5
Installation and Servicing
Section 1 - General
...............................................................................
6
1.1
Introduction
.............................................................................
8
1.2
Operation
................................................................................
8
1.3
Safe Handling
.........................................................................
8
1.4
Optional Accessories
..............................................................
8
1.5
Safety
......................................................................................
8
1.6
Safe Handling of Substances
.................................................
9
1.7
Location of Boiler
...................................................................
9
1.8
Air Supply
...............................................................................
9
1.9
Gas Supply
...........................................................................
10
1.10 Water Circulation System
.....................................................
10
1.11
Boiler Controls
......................................................................
10
1.12 Electrical Supply
...................................................................
10
1.13 Condensate Drain
.................................................................
10
1.14 Boiler Dimensions, Services & Clearances
..........................
11
1.15 Open Vent System Requirements
........................................
12
1.16 Schematic Pipework and System Balancing
........................
12
1.17 Low Head and Large Systems with Extensive Pipe Runs -
.....
Open Vent
.............................................................................
13
1.18
Sealed System Requirements
..............................................
13
1.19 Sealed System Requirements - Cont.
..................................
14
1.20 System Balancing
.................................................................
15
1.21 Water Treatment
...................................................................
15
Section 2 - Installation
........................................................................
16
2.1
Boiler Assembly - Exploded View
.........................................
16
2.2
Unpacking
.............................................................................
17
2.3
Wall Mounting Template
........................................................
18
2.4
Preparing the Wall
................................................................
18
2.5
Fitting the Wall Mounting Plate
.............................................
18
2.6
Mounting the Boiler
..............................................................
18
2.7
Flues and Locations
..............................................................
19
2.8
Flues and Locations - Cont
...................................................
20
2.9
Horizontal Flue Positions
.....................................................
21
2.10 Vertical Flue Positions
.........................................................
21
2.11
Flue System Dimensions
.....................................................22
2.12 Fitting the Turret
....................................................................22
2.13 Cutting the Flue
....................................................................23
2.14 Assembling the Vertical Flue
................................................24
2.15 Rear Flue Outlet Kit (55/80) Assembly -
...................................
Exploded View
......................................................................25
2.16 Terminal Wall Seal Assembly / Positioning
...........................25
2.17 Setting the rear flue length -
....................................................
Wall Thickness of 115 mm to 442 mm
.................................25
2.18 Fitting the Wall Plate / Rear Flue Terminal Assembly
...........
26
2.19 Mounting the Boiler - Rear Flue Outlet Kit (55/80)
................
26
2.20 Condensate Drain
.................................................................
27
2.21 Condensate Drain - Cont’d
...................................................
28
2.22 Connections ..........................................................................
29
2.23 Electrical Connections ..........................................................
29
2.24 Installer Wiring
......................................................................
29
2.25 Installer Wiring - Continued
..................................................
30
2.26 Installer Wiring - Cont
...........................................................
31
2.27 Pump Overrun - Install
..........................................................
31
2.28 Wiring Diagram
.....................................................................32
2.29 Commissioning and Testing
..................................................33
2.30 Initial Lighting
........................................................................34
2.31 The Display
...........................................................................35
2.32 General Checks
....................................................................35
2.33 General Checks Cont. - Water Circulation
............................
36
2.34 Restart Procedure
.................................................................
36
2.35 Accessing the Installer Mode
................................................
37
2.36 Handing Over
........................................................................
37
Section 3 - Servicing
...........................................................................
38
3.1
Servicing Schedule
...............................................................
38
3.2
Removal / Replacement of Components
..............................
39
3.3
Draining the Boiler
................................................................
39
3.4
Boiler Front Panel Removal / Replacement
..........................
40
3.5
Flue Manifold Removal/Replacement
...................................
40
3.6
Fan and Venturi Assembly Removal and Cleaning
...............
41
3.7
Burner Removal and Cleaning
..............................................42
3.8
Cleaning the Heat Exchanger
...............................................42
3.9
Ignition / Detection Electrode Replacement / Inspection
......43
3.10 Cleaning the Condensate Trap
.............................................43
3.11
Flow & Return Thermistor Replacement
...............................44
3.12 Burner Injector Replacement
................................................44
3.13 Burner Replacement
.............................................................44
3.14 Spark Generator Replacement
.............................................45
3.15 Gas Control Valve Replacement
...........................................45
3.16 Condensate Trap Replacement / Cleaning
...........................
46
3.17 Flow Switch Replacement
....................................................
46
3.18 Primary PCB Replacement
...................................................
46
3.19 Heat Engine Replacement
....................................................
47
Section 4 - Fault Finding
.....................................................................
48
4.1
Fault Finding Main Menu
......................................................
48
4.2
‘L 01’ - Overheat Lockout
......................................................
49
4.3
‘L 02’ - IGNITION Lockout
.....................................................
49
4.4
‘L 06’ - Flame On Before Gas Valve On
................................
50
4.5
‘F 02 or FN or LN’ - Flame Loss
............................................
50
4.6
‘F 03’ - Fan Fault
...................................................................
51
4.8
Flow/Return Reversed
..........................................................
51
4.7
F 04 or L 04’ - Flow Thermistor Fault
...................................
51
4.9
‘F 05 or L 05’ - Return Thermistor Fault
...............................52
4.10 ‘F 06’ - Outside Sensor Fault
................................................52
4.11
No CH Operation
..................................................................53
4.12 No Display
............................................................................54
4.13 No DHW Operation
...............................................................54
4.14 Flow/Return Differential Greater than 50°C
..........................54
Section 5 - Spare Parts
......................................................................55
Section 6 - Benchmark & Commissioning
..........................................
56
CONTENTS