Parameters which should pay attention
a)
Pressure of CO
2
runoff is the show value at production state, the maximum of
carbonization runoff is 2.4m
3
h.
b)
The maximum of productivity is 35T/h.
c)
When using the machine for the first time or produce new beverage .ratio between syrup
and water and mixing pressure between gas and liquid should be examined, sampled to
make a decision and ensure product quality.
d)
All the data in the instruction are direct to general condition, the detail data should be
determined according with beverage kink and filling condition and temperature.
e)
When pressure gauge on the storage pot shows 0.6Mpa, safe valve should be open right
now to discharge gas. Or else, turn off the machine and do a examination.
Production finished
:
Before finishing production, turn “syrup pump work” button to “0”position, stop feed into
syrup, watch window opening in front of syrup pot. When liquid level reach lowest position,
press down the total stop button as well as total product inlet ball valve in the storage pot.
after all product are sent into filling machine, close CO
2
gas bottle, close CO
2
gas inlet valve
and turn power off. Thus, production is finished.
Cleaning after production finished:
Cleaning should be done after each production is finished. Detail operation see operation
program and try machine, sterilization and cleaning instruction. After finish cleaning the
machine, you can clean filling machine also. After cleaning, close gas bottle, close CO
2
gas inlet
valve and turn power off. Thus, machine work is over.