
19
MSC-18K-X
May 2019
3.4 OPERATION TEST
The mobile column lifts are designed in such a way as to offer maximum flexibility and convenience.
A lifting system can consist of 4 lifting columns.
The mobile column lifts are
set-up
as following:
1. Position the lifting columns as indicated in 3.3 (Fig. 3.3.)
2. Then turn on the battery power switch of each column on the side.
3. Set the control box power switch on each sub column to left position (ON) first, the green Power
indicators will be on.
4. Then turn on the switch on main column to left (ON) and the LCD screen is lighted.
5. Wait until the LCD screen displays
‘Press START…’, then press the START button to start
running of the software.
6. Take care that the emergency stop button of each lifting column must been released.
Unloaded Rise
:
1. Press and hold the
“UP” button on the master 1# column panel, check if the carriages rise normally.
Repeat to try the other columns in same way.
2. Press and hold the
“UP” button and allow the carriage to rise to its highest position. Check for any
hydraulic leaks.
Emergency Stop
:
1. Push down the red emergency button to stop the lifts while rising.
2. Turn red emergency button to release it after test.
Lower Down
:
1. Press and hold the
“DOWN” button, the carriages will go up a little automatically to disengage the
safety locks first, then go down.