background image

Page 26

TERMS AND CONDITIONS

Ideal Unvented Cylinder Warranty Terms and Conditions

Ideal Boilers Limited provides a 2 year parts and labour warranty on the cylinder solution provided, the inner cylinder skin is further covered for 

on a replacement basis beyond this period to 25 years from the date of purchase, subject to adherence with the following terms and conditions of 

warranty 

1. 

The unit has been installed and commissioned in accordance with our installation and service instructions and all relevant codes of practice 

and regulations in force at the time of installation.

2. 

All necessary inlet controls and safety valves have been fitted correctly.

3. 

The unit has only been used for the storage of potable water supplied from the public mains. The water quality shall be in accordance with

4. 

European Council Directive 98/83 EC, or revised version at the date of installation, and is not fed with water from a private supply. Particular:

 

Chloride content:  

Max. 200 mg/l

 

Sulphate content:  

Max. 200 mg/l

 

Combination chloride/sulphate:   Max. 300 mg/l (in total)

5. 

If the newly fitted water heater is not in regular use then it must be flushed through with fresh water for at least 15 minutes. Open at least 

one hot water tap once per week, during a period of at least 4 weeks.

6. 

The Cylinder is registered within 30 days of installation, this can be done by calling Ideal Boilers on 

01482 498660

7. 

The unit has been regularly maintained as detailed in the installation and service instructions

8. 

If the Cylinder suffers a mechanical breakdown, calls must be raised with Ideal Boilers Customer Services on 

01482 498660

 

Our normal working times, excluding Bank Holidays are:

 

8am – 6pm Monday to Friday, 8am – 4pm Saturday,

 

8.00am – 12 noon Sunday

9. 

The guarantee for the stainless steel vessel is for twenty five years against material defect or manufacturing faults if the original unit is 

returned to us AND PROVIDED THAT:

 

 

(i)   It has not been modified, other than by Ideal.

 

 

(ii)   It has not been subjected to wrong or improper use or left uncared for.

 

 

(iii)  It has only been used for the storage of potable water supplied from the public mains, max 200mg/litre chloride.

 

 

(iv)  It has not been subjected to frost damage.

 

 

(v)   The benchmark service record is completed after each annual service.

 

 

(vi)  The unit has been serviced annually 

10. 

If the stainless steel vessel proves to be defective either in materials or workmanship we reserve the right to either repair or supply 

replacements or the closest possible substitute in the case of any obsolete product and will collect and deliver to any address in England, 

Scotland and Wales (excluding all islands):

 

Our normal working times, excluding Bank Holidays are:

 

8am – 6pm Monday to Friday, 8am – 4pm Saturday,

 

8.00am – 12 noon Sunday

 

Please note:

a.  Engineers will only attend to Ideal products where it is considered by the engineer that the installation does not pose a risk to 

health and safety.

b.  A permanently fixed access ladder must service installations in lofts or attics. Adequate lighting and permanently fixed flooring 

must also be available.

c.  Compartment installations must provide minimum working clearances as detailed in the installation instructions. Ideal will not 

accept responsibility for the removal of fixtures or fittings in order to gain access for repairs.

11.  

The guarantee does not apply:

a.   If the Cylinder is removed from its place of installation without our prior consent.

b.   To any defect, damage or breakdown caused by inadequate servicing of the cylinder or by deliberate action, accident, misuse or 

third party interference including modification or an attempted repair which does not fully comply with industry standards.

c.   To any defect, damage or breakdown caused by the design, installation and maintenance of the central heating system.

d.   To de-scaling or other work required as a result of hard water scale deposits or from damage caused by aggressive water or 

sludge resulting from corrosion. 

e.   If the claim/contact procedure set out in section 12 is not adhered to

f.   To any other costs or expenses caused by or arising as a result of the breakdown of an Ideal Cylinder.

g.   To any defect resulting from the incorrect installation of the cylinder.

h.   To any costs incurred during delays in fixing reported faults.

12.  

We reserve the right to charge a call-out fee where:

a.   A fault cannot be found.

b.   The breakdown or fault has been caused by an event, which is excluded from the guarantee – refer to section 11

c.   Failure to cancel an agreed appointment prior to our engineers visit

d.   The Cylinder is outside the period of guarantee or the conditions of the guarantee have not been met.

13.  

If we fit replacement parts or replace a cylinder it will not extend the period of the warranty. All replaced parts or cylinders will become the 

property of Ideal Boilers Ltd.

14.  

The warranty applies only where an Ideal cylinder has been installed in a domestic dwelling in mainland United Kingdom, Northern Ireland 

and I.O.W. to provide hot water.

Our Ideal Warranty is offered in addition to the rights provided to a consumer by law. Details of these rights can be obtained from a Trading Standards 

Authority or a Citizen Advice Bureaux. Guarantor – Ideal Boilers Ltd, P.O. Box 103, National Avenue, Hull, HU5 4JN.

TERMS AND CONDITIONS

Summary of Contents for HP180IND

Page 1: ...ts that have not been clearly authorised by Ideal Boilers For the very latest copy of literature for specification and maintenance practices visit our website www idealboilers com where you can downlo...

Page 2: ...heir safety Children should be supervised at all times to ensure they do not play with the appliance This information is provided to assist generally in the selection of equipment Responsibility for s...

Page 3: ...Valve 6 bar Opening temperature of P T Relief Valve 95 C Energy cut out thermostat setting 85 C Max working pressure Heat pump heat exchanger 3 bar Immersion heater rating 3kW 240V AC All cylinders a...

Page 4: ...46 43 291 47 334 Pressure regulating valve setting bar 3 3 3 3 Expansion relief valve setting bar 4 5 4 5 4 5 4 5 Temperature setting P T valve C 95 95 95 95 Pressure setting P T valve bar 6 6 6 6 Exp...

Page 5: ...IH litres 166 186 Weight empty full kg 38 219 40 237 Pressure regulating valve setting bar 3 3 Expansion relief valve setting bar 4 5 4 5 Temperature setting P T valve C 95 95 Pressure setting P T val...

Page 6: ...Primary return 28mm plain pipe 7 Cold feed 22mm compression 8 Immersion heater 1 BSP 3kW 9 Overheat stat Part G3 loose components supplied in a separate box A Combination inlet group incorporating pr...

Page 7: ...urn 28mm 7 Primary flow 28mm 8 Overheat stat 9 HP control thermostat Part G3 loose components supplied in a separate box A Combination inlet group incorporating pressure reducing valve strainer check...

Page 8: ...rate is higher than that of plain tube coil Thecylinderhasbeenspecificallydesignedforheatpumpapplications Itincorporates animmersionheateratthebaseoftheunitwhichenablespasteurisationofthewater This sh...

Page 9: ...ders are coupled together the secondary inlet and outlet pipes must be balanced The units must be fitted on the same level Note No valves must be fitted between the expansion vessel and the storage cy...

Page 10: ...ing the hot water cylinder please use MCS guidelines in MIS3005 and also refer to BS EN 806 1 5 AND BS EN 8558 Ideal HP and HP Slimline Model Selection Guide Dwelling type Suggested model Number of be...

Page 11: ...m s in 42mm 0 10 0 15 0 20 0 25 0 30 0 35 0 40 0 45 0 50 0 55 0 60 0 65 0 70 0 75 0 80 0 85 3 Operating power of heat exchanger suitable for cylinder based on a 5 degree temperature difference kW 5K...

Page 12: ...eofshowermixingvalve can be used as long as both the hot and cold supplies are mains fed However all mains pressure systems are subject to dynamic changes particularly when other hot and cold taps sho...

Page 13: ...he discharge be of metal and a Be at least one pipe size larger than the nominaloutletsizeofthesafetydeviceunless its total equivalent hydraulic resistance exceeds that of a straight pipe 9m long i e...

Page 14: ...rsareused AllpartsareavailabletoapprovedinstallersfromIdealBoilers Combination Inlet Group Combines elements 1 2 and 3 below 1 PressureReducingValve Thecoldwatersupplytoanymixertaps showersmustbetaken...

Page 15: ...s electricity supply at the fuse spur unit INSTALLATION INSTALLATION The immersion heater thermostats incorporate a manual reset safety overheat cut out thermostat Should this operate investigate the...

Page 16: ...4 the following should also be taken into account during the design and installation phase The heat pumps normally operate at lower flow temperatures typically 45 55 C compared with 75 80 C for the bo...

Page 17: ...ss ATL option Cable 3 x 0 5 mm Electrical backup power supply see heat pump manual General power supply see heat pump manual Electrical Board or or or or 1 2 3 L N X11 EX3 Commun Ferm Ouvert X15 X86 X...

Page 18: ...the disinfection procedure Damage caused through a failure to do this adequately will not be covered by the warranty For the above reasons we recommend the use of a non chlorine dased disinfectant su...

Page 19: ...mperature and expansion relief valves are free from obstruction and blockage and are not passing any water 5 Check the condition and if necessary descale the heat exchangers in hard water areas 6 Chec...

Page 20: ...at source is electrical ensure that the immersion heaters are isolated from the mains before re setting the energy cut out If the immersion heater s need replacing this should be done with the units s...

Page 21: ...re set at 45 C 50 C Has high limit cut out Re set END YES YES YES YES YES YES YES NO NO NO NO NO NO NO FAULT Poor Water Flow at Hot Taps Water service check by supply company required Clean or replace...

Page 22: ...ERV TPRV Replace PRV END START Is pressure downstream of pressure reducing valve correct Is valve seal and seat clean undamaged Is heater operating at less than 60 C Re set temperature NO YES YES NO...

Page 23: ...n 1 180996 3 Lift up pressure and temperature relief valve 6 bar 95 C 1 180999 4 Inlet group set at 3 bar c w expansion relief valve set at 4 5 bar 1 176750 5 18 litre expansion vessel 1 176752 6 24 l...

Page 24: ...tourbridge West Midlands DY8 1PA TELEPHONE 01384 442611 FAX 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated...

Page 25: ...lead for team lifts As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware of the we...

Page 26: ...uct and will collect and deliver to any address in England Scotland and Wales excluding all islands Our normal working times excluding Bank Holidays are 8am 6pm Monday to Friday 8am 4pm Saturday 8 00a...

Page 27: ...Page 27 NOTES...

Page 28: ...te will then be issued to the customer Heating and Hotwater Industry Council HHIC www centralheating co uk demonstrating compliance with the appropriate Building Regulations and then handed to the cus...

Page 29: ...me Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date...

Page 30: ...issioning servicing of central heating systems Ideal Boilers Ltd PO Box 103 National Avenue Kingston Upon Hull HU5 4JN Tel 01482 492251 Fax 01482 448858 Registration No London 322 137 Ideal Technical...

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ...the system stabilises This is quite normal with these types of systems and does not indicate a fault In some areas the water will initially appear cloudy but will quickly clear when left to stand This...

Page 35: ...HEAT PUMP CYLINDER USER GUIDE USER GUIDE...

Page 36: ...n clearly authorised by Ideal Boilers For the very latest copy of literature for specification and maintenance practices visit our website www idealboilers com where you can download the relevant info...

Reviews: