Parameters   which   should   pay   attention                                                                                                         

a)

 

Pressure    of    CO

2

    runoff    is    the    show    value    at    production    state,    the    maximum    of   

carbonization   runoff   is   2.4m

3

h.   

b)

 

The   maximum   of   productivity   is   35T/h.   

c)

 

When   using   the   machine   for   the   first   time   or   produce   new   beverage   .ratio   between   syrup   

and   water   and   mixing   pressure   between   gas   and   liquid   should   be   examined,   sampled   to   

make   a   decision   and   ensure   product   quality.   

d)

 

All   the   data   in   the   instruction   are   direct   to   general   condition,   the   detail   data   should   be   

determined   according   with   beverage   kink   and   filling   condition   and   temperature.   

e)

 

When   pressure   gauge   on   the   storage   pot   shows   0.6Mpa,   safe   valve   should   be   open   right   

now   to   discharge   gas.   Or   else,   turn   off   the   machine   and   do   a   examination.   

   
Production   finished

:      

Before   finishing   production,   turn   “syrup   pump   work”   button   to   “0”position,   stop   feed   into   

syrup,   watch   window   opening   in   front   of   syrup   pot.   When   liquid   level   reach   lowest   position,   

press   down   the   total   stop   button   as   well   as   total   product   inlet   ball   valve   in   the   storage   pot.   

after   all   product   are   sent   into   filling   machine,   close   CO

2

   gas   bottle,   close   CO

2

   gas   inlet   valve   

and   turn   power   off.   Thus,   production   is   finished.   

   

Cleaning   after   production   finished:

      

Cleaning   should   be   done   after   each   production   is   finished.   Detail   operation   see   operation   

program   and   try   machine,   sterilization   and   cleaning   instruction.   After   finish   cleaning   the   

machine,   you   can   clean   filling   machine   also.   After   cleaning,   close   gas   bottle,   close   CO

2

   gas   inlet   

valve   and   turn   power   off.   Thus,   machine   work   is   over.   

   

Summary of Contents for IMCQHS Series

Page 1: ...1 IMCQHS Series of Drink Mixer INTERNATIONAL MACHINE CONCEPTS WELCOMES YOU TO YOUR NEW MACHINE Operation Manual Date 2015 Version 1 Serial Number...

Page 2: ...tallation 1 3 Electrical and Pneumatic connections 1 4 Chapter 2 Technical Parameters and Description 2 1 Chapter 3 Operation Instruction Main Construction 3 1 Production system instruction 3 2 Mechan...

Page 3: ...f food sanitation law 1 2 Un crating Instructions During un crating make sure that no physical damage to the outside of the crate has taken place Carefully break open the exterior panels to reveal the...

Page 4: ...chine should be placed on level ground After installing the machine check if the machine is level by Level Instrument If not please adjust the four legs Check every part of the machine carefully for d...

Page 5: ...chilled water 0 4C0 Inlet pressure of chilled water 0 01Mpa 0 08Mpa Inlet temperature of syrup 2 8 C0 Inlet pressure of syrup 0 01Mpa 0 08Mpa Inlet pressure of CO2 0 7Mpa 0 8Mpa Purity of carbon dioxi...

Page 6: ...e static mixer The corrugated plate in the static mixer increases the meet area and time When the beverage after desecrated enter into the inlet of the static mixer put the CO2 gas of 0 6Mpa into stat...

Page 7: ...the syrup and water pipe to a large position See produce operation program to sterilize the order of sterilization is as below Syrup pot open or close related valves and discharge waste water Static m...

Page 8: ...of carbonization flow meter to 2 5 3 5m3 h c Adjust productivity namely adjust the metering valve shows on LZB 40 flow meter d Adjust the ratio between syrup and water according with different need o...

Page 9: ...now to discharge gas Or else turn off the machine and do a examination Production finished Before finishing production turn syrup pump work button to 0 position stop feed into syrup watch window openi...

Page 10: ...g time the steeper in all filter pot pipeline carbonization machine pump should be discharge completely Then close related valves as well as do a cleaning to the surface of the machine Water is prohib...

Reviews: