CAUTION. 

 

To avoid the possibility of injury during the installation, servicing or cleaning of

this appliance care should be taken when handling edges of sheet steel components

All CORGI Registered Installers carry a CORGI ID card, and have a registration number.  Both should be recorded
in your Log Book. You can check your installer by calling CORGI direct on 0156 372 300.

INTRODUCTION

The 

Buccaneer GTE 

is a floor-standing boiler featuring full

sequence automatic gas or fuel oil burner.

SAFETY

It is essential that the instructions in this booklet are
strictly followed, for safe and economical operation of the
boiler.

FOR GAS FIRED BOILERS

Current Gas Safety (Installation & Use)
Regulations or rules in force.

In your own interest, and that of safety, it is the law that this
boiler must be installed and maintained by a CORGI registered
installer, in accordance with the above regulations.

The appliance should be serviced at least once a year by a
CORGI registered installer.

Electricity Supply

The appliance must be earthed.

Supply 230 V - 50 Hz.

This appliance is intended to be connected to the supply via a
double-pole switch, having a 3mm contact separation in both
poles, serving only the boiler and system controls.
Alternatively, a 3-pin UNSWITCHED socket may be used.

Important Notes

If the boiler is installed in a compartment then the
compartment MUST NOT be used for storage purposes.

Do not store objects around or on the boiler, and keep access
clear at all times.

Do not obstruct ventilation ducts, grilles or openings in the
boiler room, room space or compartment that the appliance is
installed in, or the passage of combustion and ventilation air
to the boiler.

Do not turn off the boiler if it is to be left unattended in frosty
weather.

If it is known or suspected that a fault exists on the boiler then
it MUST NOT BE USED until the fault has been corrected by a
recognised installer (CORGI registered for gas-fired boilers).

Flammable materials must not be placed in close proximity to
the appliance. Materials giving off flammable vapours must
not be stored in the same room as the appliance.

In cases of repeated or continuous shutdown, a recognised
installer (CORGI registered for gas-fired boilers) should be called
to investigate and rectify the condition causing this and carry out
an operational test after each intervention on the device. Only the
manufacturers original parts should be used for replacement.

Minimum Clearances

Clearances of 

500mm (20") 

at the rear,  

500mm (20")

 at the

sides and 

1000mm (40

") at the front of the boiler casing must be

allowed for servicing.

To Light the Boiler  

(Refer to Frame 1)

1.

CHECK THAT THE ELECTRICITY SUPPLY TO THE BOILER
IS OFF.

2.

Set the boiler on/off switch (1) to off.

3.

Set the boiler flow control (7) and DHW temperature control
(10) to maximum.

4.

Switch on the electricity supply to the boiler and check that all
external controls, e.g. programmer, room thermostat etc. are
on and the Summer/Winter switch (3) is set to Winter.

5.

Set the boiler on/off switch (1) to ON.

The boiler will commence the ignition sequence, supplying
heat to the system when required.

Note.

 

 If the burner does not ignite refer to the burner

instructions.

6.

Set the boiler flow control (7) and DHW temperature control
(10) (combination boilers or if optional DHW sensor fitted), to
the desired settings.

Settings below 4 (approx. 40

0

C) are not recommended, in

order to avoid the risk of combustion products condensing on
the walls of the boiler.

7. Burner

Refer to the instructions supplied with the burner for specific
control features.