background image

8

Harrier GTS - 

Installation & Servicing

GENERAL

7

SEALED (PRESSURISED) SYSTEMS

6

OPEN VENTED SYSTEM REQUIREMENTS - minimum static head requirements

The Harrier GTS boiler has a minimum static head requirement of
5.0 metres (16.5 feet approx.) depending on the particular
characteristics of the system design (see diagram).  The
information provided is based on the following assumptions.

1.

An open vent/safety pipe connection is made immediately after
the flow connection.

2.

A cold feed/expansion pipe connection is made to the system
return pipe within 0.75m of the boiler return connection.

3.

The maximum flow rate through the boiler is based on a
temperature difference of 11

o

C (20

o

F) at full boiler output with

the circulating pump positioned in the flow of the system.

4.

The boiler is at the highest point of the system.  Systems
designed to rise above the flow connections will, of course,
automatically require a minimum static head higher than
shown.

5.

The position of the open vent/safety pipe above the expansion
cistern water level is given as a guide only.  The final position
will depend upon particular characteristics of the system.
Pumping over of water into the expansion cistern should
be avoided.

6.

Both open vent/safety pipe and cold feed/expansion
pipes must be of adequate diameter to suit the output of
the boiler (see table below).

Working pressure 6 bar maximum.

Particular reference should be made to BS. 6644: Section 2;

Subsection 11 and Guidance note PM5 "Automatically

controlled steam and hot water boilers" published by the

Health and Safety Executive.
The information and guidance given below is not intended to

override any requirements of either of the above publications

or the requirements of the local authority, gas or water

undertakings.
In general commercial closed pressurised systems are

provided with either manual or automatic water make up.
In both instances it will be necessary to fit automatic controls

intended to protect the boiler, circulating system and ancillary

equipment by shutting down the boiler plant if a potentially

hazardous situation should arise.
Examples of such situations are low water level and operating

pressure or excessive pressure within the system.

Depending on circumstances, controls will need to be either

manual or automatic reset.  In the event of a shutdown both

visual and audible alarms may be necessary.

Open vent
safety pipe

750mm

Cold feed/
expansion pipe

H = 5.0m

To
pump

Pressure

relief

valve

FLOW 

RETURN 

Shunt pump
(if required) 

Note: Height, H, MUST be
increased if necessary to
comply with the min.
head required by the
pump manufacturer

BOILER

This diagram does not show safety valves & water
flow switches etc necessary for safe operation 

Expansion

cistern

har7404

Expansion vessels used must comply with BS. 4814 and must

be sized on the basis of the total system volume and initial

charge pressure.
Initial minimum charge pressure should not be less than 0.5

bar (7.2psi) and must take account of the static head and

specification of the pressurising equipment.  The maximum

water temperatures permissible at the point of minimum

pressure in the system are specified in Guidance Note PM5.
When make up water is not provided automatically it will be

necessary to fit controls which shut down the plant in the event

of the maximum system pressure approaching to within

0.35bar (5psi) of the safety valve setting.
Other British Standards applicable to commercial sealed

systems are:
BS. 6880: Part 2
BS. 1212
BS. 6281: Part 1
BS. 6282: Part 1
BS. 6283: Part 4

8

SYSTEM DESIGN

Minimum Water Flow
Design Flow Rates

The following table gives the flow rate required for each boiler
based on a design temperature difference of 11

o

C (20

o

F) at the

maximum rated output.  For hydraulic resistance see

Performance Data table (page 2).

Minimum Flow Rates

It may be necessary to fit a shunt pump to ensure minimum

flow rates.

Boiler Output kW

Open Vent (mm)

Cold Feed (mm)

60 to 150

32

25

151 to 300

38

32

301 to 600

50

38

Boiler Size

GTS 5

GTS 6

GTS 7

GTS 8

GTS 9

Normal water flow rate

l/s

3.04

3.91

5.00

6.08

7.17

temperature difference 11

o

C (20

o

F) g.p.m.

40.1

51.6

66.0

80.2

94.6

Minimum water flow rate

l/s

0.96

1.23

1.57

1.91

2.25

temperature difference 35

o

C (63

o

F) g.p.m.

12.7

16.2

20.7

25.2

29.7

Summary of Contents for Harrier GTS 5

Page 1: ...part on this appliance use only spare parts that you can be assured conform to the safety and performance specification that we require Do not use reconditioned or copy parts that have not been clear...

Page 2: ...rs etc are directly connected to these appliances unless covered by these Installation and Servicing Instructions or as otherwise recommended by Ideal Stelrad Group in writing If in doubt please enqui...

Page 3: ...TS boilers are a range of cast iron sectional pressure jet boilers offering high efficiency operation ease of maintenance fuel flexibility and low emissions Suitable for oil or gas operation the Harri...

Page 4: ...4 Test code for heating boilers for atomizing oil burners 73 23 EEC Low voltage directive Relevant standard is EN60335 1 89 336 EEC Electromagnetic Compatibility Directive Relevant standards are EN500...

Page 5: ...e boiler body or even premature boiler failure Corrosion and the formation of black iron oxide sludge will ultimately result in premature radiator failure Open vented systems are not completely sealed...

Page 6: ...okehood cleanout doors and any safety or control devices Sides One side may be 100mm the other side must be 200mm plus the burner projection or 500mm whichever is the greater to allow the burner door...

Page 7: ...dvice of the gas supplier should be obtained The temperature within a boiler room shall not exceed 25o C within 100 mm of the floor 32o C at mid height and 40o C within 100 mm of the ceiling Filling s...

Page 8: ...ng down the boiler plant if a potentially hazardous situation should arise Examples of such situations are low water level and operating pressure or excessive pressure within the system Depending on c...

Page 9: ...2 Heating return 3 3 bar safety valve and pressure gauge 4 Flow switch if necessary 5 Air separator 6 Automatic venting valve 7 Valve 8 Shunt pump required for all models 9 Expansion tank 10 Draining...

Page 10: ...es for GAS fired appliances are quoted in BS 6644 and IGE UP 10 whilst BS 5410 Pt 1 similarly applies to OIL fired boilers The table below contains the minimum dimensions of the flue required for each...

Page 11: ...ckages which make up the boiler The packages are listed in the order in which they are opened for assembly Tools required not supplied Phillips head screwdriver Wide flat screwdriver 13 and 17mm spann...

Page 12: ...into the slots in the side components 15 FITTING THE BASE FRAME INSULATION 1 Locate the insulation between the sides and end with the black fabric on the underside 2 2 fal5982 1 1 2 2 har5983 2 Assem...

Page 13: ...ough the rear section 4 Pass the rods through the rear section and secure both ends with the 4 washers and M12 nuts This may be conducted after preparing the section Frame 17 and fitting thermocord Fr...

Page 14: ...to the groove 3 Cut it to the correct length 4 Repeat for intermediate sections 19 ASSEMBLING THE INTERMEDIATE SECTIONS 1 Place the first intermediate section onto the base frame 2 Fit the connections...

Page 15: ...15 Harrier GTS Installation Servicing INSTALLATION 20 ASSEMBLING THE INTERMEDIATE SECTIONS CONT D Proceed likewise for other intermediate sections A 20 cm har5993 1 3 2 4 5 6 8 7 INSTALLATION...

Page 16: ...any surplus silicone 6 Remove the assembly tool 7 Level the boiler by adjusting its feet 22 PREPARATION FOR FITTING THE FLUE CLEANOUT AND BURNER DOORS FOR RH OPENING 1 Screw in and tighten all the stu...

Page 17: ...evenly with four M12 nuts and washers 3 Position the flue cleanout door hinge bracket as shown and secure with two M12 nut and washers Note For left hand opening position the hinge bracket on the left...

Page 18: ...or models GTS 7 GTS 8 and GTS 9 will contain two sizes of baffle Use only the 570 mm long ones and discard the shorter ones 4 In all cases the baffles should be pushed in to be flush with the front ha...

Page 19: ...ug 2 Screw the threaded bush with the sensor pocket into the upper connection and the plug into the lower connection har7001 1 2 2 27 FITTING THE SMOKEHOOD 1 Screw the four M8 studs into the rear sect...

Page 20: ...d and tapped connections of the sections pipes and drain cock with thread sealing tape or compound not supplied 2 Screw the flow and return pipes and the drain cock into the rear section Ensure the ta...

Page 21: ...nlet valve 6 Close the vent valve 7 Disconnect the supply water 8 Connect the pressure system water 9 Open the fill valve 10 Pressurise the boiler Maintain pressure for at least 30 minutes Any drop in...

Page 22: ...the sides and tuck underneath 2 Models GTS 8 and GTS 9 After fitting the front insulation similarly place the rear section 3 Secure the two sections together using the clips provided 4 All Models Pla...

Page 23: ...oof washers and nuts Note the direction of the crossbar to ensure the edge clips fit from the front 32 INSTALLING THE MAINS AND SENSOR CABLE TRAYS 1 Slide the trays into the casing crossbar supports 2...

Page 24: ...bottom onto the base frame 2 Raise the panel to its vertical position and lift over the crossbar supports 3 Secure the top edge to the front crossbar support using M8 bolts and shakeproof washers by s...

Page 25: ...with two self tapping screws and shakeproof washers Note If a pressure relief valve has already been fitted in the flow connector or if the panel is being replaced on a completed installation the top...

Page 26: ...left hand opening in the top front panel 2 Route the burner leads through the same opening in the top front panel 3 Lower the control panel onto the location buttons nearer the front and slide the con...

Page 27: ...s RH side shown for clarity 2 Insert the sensors into the sensor pocket 3 Loop the sensor leads back over the sensor pocket 4 Secure the leads with the spring clip har9090 1 4 2 3 1 39 ASSEMBLING THE...

Page 28: ...de the panel forwards 2 Secure the panel at the two top rear corners with two self tapping screws and shakeproof washers 1 2 2 1 har9093 42 NAMEPLATE AND LEVELLING 1 Affix the identification plate sup...

Page 29: ...uctions The electrical connection must comply with standards in force The equipment must be powered by a circuit containing a remote double pole switch with opening 3mm WARNING The boiler must be eart...

Page 30: ...larm Indicator System 1 The unused insulated terminal on the safety thermostat may be used to connect an alarm signal This terminal becomes live if the safety thermostat trips 2 Remove the insulation...

Page 31: ...stage 1 of two stage burners 4 pin plug for stage 2 of the burner Terminal block for connecting to the control panel Note If the electrical characteristics of the burner exceed the following values st...

Page 32: ...r Thermostats Adjustment range 30 90o C For ON OFF burners use 1st stage thermostat only For two stage burners set 2nd stage 5o C below 1st stage setting 4 Boiler Thermometer 5 Location for Flue Gas T...

Page 33: ...specific operating features 10 Set the boiler thermostats 3 to the appropriate settings ensuring the second stage is 5o C lower than the first stage if a 2 stage burner is fitted 54 GENERAL CHECKS Ma...

Page 34: ...sconnect the cable and supply pipe to the burner 5 Open the combustion chamber and flue way doors by removing the 8 nuts 6 Remove the flue way baffles 7 Thoroughly clean the flue ways and baffles 8 Re...

Page 35: ...e system hot examine all water connections for soundness Check the gas rate and measure the combustion CO CO2 content Complete the boiler log book Carry out functional checks as appropriate 60 SERVICI...

Page 36: ...uing improvement in the design and performance of its products The right is therefore reserved to vary specification without notice The Ideal Boilers Technical Training Centre offers a series of first...

Reviews: