IDEAL Vanguard L 1100 Installation And Servicing Download Page 4

4

Vanguard L  - 

Installation & Servicing 

GENERAL

SAfETy

current Gas Safety (Installation and use) Regulations or 

rules in force.

It is law that all gas appliances are installed and serviced 

by a Gas Safe Registered Engineer in accordance with the 

regulations below.  Failure to install appliances correctly could 

lead to prosecution.  It is in your own interest, and that of safety, 

to ensure the law is complied with.

The following must be conformed with:

Current Building Regulations and Clean Air Act
Water Authority Regulations
Local Authority Regulations and Regional Bylaws
Gas Safety Regulations
Any special regional requirements of local Electricity and Gas 

undertaking.
Fire Service and Insurance Company requirements.

In the interests of safety, a competent installer should 

be employed to effect the installation of the appliance.  

Manufacturer's notes must NOT, in any way, be taken as over 

riding statutory obligations.

The installation of the boiler MUST also be in accordance with 

the latest I.E.E. (BS7671) Wiring Regulations, local buildings 

regulations, bye-laws of the local water authority, the building 

regulations and the Building Standards (Scotland) and any 

relevant requirements of the local authority.

Detailed recommendations are contained in the following Codes 

of Practice:

BS 799 Pt4 & 7  Oil burning equipment.
BS 799 Pt5 

Oil storage tanks.

BS 5410 Pt2 

Installation for space heating, hot water and 

steam supply.

BS 5854 

Flues and flue structures in buildings.

BS 5885 Pt1 

Gas burners - with inputs 60kW and above.

BS 6644 

Installation of gas fired hot water boilers of 

rated input between 70kW and 1.8MW net 

(2nd and 3rd family gases).

BS 6880 

Low temperature hot water heating systems of 

output greater than 45kW.

       Part 1  

Fundamental and design considerations.

       part 2  

Selection of equipment.

       part 3  

Installation, commissioning and maintenance.

BS 6891 

Installation of low pressure gas pipework of 

up to 28mm (R1) in domestic premises (2nd 

family gas).

EN 303.1 

Heating boilers with forced draught burners.  

General requirements.

EN 303.2 

Heating boilers with forced draught burners 

with atomizing oil burners.

NoTE To THE INSTALLER: LEAVE THESE INSTRucTIoNS ADJAcENT To THE BoILER.

EN 304 

Test code for heating boilers for atomizing oil 

burners.

73/23 EEC 

Low voltage directive. (Relevant standard is 

EN60335.1)

89336 EEC 

Electromagnetic Compatibility Directive. 

(Relevant standards are EN50081.1, 

EN50082.1 and EN55014.)

90396 EEC 

Gas Devices Directive. (Relevant standards are 

EN303.1, EN303.2 and EN304.)

IGE/UP/1 

Soundness testing and purging of industrial and 

commercial gas installation.

IGE/UP/2 

Gas installation pipework, boosters and 

compressors on industrial and commercial 

premises.

IGE/UP/10 

Installation of gas appliances in industrial and 

commercial premises.

SAfE HANDLING of SuBSTANcES

Care should be taken when handling the boiler insulation panels, 

which can cause irritation to the skin.  No asbestos, mercury or 

CFCs are included in any part of the boiler or its manufacture.

GAS SuPPLy

The local gas supplier should be consulted, at the installation 

planning stage, in order to establish the availability of an adequate 

supply of gas.  An existing service pipe must NOT be used without 

prior consultation with the local gas supplier.
A gas meter can only be connected by the local gas supplier or by 

a Gas Safe Registered Engineer.
An existing meter should be checked, preferably by the gas 

supplier, to ensure that the meter is adequate to deal with the 

rate of gas supply required.  A minimum working gas pressure of 

17.5mbar MUST be available at the boiler inlet for Natural gas 

and 37mbar for Propane.
Do not use pipes of smaller size than the burner inlet gas 

connection.
The complete installation MUST be tested for gas soundness and 

purged in accordance with the appropriate standards listed above.

Gas Boosters

A gas booster is required if the gas pressure available at the 

burner is lower than that required by the burner manufacturer to 

attain the flow rate for maximum burner input rating.

Location of the booster requires careful consideration but 

should preferably be closer to the burner rather than the gas 

meter.  Ventilation should also be considered to ensure ambient 

temperatures do not exceed designed recommendations.  Further 

guidance is provided in IGE/UP/2 as listed above.

Assembly and Installation Instructions for Ideal Vanguard L heating boilers should be read in conjunction with the general 

technical data tables enclosed and any other technical publication supplied with the burner.

Summary of Contents for Vanguard L 1100

Page 1: ...you can be assured conform to the safety and performance specification that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy o...

Page 2: ...60 90 60 90 60 90 Safety thermostat setting C 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 High low setting C 54 84 54 84 54 84 54 84 54 84 54 84 54 84 54 84 54 84 54 84 54...

Page 3: ...ficiency operation ease of maintenance fuel flexibility and low emissions Suitable for oil or gas operation the Vanguard L range is supplied in a choice of 18 standard models rated in outputs from 130...

Page 4: ...ACENT TO THE BOILER EN 304 Test code for heating boilers for atomizing oil burners 73 23 EEC Low voltage directive Relevant standard is EN60335 1 89336 EEC Electromagnetic Compatibility Directive Rele...

Page 5: ...lime reduces the heat transfer from metal to water by 10 In practice the deposition of these salts is liable to cause noises from the boiler body or even premature boiler failure Corrosion and the fo...

Page 6: ...170 630 T1 Flow connection T2 Return connection T3 Safety valve and expansion connection T4 Drain connection T5 Flue connection T6 Burner connection Boiler Size 170 240 290 340 420 510 630 Dimension A...

Page 7: ...E T1 N O P T3 T2 I H T6 T4 T5 T1 T3 T2 1 2 3 4 41 11 16 17 30 24 12 13 21 14 15 22 23 40 van8099 Boiler Size 760 870 970 Dimension A mm 1122 1122 1122 Dimension B mm 1605 1800 1995 Dimension C mm 1432...

Page 8: ...dimensions for boiler room access requirements Boiler Size 1100 1320 1570 1850 2200 2650 3000 3500 Dimension A mm 1352 1352 1462 1462 1622 1622 1720 1970 Dimension B mm 1952 2292 2282 2652 2692 3014 3...

Page 9: ...oned so that there is enough space available to allow the following Access around the boiler for servicing Space to open the boiler front door Space to access the burner Recommended minimum clearances...

Page 10: ...of the system 4 The boiler is at the highest point of the system Systems designed to rise above the flow connections will of course automatically require a minimum static head higher than shown 5 The...

Page 11: ...g Other British Standards applicable to commercial sealed systems are BS6880 Part 2 BS 1212 BS 6281 Part 1 BS 6282 Part 1 BS 6283 Part 4 8 Ventilation Safe efficient and trouble free operation of conv...

Page 12: ...shall be inclined upwards at 45 9 Fluing Flue Size Refer to applicable regulations while determining the size and height of the flue Please note that Vanguard L boilers have pressurised and sealed com...

Page 13: ...ght Jacket 1 Upper Rear Central Left Jacket 1 Support for the Upper Jacket 1 Body Insulation 1 1 1 1 1 1 Front Insulation 1 1 1 1 1 1 Rear Insulation 1 1 1 1 1 1 Central Body Insulation 1 1 Rear Side...

Page 14: ...M16 8 8 8 8 8 8 8 16 16 16 16 16 16 16 16 16 16 16 M12x60 M12x60 M16x70 M16x70 M16x70 M16x70 M16x70 M16x70 M16x70 M16x70 M20x80 M20x80 M20x80 M20x80 M20x80 M20x80 M120x80 M20x80 1 1 1 1 1 1 1 1 1 1 1...

Page 15: ...nels 3 and 4 D Fit the rear insulation 6 fix the rear lower and upper retaining strips 7 and 8 with the self tapping screws Fit the plastic cable clamps 9 to the upper rear panel 8 E Fit the Ideal bad...

Page 16: ...3 4 van8103 16 Position of thermometer thermostat sensor in the bulb holder Vanguard L 170 to 970 LEGEND 1 Thermometer bulb 2 Operation thermostat bulb 3 Safety thermostat bulb 4 Minimum temp thermost...

Page 17: ...r insulation 7 fix the rear lower panels 9 with pins and springs and the upper panel 10 with the self tapping screws 8 Fit the plastic cable clamps 11 to the upper rear panel 10 E Fit the Ideal badge...

Page 18: ...the plastic cable clamps 8 to it E Fit the Ideal badge to the front edge of the front top panel 9 and secure with the rubber fixings F Fit the control panel to front top panel 9 Remove the upper shell...

Page 19: ...front edge of the front top panel 8 and secure with the rubber fixings F Fit the control panel to front top panel 8 Remove the upper shell of the control panel and insert the capillaries of thermomete...

Page 20: ...ok them to the screws fitted to the upper square tube To determine which one of the front side panels is the left or the right ensure that the cable clamp plates 7 are positioned facing toward the fro...

Page 21: ...ostat 3 Safety thermostat 4 Minimum thermostat Ensure that the sensors are inserted to the bottom of the bulb holder and then secure them with the retaining clip 5 In case some other thermostat is nec...

Page 22: ...mber can be achieved through adjustment of the screws 23 Door Assembly Vanguard L 170 to 630 Models The combustion chamber door is fitted with four fixing points two on the left hand side which are no...

Page 23: ...when reversing the door the bushing 9 nut 10 and washer 11 will have to be moved as shown below details 1 and 3 for hinge side details 2 and 4 for hinge side Door Adjustment 1 Vertical door adjustmen...

Page 24: ...be and the hole in the door insulation Gas Supply The gas supply MUST be sized in accordance with British Gas recommendations and be prefabricated in compliance with CP 331 Pt 1 and any Local Gas Boar...

Page 25: ...ur meter not supplied High low regulating thermostat Minimum thermostat Safety thermostat with manual reset N B With three phase the motor must be connected directly in this case the instrument panel...

Page 26: ...tting Live on this lead hence on T2 allows burner to fire on low fire in a 2 stage burner No 10 S3 Burner lockout indicator Feeds signal from lockout terminal on burner control box to a remote lock ou...

Page 27: ...FF Switch illuminated Position I ON Position OFF 12 Burner Switch Position I ON Position OFF 13 Pump Switch Position I I ON Position OFF 21 Boiler ON OFF High Low Thermostat High fire 54 C 84 C low fi...

Page 28: ...tors will be placed inside the relevant smoke pipes at a distance from the front tube plate as shown in the picture on the right When using the boiler at minimum output the smoke temperature will not...

Page 29: ...and drain down to complete the flushing process c Refill and vent the system clear all air locks and again check for water soundness d Balance the system 3 Finally set the controls to the User s requ...

Page 30: ...freezing Otherwise drain the system completely 39 Safety For boilers with gas burners It is the law that any service work must be carried out by a Gas Safe Registered Engineer WARNING Always turn off...

Page 31: ...es 4 Close off the fuel supply to the burner 5 Ensure that the boiler has been cooled to ambient temperature 6 Isolate the mains supply to the boiler and burner 7 Open the combustion chamber door afte...

Page 32: ...Technical Helpline 01482 498 376 www idealheating com Ideal Boilers P O Box 103 National Ave Kingston upon Hull HU5 4JN Telephone 01482 492 251 Fax 01482 448 858 Registration No London 322 137 Ideal...

Reviews: