus Container Zona 1 Zona 2 Gaudium Solar Base V2 Gaudium Solar Plus Base V2 Zona alta temperatura zona diretta non usata Trio V2 Zona...

Page 4: ...necessario smontare il portello anteriore 1 e la mantellatura fissa 2 svitando le opportune viti 3 Sganciare la mantellatura fissa 2 dalle viti a battuta presenti sul telaio spingendo verso l alto e...

Page 5: ...lmente i prodotti all interno del Domus Con tainer consigliata la rimozione temporanea della lamiera frontale dell apparecchio 9 della lamiera frontale dell unit bollitore 10 e del tubolare anteriore...

Page 6: ...gio apparecchio Victrix EXA avvitare la staffa B presente nel gruppo accessori all apposita traversa superiore predisposta sul Domus Container Fig 5a Fig 5b appendere l apparecchio D alla staffa B pre...

Page 7: ...ictrix Hybrid avvitare la staffa E presente nel gruppo accessori all apposita traversa superiore predisposta sul Domus Container Fig 6a Fig 6a appendere l apparecchio I alla staffa E precedentemente i...

Page 8: ...2 avvitarelastaffa E presentenelgruppoaccessori all apposita traversa superiore predisposta sul Domus Container Fig 6a Fig 6c appendere l apparecchio I alla staffa E precedentemente instal lata Fig 6b...

Page 9: ...avvitare la staffa E presente nel gruppo accessori all apposita traversa superiore predisposta sul Domus Container Fig 6e Fig 6e appendere l apparecchio I alla staffa E precedentemente instal lata Fig...

Page 10: ...al pacchetto Trio V2 Trio Mono V2 Avvitare le staffe F e G al Domus Container come indicato in Fig 6g Montare il quadro elettrico H sulla staffa G come indicato in Fig 6h A montaggio ultimato fissare...

Page 11: ...ffettuare solo in abbinamento al pacchetto Trio Base V2 Trio Base Mono V2 Montare le staffe P al Domus Container e fissarle con le viti Q Avvitare la lamiera R alle staffe P con le apposite viti S Fig...

Page 12: ...ssicurare il posizionamento del gruppo idraulico avvitando le viti L sulla staffa centrale N B nel caso l installatore lo ritenga necessario possibile bloccare ulteriormente il posizionamento del grup...

Page 13: ...ner con la flangia posizionata sul lato destro ed in basso Al termine rimontare la lamiera frontale 9 il tubolare anteriore 11 e la lamiera 10 smontati in precedenza Fig 9 Rimontare la mantellatura fi...

Page 14: ...uttando le asole predisposte Al termine della regolazione serrare le viti 1f Fig 10 Eseguire il collegamento idraulico tra unit bollitore apparecchio e gruppo idraulico facendo riferimento al relativo...

Page 15: ...mergas products are protected with suitable transport packaging The material must be stored in a dry place protected from the weather This instruction manual provides technical information for install...

Page 16: ...templates refer to the sticker placed inside the Domus Container Zone 1 Zone 2 Gaudium Solar Base V2 Gaudium Solar Plus Base V2 High temperature zone direct zone not used Trio V2 Low temperature zone...

Page 17: ...1 andthefixedcasing 2 bylooseningtheappropriatescrews 3 Release the fixed casing 2 from the stop screws on the frame by pushing upwards and at the same time pulling it towards you N B to remove the fr...

Page 18: ...y install the products inside the Domus Container it is recommended to temporarily remove the appliance front metal sheet plate 9 the storage tank unit front metal sheet plate 10 and the front pipe 11...

Page 19: ...tion Victrix EXA tighten the bracket B in the accessory unit to the appropriate upper cross member on the Domus Container Fig 5a Fig 5b hang the appliance D on the previously installed bracket B Fig 5...

Page 20: ...brid tighten the bracket E in the accessory unit to the appropriate upper cross member on the Domus Container Fig 6a Fig 6a hang the appliance I on the previously installed bracket E Fig 6b E Fig 6b I...

Page 21: ...sory unit to the appropriate upper cross member on the Domus Container Fig 6a Fig 6c hang the appliance I on the previously installed bracket E Fig 6b Fig 6d E I E MANDATADA PANNELLOMP FLOW FROM MPPAN...

Page 22: ...ory unit to the appropriate upper cross member on the Domus Container Fig 6e Fig 6e hang the appliance I on the previously installed bracket E Fig 6f Fig 6f E I E MANDATADA PANNELLOMP FLOW FROM MPPANE...

Page 23: ...Trio Mono V2 pack Tighten the brackets F and G to the Domus Container as shown in Fig 6g Fit the electrical panel H on the bracket G as shown in Fig 6h Once completed the installation fix everything...

Page 24: ...in conjunction with the Trio Base V2 Trio Base Mono V2 pack Mount the brackets P on the Domus Container and secure them with the screws Q Tighten the metal sheet plate R to the brackets P with the sp...

Page 25: ...osition of the hydraulic unit by fastening the screws L on the central bracket N B in the event that the installer thinks it is necessary it is possible to secure the position of the hydraulic unit ev...

Page 26: ...right hand side and at the bottom On completion reassemble the previously disassembled front metal sheet plate 9 the front pipe 11 and the metal sheet plate 10 Fig 9 Reassemble the left hand side fixe...

Page 27: ...ighten the screws 1f Fig 10 Make the hydraulic connection between the storage tank unit appliance and hydraulic unit by referring to the instruction booklet of the installed product Connect the applia...

Page 28: ...ducts that are correctly installed and used with respect to the Standards in force N B correct periodic maintenance is highly recommended Immergas TOOLBOX L App studiata da Immergas per i professionis...

Reviews: