2.8  DETERMINING THE FLUE LENGTH AND FLUE PACKS REQUIRED 

IMPORTANT. The boiler must be installed in a vertical position in accordance to the installation instructions.

FLUE KITS
Telescopic Flue‘B’ Pack

 - contains: Flue turret, telescopic flue incorporating a terminal, rubber wall seal and instructions

Horizontal Flue Terminal (600mm long) ‘B’ Pack

 - contains: Flue turret, non telescopic single piece flue incorporating a 

terminal, rubber wall seal and instructions. 

Horizontal Flue Terminal (1000mm long) ‘B’ Pack

 - Flue turret, telescopic flue incorporating a terminal, rubber wall seal and instructions.

Note. If ‘B’ packs are used on their own (either 1 piece or telescopic), then they can be fitted horizontally as the flue inside is 

designed to slope 1.5 degrees.

‘D’ Pack 

- contains: 1 metre length of flue pipe (Functional length 950mm), 1 support bracket and instructions.

When extension ‘D’ Packs are used the flue duct must incline 1.5 degrees away from the appliance, to allow the condensate to drain 

back to the boiler and out of the condensate drain.  It is recommended that a support bracket is fitted on every 1 metre of pipe work 

used and the bracket is located as close to the collar as possible.  The bracketing must ensure a 1.5 degree fall back to the appliance.

Optional Flue Finishing Kit

 - UIN 155988 & Concentric Flue Screw Retaining Kit (Optional Kit of mechanical fixing of flue joints)

Only use water as a lubricant during assembly.

The ‘B’ pack terminal is classed as part of the maximum flue length.
This flue system incorporates a removable flue outlet nose that utilises a push fit location system.  This enables the installation of 

deflector, high level or balcony flue kits without the removal of the whole ‘B’ pack terminal.  The appliance must not be operated 

without the desired outlet nose correctly fitted in place, ensuring the side location dimples are in line with the mounting face 

allowing the correct sealing of the components.

It is IMPORTANT that all attachments are fitted in accordance to the installation instructions provided with them.

The TURRET supplied in the ‘B’ Pack has an upper combustion sample point with a screw cap seal and a lower air sample point 

with an air stopper seal.  Ensure all caps & seals are in place.

Additional Termination Kits

 available for use with these ‘B’ packs.

Flue Deflector Kit

The resistance is the equivalent of 1 metre of flue pipe and therefore must be deducted from 

any maximum flue length

High Level Flue Outlet Kit

The maximum permissible concentric flue length when using a standard (500mm) kit is 4.5 metres

Balcony Flue Outlet Kit

The maximum permissible concentric flue length when using this kit is dependant on the length 

of the balcony flue outlet run which combined with the concentric run must not exceed the 

maximum flue length requirement of the appliance it is to be fitted to

Total Maximum Permissible Horizontal Concentric Flue Length

 combining both ‘B’ Packs and ‘D’ Packs

(Measured from centreline of the turret to the outside of the wall terminal)

15, 18 & 26 kW appliances

Total Maximum:   10 metres - minus any flue kit options or bends

32kW Appliances

Total Maximum:    8 metres  - minus any flue kit options or bends

Total Maximum permissible Vertical Flue Length 

combining both Roof Terminal and ‘D’ Packs

15, 18, 26 & 32kW Appliances

Total Maximum:    10 Metres  - minus any bends

90º Elbow Kit 60/100 - 

(Equivalent flue length resistance = 

1M

)

45º Elbow Kit 60/100

 - (Equivalent flue length resistance = 

0.6M

)

Minimum Horizontal Flue Lengths 

(Centre line of turret to outside of wall terminal)

Telescopic terminal = 350mm

One piece terminal = 285mm

Wall Thickness

   

 

     Std Metric Brick 102.5mm wide

‘B’ Pack Flue Type

Minimum permissible Wall Thickness

Maximum permissible Wall Thickness

Rear Flue

Rear Flue + Std-Off Side Flue

Rear Flue

Rear Flue + Std-Off Side Flue

Horizontal Flue Terminal 

(600mm long) B Pack

154

102.5

102.5

527

482

433

Telescopic Flue B Pack

265

220

171

478

433

384

Horizontal Flue Terminal 

(1000mm long) B Pack

577

532

483

704

749

700

Horizontal Flue Terminal 

(1000mm long) B Pack cut 75mm

502

457

498

719

674

625

For Flue lengths between 658 & 708 use a Horizontal Flue Terminal (1000mm long) B Pack, cut 75mm off the end of the 

terminal section of the telescopic flue only.

Summary of Contents for Vogue System Gen 2 S15

Page 1: ...Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy of literature for specification and maintenance practices visit our website www idealboilers com where you can download the relevant information in PDF format March 2017 UIN 216172 A04 VOGUE SYSTEM GEN2 S15 S18 S26 S32 INSTALLATION AND SERVICING ...

Page 2: ...r Space Heating Full Load P4 kW 15 18 26 32 Part Load P1 kW 4 9 5 9 8 5 10 5 Auxiliary Electricity Consumption Full Load elmax kW 0 025 0 040 0 045 0 049 Part Load elmin kW 0 005 0 004 0 011 0 012 Standby PSB kW 0 003 0 003 0 003 0 003 Seasonal Space Heating Energy Efficiency Full Load ƞ4 89 6 89 8 89 7 89 8 Part Load ƞ1 97 0 97 8 97 8 97 8 Standby Loss Pstby kW 0 020 0 020 0 020 0 020 Ignition Pi...

Page 3: ...Class VII Class VIII 1 2 1 5 2 3 4 3 5 5 PRODUCT FICHE The energy efficiency of the package of products provided for in this document may not correspond to its actual energy efficiency once installed in a building as the efficiency is influenced by further factors such as heat loss in the products in relation to the building size and its characteristics Collector Size in m2 Tank Volume in m3 Colle...

Page 4: ...4 Installation and Servicing ...

Page 5: ...s RESTART button on the control panel The boiler will repeat the ignition sequence if a heat demand is present NOTES FOR THE INSTALLER Page 2 ERP Data Table Update to figures Page 3 Product Fiche Update to Figures Page 8 Table 1 General Data CO2 information added Section 2 14 Assembling the Roof Flue Kit Update to min max degrees on fluing diagram Section 3 2 Boiler Front Panel Removal Replacement...

Page 6: ...6 Installation and Servicing ...

Page 7: ...ecks 44 2 30 Handing Over 44 3 SERVICING 45 3 1 Servicing Schedule 45 3 2 Boiler Front Panel Removal Replacement 46 3 3 Lowering Controls Panel Accessing Mains Wiring 46 3 4 Fan And Venturi Assembly Removal And Cleaning 47 3 5 Removal Of Injector 47 3 6 Burner Removal And Cleaning 48 3 7 Cleaning The Condensate Trap Siphon 48 3 8 Cleaning The Heat Exchanger 49 3 9 Re Assembly 49 3 10 Replacement O...

Page 8: ... Btu h by the gross C V of the gas Btu ft3 c For m3 h multiply l s by 3 6 Key to symbols GB United Kingdom IE Ireland Countries of destination PMS Maximum operating pressure of water C13 C33 C53 A room sealed appliance designed for connection via ducts to a horizontal or vertical terminal which admits fresh air to the burner and discharges the products of combustion to the outside through orifices...

Page 9: ...emp measure record Hot water outlet temp measure record Water flow rate at max setting measure record For condensing boilers only Condensate drain 24 25 For all boilers complete sign hand over to customer For GB to comply with Building Regulations Part L1 Part 6 in Scotland the boiler should be fitted in accordance with the manufacturer s instructions Self certification that the boiler has been in...

Page 10: ...required 1 4 OPTIONAL EXTRA KITS Please visit www idealboilers com to access the Flue and Accessories Guide for this boiler 1 5 SAFETY Current Gas Safety installation and use regulations or rules in force The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force In GB the installation must be carried out by a Gas Safe Registered Engi...

Page 11: ... plate 1 8 GAS SUPPLY The local gas supplier should be consulted at the installation planning stage in order to establish the availability of an adequate supply of gas An existing service pipe must NOT be used without prior consultation with the local gas supplier The boiler MUST be installed on a gas supply with a governed meter only A gas meter can only be connected by the local gas supplier or ...

Page 12: ...emperature in a space served by radiators not fitted with such a valve When thermostatic radiator valves are used the space heating temperature control over a living dining area or hallway having a heating requirement of at least 10 of the minimum boiler heat output should be achieved using a room thermostat whilst other rooms are individually controlled by thermostatic radiator valves However if ...

Page 13: ...ing where wall thicknesses do not exceed 600mm Where the space Front clearance The minimum front clearance when built in to a cupboard is 5mm from the cupboard door but 450mm overall clearance is still required with the cupboard door open to allow for servicing Bottom clearance Bottom clearance after installation can be reduced to 5mm This must be obtained with an easily removable panel to enable ...

Page 14: ...is is the maximum system volume for the boiler expansion vessel If the capacity of the vessel is not considered sufficient for this or for any other reason an additional vessel MUST be installed on the return to the boiler Guidance on vessel sizing is given in table opposite 5 Filling The system may be filled by the following method Through a temporary hose connection from a draw off tap supplied ...

Page 15: ...Treatment in accordance with the Benchmark Guidance Notes on Water Treatment in Central Heating Systems If water treatment is used Ideal Boilers recommend only the use of SCALEMASTER GOLD 100 FERNOX MBI ADEY MC1 or SENTINEL X100 inhibitors and associated water treatment products which must be used in accordance with the manufacturers instructions Notes 1 It is most important that the correct conce...

Page 16: ...204 Gas Valve 205 Injector Gas 207 Venturi 208 Fan 209 Gasket Fan Venturi 210 Fan Adaptor 211 Venturi Deflector 212 Condensate Hose 213 Flue Turret Clamp 214 Siphon trap 217 Gas Cock 218 Flue Manifold 219 Flue Manifold Seal 220 Fan Adaptor Seal 302 Primay PCB 303 CUI Board 304 Thermistor Flow Return 306 Electrode Ignition 307 Electrode Detection 308 Ignitor Unit 317 Control Box Front 318 Control B...

Page 17: ...Wall Mounting Template located on internal protective packaging F Turret Clamp G Pressure Relief Valve Drain Pipe H Boiler Guarantee Registration Pack C A D F G B E H Boiler Guarantee Gas Valve Pack HARDWARE PACK CONTENTS Gas Valve Pack 1 Pipe Gas Inlet 2 Washer Gas blue 3 Gas Cock Return Valve Pack 1 Pipe CH Return 2 Washer CH 3 Valve Return Accessory Pack 1 Screw x2 2 Wallplug x2 3 Turret Clamp ...

Page 18: ...Loosen the 2 screws retaining the front panel at the underside of the boiler 2 Release catches at rear of door by pulling downwards 3 Pull the underside front panel forward then lift upwards to remove 1 2 Note This flue system incorporates a removable flue outlet nose that utilises a push fit location system This enables the installation of deflector high level or balcony outlet flue kits without ...

Page 19: ...ly with a 5 core boring tool ensuring that the hole is square to the wall Both wall faces immediately around the cut hole should be flat 2 Drill 2 mounting holes marked from template with a 7 5mm 8mm masonry drill and insert the plastic plugs provided for the wall mounting plate 3 Locate 2 No 14 x 50mm screws in the wall mounting plate one at each side in any of the 3 holes provided at each side a...

Page 20: ...itted in accordance to the installation instructions provided with them The TURRET supplied in the B Pack has an upper combustion sample point with a screw cap seal and a lower air sample point with an air stopper seal Ensure all caps seals are in place Additional Termination Kits available for use with these B packs Flue Deflector Kit The resistance is the equivalent of 1 metre of flue pipe and t...

Page 21: ...scopic Horizontal Flue Terminal 1000mm long B Pack Telescopic Cut 75mm Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum B Pack Standard 233 602 340 553 652 869 577 794 Plus 1 1m D pack 1183 1552 1290 1503 1602 1819 1527 1744 Plus 2 1m D pack 2133 2502 2240 2453 2552 2769 2477 2694 Plus 3 1m D pack 3083 3452 3190 3403 3502 3719 3427 3644 Plus 4 1m D pack 4033 4402 4140 4353 4452 4669...

Page 22: ... OFF THE TERMINAL END OF THE 1000MM TELESCOPIC FLUE ALL OTHER LENGTHS OBTAINED USING D PACK EXTENSIONS IN FLUE LENGTH TABLE 1 COLUMN HORIZONTAL FLUE TERMINAL 1000MM LONG B PACK CUT 75MM TELESCOPIC SHOULD HAVE THE 75MM CUT OFF THE D PACK EXTENSION AND NOT TELESCOPIC FLUE SETTING TELESCOPIC FLUE B PACK 1 Measure the required flue length A 44mm 2 Measure from the outer terminal lip to end of outer fl...

Page 23: ... from its mounting and will need to be refitted 9 When 1st mark is in line with the wall whilst holding the flue firmly push the white wall sealing flange to the wall until the 2nd of the two marks is just visible If the last location mark is clearly passed the white inner wall seal then the outer wall seal will have been dislodged from its mounting and will need to be re fitted 10 Ensure the seam...

Page 24: ...as an internal soil and vent stack or internal kitchen or bathroom waste pipe etc fig 3 External Drain Connections The use of an externally run condensate drainage pipe should only be considered after exhausting all internal termination options as described previously An external system must terminate at a suitable foul water discharge point or purpose designed soak away If an external system is c...

Page 25: ...nimum connection height up to 3 storeys Soil vent stack 450 Boiler with 75mm sealed condensate trap Min Ø 19mm Internal pipe Min Ø 30mm Internal pipe Water weather proof insulation 75 Boilers without 75mm sealed condensate trap must be fitted with a 75mm trap and visible air break Visible air break at plug hole Min Ø 19mm Internal pipe Sink basin bath or shower with integral overflow and 75mm trap...

Page 26: ...ng a separately supplied vertical connector WEATHER PROOFING Where the flue passes through the roof line an adequate seal must be made This is achieved by using either Flat roof weather collar or Universal weather collar ACCESSORIES Flue Duct Extension Kits are available for flue lengths extending beyond 1m These packs contain 1m extension ducts and may be cut to the desired length If the offset v...

Page 27: ...penetrate the shaded area of the roof Note The equivalent flue length resistance of the elbow kits are 90o elbow kit 1m 45o elbow kit 0 6m If chimney penetrates dotted area such that A is less than 300mm B shall not be less than 300mm Where two or more vertical fanned draught chimney configurations terminate in close proximity at the same height they shall be separated by at least 300mm Where any ...

Page 28: ...ided with the vertical connector kit 3 Secure the vertical connector by applying downward pressure on the connector 4 Position the clamp on the top face of the flue manifold and push it horizontally backwards Locate both clamp lugs into the flue manifold and secure to the flue manifold with the M5 retaining screw 5 Push extension duct if required supplied separately into vertical connector 6 If th...

Page 29: ...8mm diameter at the point of pipe connection to the boiler tails use 22mm x 28mm pipe adaptors as appropriate GAS CONNECTION IMPORTANT The gas service cock is sealed with a non metallic blue fibre washer which must not be overheated when making capillary connections Refer to Section 1 16 for details of the position of the gas connection For additional gas supply info refer to Section 1 8 PRESSURE ...

Page 30: ...LER WIRING MAINS The Vogue boiler comes pre fitted with 1 8m of mains cable This must be connected to a permanent live supply and NOT switched by thermostats programmers If the supply cord is damaged it must be replaced by the manufacturer service agent or similarly qualified persons in order to avoid hazard Accessing the installer wiring 1 Isolate the mains supply from the boiler 2 Remove the fro...

Page 31: ...remove the 2 19 INTERNAL WIRING EXTERNAL CONTROLS OpenTherm link To add wired external Room Thermostats Timers or Programmers proceed as follows 1 Isolate the mains supply to the boiler 2 Remove the front panel refer to Section 3 2 3 Swing the control box down into the servicing position refer to Section 3 3 4 Route incoming cables through the grommets in the bottom panel note grommets are blind a...

Page 32: ...N L N HW ON HW OFF Y PLAN VALVE SYSTEM BOILER WITH Y PLAN SYSTEM br br o g y b b g y g g L N E L N E CH ON R S ON HW ON HW OFF C S ON FUSED SPUR TIMER CH ON L N HW ON HW S PLAN VALVE CH S PLAN VALVE R S C S o BOILER L N MAINS IN SL 1 SL 2 E IN L IN L SYSTEM BOILER WITH S PLAN SYSTEM Note If an outside sensor is connected then CH S Plan Valve Orange Wire SL1 IN HW S Plan Valve Orange Wire SL2 IN IN...

Page 33: ...n If parts of the pipework run outside the house or if the boiler will be left off for more than a day or so then a frost thermostat should be wired into the system The frost thermostat should be sited in a cold place but where it can sense heat from the system Note If the boiler is installed in a garage it may be necessary to fit a pipe thermostat preferably on the return pipework EXAMPLE Connect...

Page 34: ...BUS RX NC CHIP COM BUS GND CHIP COM BUS 5V CHIP COM BUS TX CHIP COM BUS RX CHIP COM BUS 24V CHIP COM BUS GND CHIP COM BUS 5V CHIP COM BUS RX MAINS LIVE MAINS NEUTRAL AUXILIARY LIVE IONISATION FLOW DHW DHW X7 2 WPS SIGNAL WPS GND FLUE FLUE RETURN RETURN 5 4 3 2 1 5 4 3 2 1 1 black grey red green blue brown green yellow orange pink violet yellow bk gy r g b br g y o p v y KEY 1 2 3 4 1 PE 1 2 N 2 3 ...

Page 35: ...ts refer to Gas Supply Section 1 8 Ensure that this inlet pressure can be obtained with all other gas appliances in the property working Gas Supply Gas Pressure Test Point ATTENTION IT IS A CONDITION OF THE MANUFACTURERS WARRANTY THAT THE BENCHMARK COMMISSIONING CHECKLIST IS FULLY COMPLETED AND LEFT WITH THE APPLIANCE A Electrical Installation 1 Checks to ensure electrical safety should be carried...

Page 36: ...nob E to the off position 7 Slacken the screw in the inlet pressure test point H and connect a gas pressure gauge via a flexible tube INITIAL IGNITION 1 Switch the electricity supply ON and check all internal and external controls are calling for heat 2 Move the On Off knob E into the on position Set the Boiler Temperature Control knob D to max The boiler will now go through its ignition sequence ...

Page 37: ...stablished the following screen will be displayed MENU 60O C TO CYLINDER ON 60 C ON 60 C 15 C The temperature shown will be the actual Flow temperature At full output check the gas rate at the gas meter with no other appliances in use Refer to Table 2 for gas rates Ensure that with the boiler operating the dynamic gas pressure is able to obtain maximum output Refer to Table 1 Set the timer to be o...

Page 38: ...OFF Cylinder Demand On CH Demand On MENU 60O C TO CYLINDER ON 60 C ON 60 C 15 C Cylinder Demand Off CH Demand On MENU ON 60 C 15 C READY TIMER OR CYLINDER THERMOSTAT OFF Boiler Frost Protection occurs if Flow Temperature less than 5 C MENU BOILER FROST PROTECTION ACTIVE SWITCH OFF TEMPERATURE 19O C Service Due shown after 12 months operation see page 39 to reset MENU READY TIMER OR ROOM THERMOSTAT...

Page 39: ...Y NAME MAX OFF MAX OFF SELECT EXIT on the next screen to show the following EXIT SELECT MENU SERVICE COMPANY PHONE NUMBER CHANGE SERVICE INTERVAL FAULT HISTORY SERVICE COMPANY NAME Press SELECT and a screen similar to the folloiwng will be displayed SERVICE COMPANY PHONE NUMBER TEL NO 0 1 4 8 2 4 9 8 6 6 0 1 SET NEXT Press MENU SHOW EFFICIENCY LEVEL HOT WATER PREHEAT ON OFF SERVICE COMPANY PHONE N...

Page 40: ...d EXIT SELECT MENU VENT SYSTEM SENSOR READINGS FAULT HELP FAULT HISTORY Press SELECT and the following screen will be displayed EXIT SELECT FAULT HELP IGNITION LOCKOUT NO WATER FLOW LOW WATER PRESSURE Press MENU SHOW EFFICIENCY LEVEL HOT WATER PREHEAT ON OFF SERVICE COMPANY PHONE NUMBER SERVICE COMPANY NAME MAX OFF MAX OFF SELECT EXIT and MENU SHOW EFFICIENCY LEVEL HOT WATER PREHEAT ON OFF SERVICE...

Page 41: ... SHOW EFFICIENCY LEVEL HOT WATER PREHEAT ON OFF SERVICE COMPANY PHONE NUMBER SERVICE COMPANY NAME MAX OFF MAX OFF SELECT EXIT until the following screen is displayed EXIT SELECT MENU MAXIMUM FLOW TEMPERATURE SERVICE MODE SENSOR READINGS PUMP FAN VALVES Press SELECT and a screen similar to the following will be displayed EXIT PUMP FAN VALVES PUMP OFF DIVERTER VALVE POSITION FAN TARGET GAS VALVE CH ...

Page 42: ...X OFF SELECT EXIT until the following screen is displayed EXIT SELECT MENU PUMP MODULATION PLOT GRAPHS SERVICE MODE MAXIMUM FLOW TEMPERATURE Press SELECT and the following screen will be displayed EXIT SELECT SERVICE MODE MAXIMUM CH RATE MINIMUM CH RATE Press MENU SHOW EFFICIENCY LEVEL HOT WATER PREHEAT ON OFF SERVICE COMPANY PHONE NUMBER SERVICE COMPANY NAME MAX OFF MAX OFF SELECT EXIT and the fo...

Page 43: ... until the desired setting is displayed Press SET followed by EXIT to return to normal operation PLOT GRAPHS To plot graphs of Water Pressure Switch Live DHW Flow Rate DHW Temperature Flow Return Temperature Flame Status Outside Temperature or DHW Switched Live press MENU and the following screen will be displayed EXIT SELECT MENU SERVICE COMPANY NAME SERVICE COMPANY PHONE NUMBER SHOW EFFICIENCY L...

Page 44: ...ulted 9 Explain boiler restart procedure 10 After installation and commissioning please complete the Commissioning Checklist before handover to the customer For IE its is necessary to complete a Declaration of Conformity to indicate compliance to I S 813 IMPORTANT 11 A comprehensive service should be carried out ANNUALLY Stress the importance of regular servicing by a Gas Safe Registered Engineer ...

Page 45: ...cedures are covered more fully in Section 3 4 to 3 8 and MUST be carried out in sequence IMPORTANT 5 After completing the servicing or exchange of components always test for gas tightness 6 When work is complete the front panel MUST be correctly refitted ensuring that a good seal is made Do NOT OPERATE the boiler if the front panel is not fitted 7 If for any reason the condensate trap siphon has b...

Page 46: ... into a lower position 3 To gain access to the mains wiring connections remove retaining screw press the retaining lug to the left and lift off the cover Position 1 2 Position 2 Clip REMOVAL 1 Loosen the 2 screws retaining the front panel at the underside of the boiler 2 Release catches at underside of the front panel by pulling downwards 3a Pull the underside of the front panel forward then lift ...

Page 47: ...s 9 To remove the fan first remove the venturi as above and release the 3 screws securing the fan to the burner Note a mounting spacer is fitted to the fan outlet on 32 model only 10 Remove the fan from the burner assembly When replacing check the sealing gasket is undamaged or replace as necessary and secure with the 3 screws 2 3 3 4 7 Noise Damper Fitted on 32 models only Mounting Spacer Fitted ...

Page 48: ...e Replace as necessary Replacement of burner door sealing gasket 5b Remove the silicon seal from around the burner door location groove 6 Re new the seal and replace in reverse order 4 5 1 Refer to Sections 3 2 3 3 2 Remove the rubber condensate pipe from the top of the trap 3 Rotate the trap clockwise to disengage the trap and lift clear of the outlet connection 4 Flush out any debris under runni...

Page 49: ...the heat exchanger connected 3 Refit the fan to the burner assembly Refer to Section 3 4 4 Refit the venturi to the fan and burner assembly Refer to Section 3 4 5 Refit the burner fan venturi assembly into the heat exchanger and secure Refer to Section 3 4 6 Refit the gas pipe and secure with the 2 clips Refer to Section 3 4 7 Reconnect the ignition detection earth fan leads 8 Swing the control pa...

Page 50: ...outlet on 32kW model only 10 Replace the fan and refit the venturi checking the sealing gasket is undamaged or replace as necessary and secure with the 2 screws Note a noise damper is fitted to the venturi inlet on the 32kW models Note a mounting spacer is fitted to the fan outlet on 32kW 11 Check the operation of the boiler Refer to Sections 2 24 2 27 When replacing ANY component 1 Isolate the el...

Page 51: ...operation of the boiler Refer to Sections 2 24 2 27 8 3 14 RETURN THERMISTOR RENEWAL 1 Refer to Sections 3 2 to 3 3 2 Unclip the return thermistor 3 Disconnect the electrical lead from the thermistor 4 Reconnect the electrical lead to the new thermistor and reassemble in reverse order ensuring that the thermistor is securely fitted to the pipe on the thermistor locator tabs as shown 5 Check the op...

Page 52: ...into the burner door assembly and secure with the 2 screws ensuring correct orientation 7 Reconnect the ignition lead and earth 8 Check the operation of the boiler Refer to Sections 2 24 2 27 1 Refer to Sections 3 2 3 3 2 Disconnect the detection lead 3 Release the 2 securing screws and withdraw the probe 4 Ensure the sealing gasket is fitted to the replacement electrode and in good condition 5 Ca...

Page 53: ... Disconnect the gas service cock refer to Section 2 23 5 Remove the 2 securing screws in the underside of the boiler casing and remove the valve 6 Remove brass injector from gas valve outlet and re fit into replacement valve 7 Replace in reverse order ensuring all seals are in good condition and the assembly is gas sound 8 Check the operation of the boiler Refer to Sections 2 24 2 27 3 19 CONDENSA...

Page 54: ...order 8 Turn power on and follow the on screen instrucitons as shown Installer Initialise PCB YES Press YES Installer Switch mains off wait 5s then switch mains on Installer Processing Select boiler model 1 14 Combi 26kW Natural Gas NEXT SELECT Press NEXT until the desired boiler output and gas type is displayed Then press SELECT Program this model 7 14 System 15kW Natural Gas BACK YES Press YES t...

Page 55: ...ontrols housing lid Refer to Section 3 20 4 Remove the electrical cover at the clips indicated Refer to Section 3 20 5 Disconnect the 2 electrical connectors carefully 6 Remove PCB from mounting posts by releasing the 4 clips 7 Replace the PCB and refit in reverse order 8 Check the operation of the boiler Refer to Sections 2 24 2 27 3 21 USER PCB REPLACEMENT 1 3 23 PRESSURE GAUGE RENEWAL 1 Refer t...

Page 56: ...he boiler Refer to Sections 2 24 2 27 3 25 PUMP AUTO AIR VENT REPLACEMENT 1 Refer to Sections 3 2 3 3 2 Close the isolating service valves and drain the CH boiler Refer to Section 3 22 3 Remove the burner Fan assembly if required for access Refer to Section 3 4 4 The auto air vent is retained in the pump body with a bayonet connection The air vent and float assembly is removed by turning the head ...

Page 57: ...he CH boiler Refer to Section 3 22 3 Remove the condensate trap Refer to Section 3 19 4 Remove the retaining clip to the rear of the housing 5 Pull out the sensor and disconnect the electrical connection 6 Refit in reverse order 7 Open the isolating valves and refill the CH system Refer to Section 2 15 8 Check the operation of the boiler Refer to Sections 2 24 2 27 3 28 FLOW THERMISTOR REPLACEMENT...

Page 58: ... isolating valves and refill the CH system Refer to Section 2 15 14 Check the operation of the boiler Refer to Sections 2 24 2 27 5 7 10 6 9 4 3 30 EXPANSION VESSEL RECHARGING AND REPLACEMENT Recharging A Refer to Sections 3 2 3 3 B Remove the charge point dust cover C Recharge the tank pressure to 0 75bar D Refit in reverse order E Check the operation of the boiler Refer to Sections 2 24 2 27 Rep...

Page 59: ...1 Refer to Sections 3 2 3 3 2 Remove the old seal from the casing 3 Fit the new seal ensuring correct location over the fixing pins and the material is fully located within the casing 4 Reassemble in reverse order 5 Check the operation of the boiler Refer to Sections 2 24 2 27 3 SERVICING ...

Page 60: ...ection 4 13 No Connection to Primary PCB 5 Restarts within 15 minutes Turn power off and on Go to Section 4 6 Flame On before Gas Valve On Go to Section 4 7 Flow Thermistor Fault Go to Section 4 8 Outside Sensor Fault Go to Section 4 9 Return Thermistor Fault Go to Section 4 10 Fan Fault Replace PCB Go to Section 4 11 Low Water Pressure Less than 185V to boiler then check voltage at boiler mains i...

Page 61: ...sition refer to Section 3 17 Are these functioning correctly Check ignition electrode and associated harness for continuity visual condition and position refer to Section 3 15 Are these functioning correctly Check siphon and condensate drain pipework for blockage and rectify if necessary Boiler now working OK Restart boiler No No No No No No No No No No Yes Yes Yes Yes Yes Yes Yes Yes Yes Check th...

Page 62: ...lectrode and associated harness for continuity visual condition and position Check if the condensate pipe is blocked Check if the flue is blocked Replace as necessary Check gas supply and rectify fault Check wiring from gas valve to pcb and replace if necessary otherwise replace the main PCB Replace spark generator and harness as necessary Replace ignition electrode and associated harness as neces...

Page 63: ... to the Flame Sense Electrode Is there continuity between the Electrode and earth Is there continuity in the wiring from the primary PCB to the Thermistor 8 way connector connections 3 and 4 black and pink Does the Outside Sensor wiring between the boiler terminal strip and the PCB have continuity and is it securely connected 5 way low voltage connector connections 4 and 5 grey and black wires Is ...

Page 64: ...nections 5 and 6 black and red Is there 240Vac at the blue and brown connections to the 3 way connection on the Fan Does the wiring from the Water Pressure Switch to the PCB have continuity and is it securely connected Replace primary PCB Replace Fan Replace Water Pressure Switch Yes Yes Yes No No Yes Yes No Yes No No No Fit a new thermistor Rectify wiring connections Fill and vent the system and ...

Page 65: ...oes the fault disappear Are the Radiator Valves open Does the zone valve move to the appropriate position Is an Ideal Electronic Programmable Room Stat connected Is there 240Vac at A Is there a lin programmer insert aperture Replace main PCB No No Yes No Yes No Yes Yes Yes No Yes Yes Yes Ensure that the Timer and Room Thermostat are calling for heat Open the Radiator Valves Consult Electronic Prog...

Page 66: ...e from the main PCB to the user interface PCB have continuity and is it un damaged Is the Fuse on the main PCB OK Replace the user interface PCB still no display No No No No No No Yes Yes Yes Yes Yes Yes No Supply power to the boiler Connect the wiring from the terminal block to the main PCB securely Replace the wiring from the boiler terminal block to the Main PCB Connect the cable from the main ...

Page 67: ... by Ideal Failure to do so could affect safety or performance of this appliance Comprehensive spares parts information and details of approved Ideal Parts Distributors are available on www idealparts com Our Parts team are also available to help with your Ideal Spare Parts enquiries on 01482 498665 When calling and to ensure we can provide you with the most accurate parts information please ensure...

Page 68: ...68 SHORT LIST OF PARTS Installation and Servicing ...

Page 69: ...commissioning checklist completed in full To instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the installation To maintain the boiler guarantee it is essential that the boiler is serviced annually by a Gas Safe registered engineer who has been trained on the boiler installed The service details should be recorded on the Benchmark Service In...

Page 70: ...opriate Building Regulations and then handed to the customer to keep for future reference GAS BOILER SYSTEM COMMISSIONING CHECKLIST CONTROLS Programmable room thermostat Optimum start control Combination Boiler Fitted Fitted Fitted Automatic bypass to system Fitted Boiler interlock ALL SYSTEMS Yes Yes CENTRAL HEATING MODE OR mbar OR mbar Central heating return temperature COMBINATION BOILERS ONLY ...

Page 71: ...ularly and that the appropriate Service Interval Record is completed Service Provider SERVICE RECORD SERVICE 01 AND Where Possible AND Signature SERVICE 02 AND Where Possible AND Signature SERVICE 03 AND Where Possible AND Signature SERVICE 04 AND Where Possible AND Signature SERVICE 05 AND Where Possible AND Signature SERVICE 06 AND Where Possible AND Signature SERVICE 07 AND Where Possible AND S...

Page 72: ...FITTED BY PERSONS OTHER THAN THE BOILER INSTALLER visually check the integrity of the whole flue system to confirm that all components are correctly assembled fixed and supported Check that maximum flue lengths have not been exceeded and all guidance has been followed e g Gas Safe Register Technical Bulletin TB 008 where chimney flues are in voids The ECGA should be of the correct type as specifie...

Page 73: ...mbled fixed and supported as per instructions Check that flue and flue terminal are not obstructed Check that no seals e g Those on flue extensions have been displaced during installation Rectify if necessary Turn off appliance and call Ideal Technical Helpline for advice The appliance must not be commissioned until problems are identified and resolved If commissioning cannot be fully completed th...

Page 74: ...74 Installation and Servicing NOTES ...

Page 75: ...75 Installation and Servicing NOTES ...

Page 76: ...76 Installation and Servicing NOTES ...

Page 77: ...77 Installation and Servicing NOTES ...

Page 78: ...78 Installation and Servicing NOTES ...

Page 79: ...79 Installation and Servicing NOTES ...

Page 80: ...The code of practice for the installation commissioning servicing of central heating systems Ideal Boilers Ltd PO Box 103 National Avenue Kingston Upon Hull HU5 4JN Tel 01482 492251 Fax 01482 448858 Registration No London 322 137 Ideal Technical Helpline 01482 498663 Ideal Consumer Helpline 01482 498660 www idealboilers com FM 59915 Ideal Boilers Ltd pursues a policy of continuing improvement in t...

Reviews: