
17
Viceroy GT -
Installation & Servicing
INSTALLATION
20 PREPARATION FOR FITTING THE FLUE CLEANOUT AND BURNER DOORS
1.
Screw in and tighten the eight M12x50 studs
for the cleaning doors and the burner door
and the M12x85 studs for the hinges of the
flue cleanout doors. (short end into the
section)
2.
Fit the hinges for the flue cleanout doors
(pack IE 20) using two M12x25 bolts,
serrated washers (DEI2) and nuts.
3.
Fit the combustion chamber door hinge
(body accessories pack) on the left or the
right according to the direction in which the
door will be opened, and fix using three
M12x30 bolts and washers.
4.
Fix the burner door guide bracket (body
accessories pack) using two M12x25 bolts
and washers (L12).
21 ASSEMBLING THE BURNER AND FLUE CLEANOUT DOORS
1.
Position the burner door in place and
secure with four M12 nuts and washers.
2.
Locate the hinge and secure with the
hinge pin.
3.
Remove the three M12x30 bolts and washers on the side
the burner door is to be hinged.
4.
Swing the hinge into place and secure to the burner door.
5.
Leave the three M12x30 bolts and washers in the other
side of the burner door.
6.
Fit the left and right hand flue cleanout doors in place with
their pins (pack IE 20)
Note.
Do not close and secure the doors at this time.
1
2
vis7093
3x
2x
1
2
vis7094
6
6
4
3
5
3 x M12x30
vis7095
INST
ALLA
TION