14
Installation and Servicing
SECTION 1 - GENERAL
395
308
43.5
50
2.5
29
76
2.5
from case
52
700
122
108
165
29
Side flue
dim. A
Flue
Terminal
(60/100)
Alternative
Rear
Flue
Outlet
(55/80)
Gas Connection Copper Pipe En
d
Condenste Drain
Gas Inlet
Condensate Connection and Gas Connection
DA
TA
PL
AT
E
CH
Flow
CH
RTN
1.16 BOILER DIMENSIONS, SERVICES & CLEARANCES
all dimensions in mm
The boiler connections are made on the boiler connection tails.
Refer to Section 2.20.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending upon
site conditions.
Side and Rear Flue
a.
Provided that the flue hole is cut accurately, e.g. with a core
drill, the flue can be installed from inside the building where
wall thicknesses do not exceed 600mm. Where the space
into which the boiler is going to be installed is less than
the length of flue required the flue must be fitted from the
outside.
Installation from inside ONLY
b.
If a core boring tool is to be used inside the building the
space in which the boiler is to be installed must be at least
wide enough to accommodate the tool.
extensions
Front clearance
The minimum front clearance when built in to a
cupboard is 5mm from the cupboard door but
450mm overall clearance is still required, with
the cupboard door open, to allow for servicing.
*
Bottom clearance
Bottom clearance after installation can be
reduced to 5mm.
This must be obtained with an easily
removable panel to provide the 100mm
clearance required for servicing.
IMPORTANT
Please ensure there is
appropriate access to the system filter
for draining, cleaning and dosing. For
guidance please see Ideal System Filter
installation manual.
Summary of Contents for LOGIC MAX HEAT H 18
Page 4: ...4 Installation and Servicing...
Page 6: ...6 Installation and Servicing...
Page 61: ...61 NOTES Installation and Servicing...
Page 62: ...62 Installation and Servicing SECTION 5 SPARE PARTS...
Page 68: ...68 NOTES Installation and Servicing...