5
GENERAL
Classic
Slimline FF
-
Installation & Servicing
This appliance in NOT suitable for use in a direct
hot water system or for gravity circulation.
1
BOILER WATER CONNECTIONS
The following minimum
clearances must be maintained
for operation and servicing.
Additional space will be
required for installation,
depending upon site
conditions.
Side and Rear Flue
a. Provided that the flue hole is
cut accurately, e.g. with a
core drill, the flue can be
installed from inside the
building.
Installation from inside
ONLY
b. If a core boring tool is to be
used inside the building; the
space in which the boiler is
to be installed must be at
least wide enough to
accommodate the tool.
Pelmet restrictions.
If the ability to fit or remove the
casing during installation and
subsequent servicing is impaired
by pelmets etc. this operation can
be made easier by first removing
the controls pod casing in line
with the following instructions:
a. Release the controls pod
casing fixing screws (a) 3 full
turns only. Remove the pod by
pulling it forward to disengage
from the keyhole slots.
b. Undo the 2 screws (b)
retaining casing to the back
panel.
c. The casing can now be
removed in the direction of the
arrow, first lifting the casing
slightly to disengage the
casing top return from the
back panel. (For this purpose
a minimum clearance of
12mm is required between
the top of the boiler and
pelmet or other similar
obstruction.
Front clearance: 533mm (21")
from the front of the boiler
casing.
Minimum front clearance when
built behind a concealing panel
is 5mm (1/4") provided that the
top and bottom of the casing are
NOT enclosed.
2 BOILER CLEARANCES
Summary of Contents for Classic FF 360
Page 1: ......
Page 39: ...Classic Slimline FF Installation Servicing 39 NOTES...