Selenio
TM
BNP User Guide, Release 3.7.1
152
- Grooming - Mapping
To schedule grooming at a specific time for a one-time occurrence, perform steps 1 through 4 in the
last section,
above in order to open the
Configure Program Mapping
window. Then proceed as follows:
1.
From the
Configure Program Mapping
window,
un-check
Now or Start time
and click on the
pull-down menu to access the calendar/clock
screen.
2.
If you want to start grooming immediately, click
OK
. If you want to start at a later time, set the
time and date and then click
OK
.
3.
To set the stop time, un-check
Never or Stop
Time
. The grooming schedule of
appears. If you don’t want to stop grooming, click
OK
. To set a stop time, set the time and date for
grooming to stop and click
OK
.
4.
Click
OK
to apply the mapping to the program.
Program Redundancy
The BNP supports program level redundancy on all the output services. Program level standby is
configurable using the
BNP
Element Manager
, which allows you to designate any input service as a
“standby program” with the exception of the same service. This redundancy can be configured on
output streams associated with GigE port as well as ASI ports.
The health of the standby program will be checked before failover and the BNP will not perform the
switch if the standby is degraded. In automatic recovery mode, the BNP returns back to the primary
program from the standby program when the primary program recovers from the interruption.
A program in an input TS that has SSM redundancy configured cannot be used as a backup program
for program redundancy.