OPERATION
IC50 ENG
3-18
Lifting the machine
WARNING
•
ALWAYS lift the machine on the level ground.
•
NEVER lift the machine loaded with any personnel.
•
Make sure the lifting cables and other lifting devices are strong enough to support the
machine.
•
Use guide or tag lines to prevent the machine from swinging or turning.
Weight on lifting the machine: 6330 kg
1. Prepare strong enough wire ropes, shackles, sling frame and sling jigs.
2. Fix the sling jigs at the positions of the crawler frame shown above and pass the wire
rope through them.
3. Install the wire rope to the sling frame with the shackle.
4. Install the wire rope to the crane hooks and lift upward so the crawler is a little bit above
the ground, then stop lifting.
5. If the balance is good continue slowing lifting the machine.
Sling jig
Shackle
Sling jig
Sling frame
Pipe
Approx.
760
Approx.
640
Summary of Contents for IC50
Page 1: ...OPERATION MANUAL IC50 SERIAL NUMBER CA003001 PUB 1 1008...
Page 2: ......
Page 6: ...IC50 ENG...
Page 10: ...IC50 ENG...
Page 26: ...SAFETY IC50 ENG 1 16 This page is intentionally left blank...
Page 28: ...IC50 ENG...
Page 38: ...CONTROLS IC50 ENG 2 10 This page is intentionally left blank...
Page 40: ...IC50 ENG...
Page 60: ...IC50 ENG...
Page 93: ...MAINTENANCE IC50 ENG 4 33 This page is intentionally left blank...
Page 94: ...MAINTENANCE IC50 ENG 4 34 Electrical wiring system diagram INSTRUMENT PANEL...
Page 100: ...MAINTENANCE IC50 ENG 4 40 This page is intentionally left blank...
Page 101: ...IC50 ENG SPECIFICATIONS...
Page 102: ...IC50 ENG...