Binary level sensor for overflow prevention / leakage detection according to WHG
LI213x
9
5 Installation
5.1 Mechanical installation
The installation position is vertical, the required immersion depth until the response level is reached
must be taken into account during installation
Determining the installation depth, installation distances
Screw-in or flange adapters are available for installation. After attaching this mounting accessory, the
probe can be passed through the opening. Use the enclosed stainless steel tube clip to determine the
setting value (installation height). The tightening of the coupling nut allows the fixation of the response
level following the already completed installation.
Use seals resistant to media.
5.2 Determining the installation depth, installation distances
The installation depth must be selected so that the active zone (MET) is safely covered by the liquid to
be monitored and the medium is safely detected.
The immersion depth at which the device switches depends on the medium and the installation
situation and is a maximum of 28 mm. Use suitable mounting accessories and enclosed stainless
steel tube clip to set and mark the response level.