9
3. Mark the mounting hole locations.
4. Drill
³⁄₈
" (9.5 mm) holes for wall anchors and insert anchors
flush with the wall.
5. Install vent cover bracket to wall about
¹⁄₈
" (3 mm) away from
the ceiling with drywall anchors and the 6 x 70 mm screws
supplied.
Complete Preparation
1. Determine and make all necessary cuts in the wall for the vent
system. Install the vent system before installing the hood. See
“Venting Requirements” section.
2. Determine the required height for the ½" conduit and drill a
1¼" (3.2 cm) hole at this location.
3. Run wire through the home power supply cable according to
the National Electrical Code or CSA Standards and local
codes and ordinances. There must be enough ½" conduit
and wires from the fused disconnect (or circuit breaker) box
to make the connection in the hood’s electrical terminal box.
4. Use caulk to seal all openings.
NOTE: Do not reconnect power until installation is complete.
Install Range Hood
1. Using 2 or more people, hang range hood on 2 mounting
hooks through the rectangular cutouts on back of hood.
2. Level the hood with the leveling screws in mounting hooks or
rectangular cutouts, using a level across bottom of hood.
3. Secure hood with 4 screws and washers through remaining
4 holes in hood.
4. Install transition with 4 screws.
Connect Vent System
For Vented Installations Only
1. Fit vent system over transition piece.
2. Seal connection with clamps.
A. Vent cover bracket
B. Mounting hole locations
C. Centerline on wall
A. Vent cover bracket
B. Centerline on wall
A
B
C
A
B
A. Mounting hooks
B. Mounting screws and washers
C. Leveling screws
D. Centerline on wall
E. Transition
F. 3.5 x 9.5 mm screws
G. Terminal box
A. Vent systen
B. Transition piece
C
C
G
B
B
A
D
E
F
F
A
B
Summary of Contents for W10177447B
Page 14: ...14 WIRING DIAGRAM...