![IEMCA BOSS 552 - IC Manual For Use And Maintenance Download Page 67](http://html.mh-extra.com/html/iemca/boss-552-ic/boss-552-ic_manual-for-use-and-maintenance_620124067.webp)
EN
4 - HANDLING AND INSTALLATION
BOSS 552-IC
4 - Pag. 18 / 28
4.5.3 Preliminary
positioning
• Position the bar feeder behind the lathe, by
taking into account the fixed dimensions and
side plays of both machines and the coupling
distance (see "B" in the "PRELIMINARY
POSITIONING" section, Ch. 4)
• Roughly adjust the working axis height to obtain
alignment with the lathe by turning the feet
screws.
• Place four plates under the axial displacement
sliding frame in the positions shown in the
figure, and screw down the cone end grub
screws "A".
• Check frame levelling crosswise and lengthwise;
adjust if required by acting on screws "A".
• Roughly restore working axis height and
alignment with the lathe if required.
4.5.4 Sleeve - Installation
See the "SLEEVE - INSTALLATION" section, CH. 4.
Summary of Contents for BOSS 552 - IC
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 15: ...1 GENERAL INFORMATION BOSS 552 IC EN 1 Pag 5 5 ...
Page 43: ...EN 2 TECHNICAL INFORMATION BOSS 552 IC 2 Pag 28 28 ...
Page 49: ...EN 3 SAFETY GENERAL INFORMATION BOSS 552 IC 3 Pag 6 6 ...
Page 101: ...EN 5 ADJUSTMENTS AND SETUP BOSS 552 IC 5 Pag 24 24 ...
Page 129: ...EN 7 BAR FEEDER MAINTENANCE BOSS 552 IC 7 Pag 8 8 ...
Page 133: ...EN 8 TROUBLES CAUSES SOLUTIONS BOSS 552 IC 8 Pag 4 4 ...
Page 139: ...EN 9 PARTS REPLACEMENT BOSS 552 IC 9 Pag 6 6 ...
Page 155: ...EN 11 COLLETS BOSS 552 IC 11 Pag 2 34 ...