Mod: MDM/011/M4 Rev 2
IDS GeoRadar
User Guide
QGG/2020/002
Rev. 1.1
4.4
Control Unit installation and setup
1.
Install the horizontal bracket on the pole base tightening with metallic ties.
2.
Lift the CU by the handles and fix it to the designated brackets supports, tightening with metallic ties using 7
mm socket wrench, tangent and far from the pole as much as possible.
Apply. isolating or Dutch tape on the sharp- cutting edge of the metallic ties that fix
the CU and SU, after HW installation. Make sure of the proper fixing-fastening of
the SU and CU brackets
2
1