8
5 Mounting
Before installing and removing the unit: make sure that no pressure is
applied to the system�
►
Screw the pressure connection or
adapter G⅛ to the main pressure
connection (1) and tighten�
Maximum tightening torque: 8 Nm�
Further possibilities: → the following sections.
5.1 Mounting accessories
The following components are available as accessories:
Order no�
Mounting set for DIN rail mounting (DIN rail TH 35-7�5 to EN 60715)
E37340
Adapter R⅛ to R⅛, can be aligned
E37350
T pipe mounting set, includes:
• T pipe with 3 connections G½
•
Reducer G½ to G⅛
•
Adapter R⅛ to R⅛
E37360
Thread extension 1/8“ for flange mounting
E30075
Push-in air fitting for tube Ø 6 mm
E30076
Push-in air fitting for tube Ø 8 mm
E30077
5.2 Pressure connections for differential pressure
measurement
►
Remove the label from the
ventilation connection M5 (2),
connect to the pressure system�
Maximum tightening torque:
2�5 Nm�
►
Connect the main pressure
connection G⅛ (1) to the pressure
system�
Maximum tightening torque: 8 Nm�