![Ideal Boilers Mexico Super CF 3/40 Installation & Servicing Manual Download Page 9](http://html.mh-extra.com/html/ideal-boilers/mexico-super-cf-3-40/mexico-super-cf-3-40_installation-and-servicing-manual_617028009.webp)
9
Mexico Super CF 3/40 - 3/80 -
Installation
INSTALLATION
3 BOILER ASSEMBLY - Exploded View
LEGEND
1.
Heat exchanger assy.
2.
End section.
3.
Middle section.
4.
Section alignment rings
and 'O' rings.
5.
Thermostat pocket.
6.
Distributor tube.
7.
Combustion chamber.
11.
Collector hood.
12.
Cleanout cover.
13.
Front plate assy.
21.
Gas valve.
23.
Piezo igniter.
27.
Gas cock.
33.
Phial retaining clip.
34.
Split pin.
45.
Flue baffle.
46.
Boiler base plate.
48.
Draught diverter back panel assembly
49.
TTB downdraught thermostat & bracket.
50.
Heat shield.
INST
ALLA
TION
Summary of Contents for Mexico Super CF 3/40
Page 1: ......