
15
INSTALLATION
Project Heat -
Installation and Servicing
325
324
219
303
506
308
307
306
106
512
505
504
215
225
227
233
226
224
503
214
205
204
206
211
217
223
218
103
104
313
105
401
302
229
231
301
304
228
203
314
BCC*
Note
that item numbers are linked to the spares list
103
HEAT EXCHANGER DRAIN
104
FLOW SENSOR
105
PIPE - FLOW
106
PIPE - RETURN
203
GAS COCK
204
PIPE - GAS INLET
205
GAS VALVE
206
PIPE - GAS INJECTOR
211
INJECTOR ASSEMBLy
214
VENTURI
215
FAN
217
BURNER
218
GASKET - BURNER
219
SUMP CLEAN OUT COVER
10 BOILER assEMBLy - Exploded View
223
FLUE MANIFOLD
224
FLUE MANIFOLD TOP
225
FLUE MANIFOLD - TOP SEALING CAP
226
FLUE MANIFOLD - REAR SEALING CAP
227
CLAMP RETAINING FLUE TURRET
228
HOSE CONDENSATE INTERNAL
229
SIPHON TRAP
231
CONDENSATE OUTLET CONNECTION
233
FLUE SENSING NIPPLE
301
CONTROLS BOX FIXINGS HINGE & SPRING
302
PRIMARy PCB*
303
CUI BOARD
304
CONTROL THERMISTOR (RETURN)
306
ELECTRODE IGNITION
307
ELECTRODE DETECTION
308
IGNITOR UNIT
313
IGNITION LEAD
314
CONTROL BOX LENS
324
CONTROLS BOX LID
325
CONTROL BOX FRONT
401
HEAT ENGINE
503
WALL MOUNTING BRACKET
504
FRONT PANEL
505
FASCIA
506
BRACKET - GAS VALVE
512
INFILL FRONT PANEL
IN
s
T
a
LL
a
TION
* Note that production boiler PCBs are factory pre-set to
operate for boiler range and output, but when ordering
Primary PCB as a spare, an additional Boiler Chip Card
(BCC) MUST also be purchased for your specific boiler
range and output.