56
Installation and Servicing
SECTION 3 - SERVICING
3.17 SPARK GENERATOR REPLACEMENT
3.18 GAS CONTROL VALVE REPLACEMENT
1. Refer to Sections 3.2 & 3.3.
2. Disconnect the leads from the spark
generator.
3. Remove spark generator by pulling
forwards to release the retaining clip,
then push back to release the second
retaining clip.
4. Fit the new spark generator and re-
assemble in reverse order ensuring that
the the earth lead is replaced.
5. Check the operation of the boiler. Refer
to Sections 2.24 to 2.27.
1. Refer to Sections 3.2 & 3.3.
2. Remove the gas inlet pipe. Refer to Section 3.4.
3. Unplug the electrical connection.
4. Disconnect the gas service cock, refer to Section
2.25.
5. Remove the 2 securing screws in the underside
of the boiler casing and remove the valve.
6. Remove brass injector from gas valve outlet and
re-fit into replacement valve.
7. Replace in reverse order ensuring all seals are in
good condition and the assembly is gas sound.
8. Ensure all gas valve connections are gas tight
with a gas soundness check up to the gas control
valve.
9. Check the operation of the boiler. Refer to Sections
2.24 to 2.27.
6
SER
VICING
Summary of Contents for VOGUE COMBI GEN2 C26
Page 4: ...4 Installation and Servicing...
Page 6: ...6 Installation and Servicing...
Page 74: ......