____________________________________________________________________________________
STI S.r.l.
– Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com
Manual 2071, rev.07 02/2019
– BV
5
5
INSTALLATION
Important
Not performing the following procedures will invalidate the product guarantee.
5.1 Transport
Important
The lifting and handling should be made by qualified staff and in compliance with
the laws and provisions in force.
5.2 Reception
- Check that the model corresponds with that of order confirmation.
- Check that the BV was not damaged during transportation: if necessary renovate the painting according
to the specification reported on the order confirmation.
5.3 Storage
Big Volume Boosters leave the factory in perfect condition. Performances of each unit are guaranteed by
tests and data reported on a specific Test Report. In order to maintain these characteristics until the BV is
installed on site, proper attention must be observed for preservation during the storage period.
If the BV needs storage, before installation follow these steps:
-
place it on a wood surface pallet or on metallic support, so that they are not in direct contact with the
ground
,
or packed with appropriate covering;
-
make sure that plastic plugs are present on the pneumatic connections (if present).
If the storage is long-term or outdoor:
-
keep the BV protected from direct weather conditions;
-
replace plastic plugs of pneumatic connections (if any) with metal plugs that guarantee perfect tightness.
5.4 Requirements of Stability
Concerning the requirement of stability during installation and disassembling it
‘s possible to refer to the next
chapters 5.6 and 5.7.
5.5 Documents and dimensional drawings
Pneumatic diagrams, wiring diagrams and dimensional drawings are furnished with document accompanying
the actuator.