background image

 

12

 

Indep Combi - 

Installation and Servicing

gENERaL

The boiler does not normally need a bypass but at least some radiators on the heating circuit, of load of at least 10% of the 

minimum boiler output, must be provided with twin lockshield valves so that this minimum heating load is always available. See 
note regarding thermostatic radiator valves on page 9.

Note. 

Systems incorporating zone valves which could completely cut off the flow through the system must also include a bypass.

BaLaNCINg

sysTEM BaLaNCINg

1.  Set the programmer to ON.

 

Close the manual or thermostatic valves on all radiators, 
leaving the twin lockshield valves (on the radiators referred 
to above) in the OPEN position.  

 

Turn up the room thermostat and adjust the lockshield 

valve to give an uninterrupted flow through the radiator.

 

These valves should now be left as set.

2.  Open all manual or thermostatic radiator valves and adjust 

the lockshield valves on the remaining radiators, to give 

WaTER TREaTMENT

CENTRaL  hEa TINg

The Indep Combi range of boilers have an 
aLUMINIUM alloy heat exchanger.

IMpORTaNT.
The application of any other treatment to this product may 
render the guarantee of Ideal stelrad group Invalid.

Ideal stelrad group  recommend Water Treatment in 
accordance with the Benchmark Guidance Notes on Water 
Treatment in Central Heating Systems.

If water treatment is used Ideal stelrad group recommend only 
the use of Scalemaster Gold 100, 

FERNOx-MB-1, ADEY MC1 

or SENTINEL-x100 

inhibitors and associated water treatment 

products, which must be used in accordance with the 
manufacturers’ instructions.  

Notes.

1. 

It is most important that the correct concentration of the 

water treatment products is maintained in accordance with 

the manufacturer’s instructions. 

2. 

If the boiler is installed in an existing system any unsuitable 

additives MUST  be removed by thorough cleansing. BS 

7593:2006 details the steps necessary to clean a domestic 

heating system.

3. 

In hard water areas, treatment to prevent lime scale may be 

necessary -  however the use of artificially softened water is 

NOT  permitted.

4. 

Under no circumstances should the boiler be fired  before the 

system has been thoroughly flushed.

DOMEsTIC hOT W aTER

In hard water areas where mains water can exceed 200ppm 

Total Hardness (as defined by BS 7593:2006 Table 2) a 

scale reducing device together with Scalemaster in-line scale 

inhibitor branded Ideal should be fitted into the boiler cold 

supply within the requirements of the local water company. 

The use of artificially softened water, however, is not 

permitted.

Ideal stelrad group  recommend the use of Fernox 
Quantomat, Sentinel Combiguard and Calmag CalPhos I scale 
reducing devices, which must be used in accordance with the 
manufacturers’ instructions. 

For further information contact:

Fernox Cookson Electronics 
Forsyth Road, Sheerwater, Woking, Surrey 
GU21 5RZ
+44 (0) 8706 015000

Sentinel Performance Solutions 
The Heath Business & Technical Park 
Runcorn, Cheshire WA7 4Qx 
Tel: 0800 389 4670

Scalemaster Water Treatment Products 
Emerald Way, Stone, Staffordshire ST15 0SR 
Tel: +44 (0) 1785 811636

Calmag Ltd. 
Unit 3-6, Crown Works, Bradford Road,  
Sandbeds, Keighley, West Yorkshire BD20 5LN 
Tel: +44 (0) 1535 210320

Adey Professional Heating Solutions
Gloucester Road, Cheltenham GL51 8NR
Tel: +44 (0) 1242 546700

around 20

o

C temperature drop at each radiator.

3.  Adjust  the room thermostat and programmer to NORMAL 

settings. 

Summary of Contents for INDEPENDENT C35

Page 1: ...STALLATION AND SERVICING Independent Combi C24 C30 C35 For details of document amendments refer to page 3 For users guide see reverse of book When replacing any part on this appliance use only spare p...

Page 2: ...nt Combi Installation and Servicing U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d B D 8 9 H Q 0 1 2 7 4 4 8 8 3 8 8 w w w h e a t i n g s p a r e s...

Page 3: ...he ideal installer helpline 01482 498704 NOTE BOILER RESET PROCEDURE To reset boiler turn mode knob to reset position and immediately turn knob back to required setting The boiler will repeat the igni...

Page 4: ...designed for connection via ducts to a horizontal or vertical terminal which admits fresh air to the burner and discharges the products of combustion to the outside through orifices which in this cas...

Page 5: ...back page Page Burner operating pressure n a Central heating flow temp measure and record Central heating return temp measure and record For combination boilers only Scale reducer 12 Hot water mode He...

Page 6: ...rise The DHW draw off rate specified above is the nominal that the boiler flow regulator will give Due to system variations and seasonal temperature fluctuations DHW flow rates temperature rise will v...

Page 7: ...invalidate the certification and the normal appliance warranty It could also infringe the Gas Safety Regulations and the above regulations SAFE HANDLING OF SUBST ANCES No asbestos mercury or CFCs are...

Page 8: ...n Spacing 1 Directly below above or alongside an opening window air vent or other ventilation opening 300mm 12 2 Below guttering drain pipes or soil pipes 25mm 1 BS5440 1 2008 75mm 3 3 Below eaves 25m...

Page 9: ...e minimum boiler heat output should be achieved using a room thermostat whilst other rooms are individually controlled by thermostatic radiator valves However if the system employs thermostatic radiat...

Page 10: ...less than the length of flue required the flue must be fitted from the outside Installation from inside ONLY b If a core boring tool is to be used inside the building the space in which the boiler is...

Page 11: ...e connection is only allowed if acceptable to the local water authority b Antifreeze fluid corrosion and scale inhibitor fluids suitable for use with boilers having aluminium heat exchangers may be us...

Page 12: ...s is maintained in accordance with the manufacturer s instructions 2 If the boiler is installed in an existing system any unsuitable additives MUST be removed by thorough cleansing BS 7593 2006 detail...

Page 13: ...CTOR ASSEMBLY 214 VENTURI 215 FAN 217 BURNER 218 GASKET BURNER 219 SUMP CLEAN OUT COVER 223 FLUE MANIFOLD 224 FLUE MANIFOLD TOP 227 CLAMP RETAINING FLUE TURRET 228 HOSE CONDENSATE INTERNAL 229 SIPHON...

Page 14: ...or non telescopic flue assembly for rear or side flue outlet in Pack B is suppled as a separate order Unpack and check the contents Pack A Contents A Boiler B Hardware Bag C Wall Mounting Plate D The...

Page 15: ...inal Wall Seal D Cutting Aid Note This flue system incorporates a removable flue outlet nose that utilises a push fit location system This enables the installation of deflector high level or balcony o...

Page 16: ...se damage or personal injury 1 Cut the flue hole preferably with a 5 core boring tool ensuring that the hole is square to the wall Both wall faces immediately around the cut hole should be flat 2 Dril...

Page 17: ...ith a screw cap seal and a lower air sample point with an air stopper seal Ensure all caps seals are in place Additional Termination Kits available for use with these B packs Flue Deflector Kit The re...

Page 18: ...0mm long B Pack Telescopic Cut 75mm Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum B Pack Standard 171 556 286 484 601 816 526 741 Plus 1 1m D pack 1121 1506 1236 1434 1551 1766 1476...

Page 19: ...holes in the outer flue section into the inserted outer flue as shown Take care not to pierce the inner plastic flue Fit screw provided 5 Seal the joint on the outer air duct with the tape provided 6...

Page 20: ...tted 7 Ensure the seam and the outlet terminal are at the top and fitted as shown Note If less than 50 of the length of the flue is internal the flue should be fitted from outside Fitting the Turret 1...

Page 21: ...cessories Flue Duct Extension Kits are available for flue lengths extending beyond 1m These packs contain 1m extension ducts and may be cut to the desired length If the offset vertical option is used...

Page 22: ...nal Position Minimum Dimension Directly below an opening air brick windows etc 300 mm Below plastic painted gutters 300 mm Painted surface 300 mm Below eaves or balcony 500 mm Below velux windows 2000...

Page 23: ...ure the vertical connector by applying downward pressure on the connector 4 Position the clamp on the top face of the flue manifold and push it horizontally backwards Locate both clamp lugs into the f...

Page 24: ...only be considered after exhausting all internal termination options as described previously An external system must terminate at a suitable foul water discharge point or purpose designed soak away If...

Page 25: ...ensate trap Min 19mm Internal pipe Min 30mm Internal pipe Water weather proof insulation 75 Boilers without 75mm sealed condensate trap must be fitted with a 75mm trap and visible air break Visible ai...

Page 26: ...not create a hazard to the occupants of the premises or damage the electrical components and wiring FILLING Important when filling A Ensure the dust cap on air vent located at the rear of the pump cha...

Page 27: ...ed 24 electrical connections Wiring should be 3 core PVC insulated cable not less than 0 75mm2 24 x 0 2mm and to BS 6500 Table 16 For IE reference should be made to the current ETCI rules for electric...

Page 28: ...3 5 4 1 2 3 1 2 1 2 1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 Water Pressure Sensor Water Flow Turbine Fan Flow Thermistor Return Thermistor Flame Sensor Electrode Spark Electrode Spark Generator p...

Page 29: ...aving checked That the boiler has been installed in accordance with these instructions The integrity of the flue system and the flue seals as described in the Flue Installation section Proceed to put...

Page 30: ...turned off 2 Refit the boiler front panel Refer to Frame 34 3 Check that the drain cock is closed and that the CH and DHW isolating valves M L and G are OPEN 4 Check that the electrical supply is OFF...

Page 31: ...should read neon flashing then neon steady when the burner lights 2 Close all taps except the furthest one from the boiler and check that the boiler is firing at maximum rate This is factory set to gi...

Page 32: ...economy consistent with the household requirements of both heating and hot water consumption Advise the User of the precautions necessary to prevent damage to the system and to the building in the eve...

Page 33: ...carried out in sequence Important 6 After completing the servicing or exchange of components always test for gas tightness 7 When work is complete the front panel MUST be correctly refitted ensuring...

Page 34: ...f necessary 1 2 3 5 Injector REMOVAL 1 Loosen the two screws retaining the front panel 2 Pull the two spring clips down to disengage and pull panel forward and upward and remove REPLACEMENT 3 Hook the...

Page 35: ...t the burner is not placed down upon its face as this may cause damage to the ceramic 6 Brush off any deposits that may be on the ceramic with a SOFT brush 7 Inspect the sealing gasket around the burn...

Page 36: ...on Electrode Flame Detection Reassemble the boiler in the following order 1 Ensure that the condensate trap siphon is full of water 2 Refit the burner ensuring the sealing gasket is correctly position...

Page 37: ...onnect the electrical leads from the fan 3 Undo the gas pipe union connection to the injector housing 4 Remove the extended nut retaining the fan mounting bracket 5 Lift and remove the fan and venturi...

Page 38: ...ration of the boiler Refer to Frames 29 30 2 4 3 6 43 burner REPLACEMENT 5 5 6 1 See Frame 39 2 Refer to Frame 40 3 Undo the two screws and remove the sump cover 4 Lift the manifold to clear the botto...

Page 39: ...30 44 return thermistor reNEW AL 1 Refer to Frame 40 2 Unclip the return thermistor from the return pipe and withdraw it from the boiler 3 Disconnect the electrical lead from the thermistor 4 Reconne...

Page 40: ...r to Frames 29 30 Flame Detection Electrode Spark Generator 12 5mm Straight edge 1 Refer to Frame 40 2 Remove the burner Refer to Frame 43 3 Unplug the flame detection lead from the electrode 4 Remove...

Page 41: ...the two sealing washers are in place and reconnect gas and electrical connections 7 Check operation of the boiler Refer to Frames 29 30 49 diverter valve actua tor replacement 1 Refer to Frame 40 2 R...

Page 42: ...te Boiler Chip Card BCC to it this should correspond to the output of the boiler 24kW 30kW or 35kW Note Ensure the correct orientation of BCC by placing TOP side up as shown 8 Re connect all plug conn...

Page 43: ...o be in vertical position PCB 4 1 Remove the boiler front panel Refer to Frame 34 2 Pull out the plate with timer attached 3 Disconnect 5 way connector 4 Remove programmer and fit new programmer 5 Re...

Page 44: ...essurise as appropriate 5 Check operation of the boiler Refer to Frames 29 30 CENTRAL HEA TING CIRCUIT 1 Refer to Frame 40 2 Close all the CH water isolating valves on the boiler inlet 3 To drain the...

Page 45: ...r and remove pipe Refer to Frame 57 5 The automatic air vent head is retained in the pump body with a bayonet connection The air vent head and float assembly is removed by turning the head anti clockw...

Page 46: ...ock clear of the boiler 8 Unscrew the rear cartridge connection 9 Fit the new valve mechanism ensuring the correct fit of the pin 10 Reassemble in reverse order 11 Refill the boiler 12 Check operation...

Page 47: ...iler Refer to Frames 29 30 6 4 64 DHW Filter DHW Flow Regula tor Cleaning Replacement DHW Filter 1 Refer to Frame 40 2 Isolate the mains cold water supply to the boiler 3 Drain the boiler DHW circuit...

Page 48: ...8 8 Remove the expansion vessel Refer to Frame 67 9 Remove the flow thermistor Refer to Frame 65 10 Remove the 2 M5 screws retaining the gas valve mounting bracket and transfer bracket to the new heat...

Page 49: ...k pressure to 0 75 bar 4 Re assemble in reverse order 5 Check operation of the boiler Refer to Frames 29 30 REPLACEMENT 6 Refer to Frame 40 7 Drain the boiler CH circuit Refer to Frame 55 8 Unscrew th...

Page 50: ...associated harness for continuity visual condition and position Refer to Frame 45 Are these functioning correctly NO Check siphon and condensate drain pipe work for blockage and rectify if necessary...

Page 51: ...integrity of internal boiler wiring RESET PROCEDURE To reset boiler turn mode knob to reset position and immediately turn knob back to required setting 71 aLTERNA TING L AND 5 5 resets within 15 mins...

Page 52: ...ectly yes Check siphon and condensate drain pipe work for blockage and rectify if necessary Boiler now working OK Check wiring from gas valve to PCB for continuity If the wiring is OK then replace the...

Page 53: ...wires to the outside sensor Check the resistance using a suitable multimeter connected across the Outside Sensor s terminal pins At 0 o C expect 31 000 35 000 Ohms At 15 o C expect 15 000 16 500 Ohms...

Page 54: ...the Flow Thermistor no 79 aLTERNA TING F AND 9 PCB Fault Replace PCB Ensure that the BCC boiler chip card small plastic part is fitted to the PCB otherwise replace PCB 81 aLTERNA TING c AND 2 BCC faul...

Page 55: ...ion yes no Move the mode knob to the Winter position Are the Timer and the Room Thermostat switched on yes no Switch the Timer and Room Thermostat On Are the Radiator Valves Open yes no Open the Radia...

Page 56: ...ame 2 Is the wiring between the PCB and the diverter valve motor connected yes yes Check diverter head fully engaged and clip secured onto waterset yes Is diverter stuck in the CH position yes Check a...

Page 57: ...ehensive spares parts information and details of approved Ideal Parts Distributors are available on www idealparts com Our Parts team are also available to help with your Ideal Spare Parts enquiries o...

Page 58: ...nt Combi Installation and Servicing U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d B D 8 9 H Q 0 1 2 7 4 4 8 8 3 8 8 w w w h e a t i n g s p a r e s...

Page 59: ...guarantee the boiler needs to be registered with the manufacturer within one month of the installation To maintain the boiler guarantee it is essential that the boiler is serviced annually by a Gas S...

Page 60: ...as BOILER sysTEM COMMIssIONINg ChECKLIsT CONTROLs Programmable room thermostat Optimum start control Combination Boiler Fitted Fitted Fitted Automatic bypass to system Fitted Boiler interlock aLL sysT...

Page 61: ...VICE RECORD sERVICE 01 aND Where Possible aND Signature sERVICE 02 aND Where Possible aND Signature sERVICE 03 aND Where Possible aND Signature sERVICE 04 aND Where Possible aND Signature sERVICE 05 a...

Page 62: ...the correct type as specified by BS 7967 Prior to its use the ECGA should have been maintained and calibrated as specified by the manufacturer The installer must have the relevant competence for use o...

Page 63: ...that no seals e g Those on flue extensions have been displaced during installation Rectify if necessary Turn off appliance and call Ideal Technical helpline for advice The appliance must not be commi...

Page 64: ...domestic commercial and industrial heating installers engineers and system specifiers For details of courses please ring 01482 498 432 Manufactured under an ISO 9001 registered quality management sys...

Page 65: ...and performance specification that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For installation guide see reverse of book U n i t 3 A T h o r n t o...

Page 66: ...bove regulations In IE the installation must be carried out by a Registered Gas Installer RGII and installed in accordance with the current edition of I S 813 Domestic Gas Installations the current Bu...

Page 67: ...to a maximum of 80o C adjustable via the CH temperature control C The Independent Combi is a high efficiency combination boiler which is most efficient when operating in condensing mode The boiler wil...

Page 68: ...rom a watering can or similar DO NOT use boiling water 3 Caution when using warm water as this may freeze and cause other localised hazards 4 Once the blockage is removed and the condensate can flow f...

Page 69: ...ING SWITCHING TIMES Set tappets to outer edge for ON periods and set tappets to inner edge for OFF periods The example shown has been set with 2 on periods ON at 9 00am OFF at 1 00pm 13 hours ON at 6...

Page 70: ...and adjust if necessary Check the timer is in an ON position and the room thermostat is turned up NO HOT WATER OR CENTRAL HEA TING Check the fused spur is turned on and ensure switch mode control knob...

Page 71: ...e boiler has a call for hot water but the appliance has reached the desired temperature set on the boiler The boiler is operating in central heating mode The boiler is operating in pre heat mode The b...

Page 72: ...sure gauge If the boiler fails to operate then please contact Ideal if under warranty or alternatively a Gas Safe Registered Engineer if outside of the warranty period In IE contact a Registered Gas I...

Reviews: