ULTRA, UL180 & UL182 ARM INSTALLATION
ULTRA 180 & 182 ARM INSTALLATION - rev 11/22/17
Page 4 of 4
Ultra Arm Cable Management
Adjusting Rotation Limits
Adjusting Arm Tension
ADJUST ARM TENSION
Using the 3/16” T-handle
hex wrench provided, turn
the screw in the UL180/182
arm clockwise to lighten
the arm’s load resistance,
or counter-clockwise
to increase the load
resistance. The arm
must be horizontal
before adjusting.
IMPORTANT
Extend the UL180 or UL182 straight out and be
sure all equipment is mounted on the arm before
adjusting the arm’s resistance. Use the T-handle
provided to adjust the arms’ resistance. Do not
use power tools to adjust.
DO NOT ADJUST THE ARM TO SUPPORT
MORE THAN 32 LBS. DOING SO MAY
DAMAGE THE ARM.
Adjusting
rotation limits
for the standard
Ultra Arm
Place Stop Pins
as shown. The
Stop Pin is built into
the arm rather than
into the wall ear.
ULTRA CABLE MANAGEMENT
•
Prepare all cables to route within the arm by placing them
near cavity of arm and bundling together if necessary.
•
Remove cover by unscrewing four Phillips head cap screws.
Screws are captured by the cover so they cannot fall out.
Once screws are disengaged, pull cover out of arm.
•
Place cables within the channel. Do not block the holes
where screws will engage in arm.
•
Replace cover and tighten screws. Cables should be
able to pull through to desired position if necessary.