GRAND-AL Series
Page 24
3.6 Power-On Procedure
3.6.1 Installation Checklist
WARNING:
Make sure a power supply with the correct input voltage is being fed into
the system. Incorrect voltages applied to the system may cause damage to
the internal electronic components and may also cause injury to the user.
To power on the GRAND-AL, please make sure of the following:
The HDD/SSD is installed
The LAN cable is connected
The power cables are plugged in
The system is securely mounted
3.6.2 Power-on Procedure
To power-on the GRAND-AL please follow the steps below:
Step 1:
Connect the power source to the power input jack(s).
Figure 3-1: Power Connection
Summary of Contents for GRAND-AL Series
Page 2: ...GRAND AL Series Page ii Revision Date Version Changes April 19 2018 1 00 Initial release...
Page 9: ...GRAND AL Series Page 1 Chapter 1 1 Introduction...
Page 16: ...GRAND AL Series Page 8 Chapter 2 2 Unpacking...
Page 20: ...GRAND AL Series Page 12 Chapter 3 3 Installation...
Page 34: ...GRAND AL Series Page 26 Chapter 4 4 Maintenance...
Page 37: ...GRAND AL Series Page 29 Chapter 5 5 Interface Connectors...
Page 44: ...GRAND AL Series Page 36 Appendix A A Regulatory Compliance...
Page 49: ...GRAND AL Series Page 41 Appendix B B Safety Precautions...
Page 54: ...GRAND AL Series Page 46 Appendix C C Hazardous Materials Disclosure...