ENGLISH
8 BEFORE YOU OPERATE THE MONITOR
NOTE
2.9mm
44.9mm
Front of the Monitor
Screw holes for
mounting the chassis
You will need a screwdriver to mount the L-Bracket.
L-Brackets and screws are necessary to install an open frame monitor. For details
regarding open frame monitor temperature and humidity operating conditions, see the
User Manual on IIYAMA website. http://www.iiyama.com.
The position of the L-bracket can be either 2.9 mm or
44.9 mm from the front of the monitor depending on
which screw holes you choose for mounting it.
Summary of Contents for ProLite TF2234MC
Page 2: ...ENGLISH ...