INSTALLATION OF THE UNIT
TANK FOR CHEMICAL PRODUCT
CONNECTION AND INSTALLATION
1
34
2
35
3
36
4
37
5
38
6
39
7
4041
9
42
10
43
11
44
12
45
13
46
14
47
15
48
16
49
17
50
18
51
19
52
20
53
21
54
22
55
23
56
24
57
25
58
26
59
27
60
28
61
29
62
30
63
31
64
32
65
33
66
1
34
2
35
3
36
4
37
5
38
6
39
7
40
8
41
9
42 43
11
44
12
45
13
46
14
47
15
48
16
49
17
50
18
51
19
52
20
53
21
54
22
55
23
56
24
57
25
58
26
59
27
60
28
61
29
62
30
63
31
64
32
65
33
66
IDROTECH
®
Ed. 01.97
IDROTECH
®
Ed. 01.97
Fig. 4
cm
5
0
Fig. 5
Fig. 6
Fig. 7
1)
Place the machine on the floor in an excellent position at 50 centimetres from the
wall in compliance with the standards in force (for example: in a dry place not
exposed to the inclemency of the weather and not reachable by unauthorized
people).
2)
Connect the air feeding pipe (A) to the air inlet fitting (B).
3)
Connect the product feeding pipe (C ) to the product suction fitting (D), then
introduce it in the tank (E) which contains the dilute product.
4)
Power supply (F); connect the unit to the main control panel (this operation must be
performed by a skilled electrician).
5)
Connect the air outlet (G), with a Rilsam pipe (or of the same type) with the
adequate diametre, to the stations Y (Fitting Y2 Fig.5).
6)
Connect the product outlet (H), with a Rilsam pipe (or of the same type) with the
FIXED NOZZLE (Y)
FITTING Y1
FITTING Y2
ROTATING NOZZLE
FOR ROTATING
STATION
CONNECTION
(SEE ENCLOSED A)
COMPRESSED AIR
AIR INLET
PIPE (A)
TAP
PRODUCT
INLET PIPE ( C)
TANK FOR
PRODUCT
PRODUCT
SUCTION
CONNECTION
(D)
AIR INLET
CONNECTION
(B)
AIR OUTLET
TAPS
(G)
PRODUCT
OUTLET
TAPS
(H)
NOZZLES
N°3 STATIONS
(Y)
POWER
SUPPLY
(F)
Summary of Contents for CNS AIR SYSTEM 3
Page 4: ......