
13
Viceroy GT -
Installation & Servicing
INSTALLATION
REAR
FRONT
vic7086
turbul
Baffle
Burner
door
insulation
vic7085
12 BURNER CONNECTION
Gas Supply
The gas supply MUST be sized in accordance with
British Gas recommendations.
The Local Gas Authority should be contacted, at a stage
prior to actual installation, for any advice or information
required.
Oil Storage Tank
The oil storage tank, oil supply pipe and connections to
the burner unit MUST comply with the requirements of
BS. 799.
The installation should conform to the recognised
standards of good practice in the trade and comply with
the relevant Codes of Practice, building Regulations and
Local Authority, Fire and Insurance requirements.
IMPORTANT.
The burner head deflector must be in line
with the door insulation as shown opposite.
Connection, adjustment, start-up and maintenance.
(Refer to the instructions delivered with the burner)
13 ASSEMBLY
Packaging:
The tables below show the numbers of the packages
which make up the boiler. The packages are listed in
the order in which they are opened for assembly.
Tools required:
(not supplied)
- 12mm Allen key
- Cross head screwdriver
- 13, 19 and 24mm spanners
- Knife
- Hammer
- 22mm Box spanner
- JDTE assembly tool
The assembly of any optional devices purchased with the
boiler is described in the instructions supplied with the relevant
device. The list of available optional devices is shown on page 3.
Burner Door Opening and Fixings
vic7076
Base frame
1
1
1
1
1
1
1
(dimensions according to model)
Front section
1
1
1
1
1
1
1
Normal intermediate section
5
6
7
8
9
10
11
Special intermediate section
1
1
1
1
1
1
1
Rear section
1
1
1
1
1
1
1
Common accessories
IE20
IE 20
IE20
IE20
IE20
IE20
IE20
Boiler accessories in bulk
1
1
1
1
1
1
1
(contents according to model)
Baffles
IE30
IE31
IE31
IE32
IE32
IE33
IE33
Base insulation
IE51
IE53
IE53
IE55
IE55
IE57
IE57
Casing: common parts
IE10
IE10
IE10
IE10
IE10
IE10
IE10
Casing: varying parts
IE12
IE13 &
IE11 &
IE12 &
IE13(2)
IE11 &
IE12 &
IE14
IE13
IE13
IE14
IE13 (2)
IE 13 (2)
Wiring ducts
IE41
IE42
IE43
IE44
IE45
IE46
IE47
Control panel - Standard
FD167
FD167
FD167
FD167
FD167
FD167
FD167
- Deluxe
FD168
FD168
FD168
FD168
FD168
FD168
FD168
Burner door
1
1
1
1
1
1
1
Boiler
GT 8
GT 9
GT 10
GT 11
GT12
GT 13
GT 14
INST
ALLA
TION