!C@ OPER. TIME
HOLD: 10)s
!D@ BRAKE TIME
FOR HOLD: 30)m
!F@ FIRE UP
TIME: 60)m
!G@ CH PUMP ON
TEMP: 35)*
!H@ TW PUMP ON
TEMP: 30)*
!J@TW PUMP ON
NO )
!I@TW HYSTERESIS
TEMP: 3)*
!L@ BLOWER POWER
MAX: 100)%
!A@ OPER. TIME
HEAT: 10)s
!B@ BREAK TIME
HEAT: 30)s
!E@ BLOW TIME
MULTIPL: 2)
!K@TW HEATING
BOILER>TW C
+10)*
OPERATING SETTINGS
To enter the
OPERATING MENU
press
MENU
on
MAIN DISPLAY
and hold it 2 seconds.
A) Feeder operation time for
HEAT
- the boiler temperature
value.
below the setting
B) Feeder operation break time for
HEAT
C) Feeder and blower operation time for
HOLD
- boiler temperature above the
setting value. The blower operation time can be increased by the blowing
time multiplier (E)
D) Feeder and blower operation break time for
HOLD
E) Information how many times the blower operation time
is longer than feeder operation time at
HOLD
. It informs about the time
necessary for blowing the fire after boiler operation break.
F) Time since the controller operation
START
during which
the boiler is not OFF in spite of temperature decrease
below the value
of
BURNING OUT TEMPERATURE
.
G) CH pump start temperature
H) TW (tap water) feeding pump starting temperature
I) TW (tap water) container temperature decrease necessary to start the TW
pump.
J) TW (tap water) feeding pump priority towards CH (central heating) pump
K) Increasing the boiler temperature value while TW container is heating up if
this temperature is too low. The higher temperature setting the shorter
heating up time.
L) Blower maximum power.
The blower power upper limit.
IGNIS gamma v 2.15
TMK Września