INSTALLATION
Mini
--- Installation & Servicing
14
9
UNPACKING
The boiler is supplied fully assembled in one pack A, together
with a standard flue assembly for lengths up to 960 mm
(37” 3/4), rear or side flue outlet, in pack B.
Unpack and check the contents.
Pack A contents
A The boiler.
B Hardware pack
C Wall mounting plate
D Wall mounting template
E Installation & Servicing instructions.
F The User’s Instructions.
G Filling loop assembly
H Restrictor pack
A
B
C
D
E
F
G
H
Hardware pack contents
F
22 mm CH connection pipe --- 2 off.
F
22 mm Gas supply connection pipe --- 1 off.
F
15 mm DHW cold inlet connection pipe --- 1 off. *
F
15 mm DHW hot outlet connection pipe --- 1 off. *
F
1/2” connection nut --- 2 off. *
F
1/2” sealing washer --- 3 off. *
F
3/4” sealing washer --- 6 off.
F
3/4” Gas supply isolating valve --- 1 off.
F
3/4” CH circuit isolating valve --- 2 off.
F
1/2” DHW cold inlet isolating valve --- 1 off. *
*
Mini C24
,
Mini C28
and
Mini C32
only
Pack B contents
I
Air intake pipe ø 100 mm (4”)
J Flue pipe ø 60 mm (2” 3/8) with terminal grille assembly
K Band
L Turret---air pipe gasket
M Flue pipe gaskets --- 2 off
N Boiler---turret gasket
O Flue turret
P Self tapping screws 4,8x13 --- 4 off
Q Self tapping screw 4,2x13 --- 2 off
R Wall finishing gaskets --- 2 off
J
I
K
L
M
N
O
P
R
Q
Optional extras, if ordered, are available in separate boxes.
F
Electronic programmer kit *
F
Extension duct kit pack D (ø 60/100)
F
Flue support kit
F
Vertical outlet flue kit with elbow (ø 60/100)
F
90
˚
Elbow kit (ø 60/100)
F
45
˚
Elbow kit (ø 60/100)
F
Roof flue kit (ø 80/125)
F
Pitched roof tile (for roof flue kit)
F
Flat roof tile (for roof flue kit)
F
Extension duct kit (ø 80/125)
F
90
˚
Elbow kit (ø 80/125)
F
45
˚
Elbow kit (ø 80/125)
F
Condense drain (ø 80/125)
F
Twin pipe kit (ø 80) with air and flue terminals
F
Extension duct kit (ø 80)
F
90
˚
Elbow kit (ø 80) female---female
F
90
˚
Elbow kit (ø 80) male---female
F
45
˚
Elbow kit (ø 80) male---female
F
Condense drain (ø 80)
F
Condense trap
F
Stand---off bracket
F
Pre---piping frame
F
Natural gas to LPG conversion kit
F
LPG to natural gas conversion kit
10 PACKAGING
To unpack the boiler refer to the instructions on carton end
flap.
INST
ALLA
TION