![ICP NOLF105A12D Installation Instructions Manual Download Page 18](http://html1.mh-extra.com/html/icp/nolf105a12d/nolf105a12d_installation-instructions-manual_613890018.webp)
FIGURE 4
1
“FAN OFF” Limit
90
°
F
“FAN ON” Limit
Model : OLR160
110
°
F
2
Model : OUF105, OLF105, OLR105, OUF160,
NOUF105 &NOLF105
130
°
F
‘’HI’’ Limit
Model : OLR160
170
°
F
Model : OUF105, OLF105, OLR105, NOUF105
& NOLF105
180
°
F
3
Model : OUF160
220
°
F
2.3.10 DV-2000™ Blocked intake/blocked vent test
On side-wall vented furnaces, the DV-2000™ venting system
incorporates a safety shutdown system that will shut the
burner down before #1 smoke occurs due to the presence of a
blocked intake or blocked vent outlet. Test the system as
follows:
1. Ensure that the furnace has been running for at least 10
minutes;
2. Gradually block the intake. The burner flame should shut
down before a #1 smoke reading occurs;
3. Gradually block the vent outlet. The burner flame should
shut down before a #1 smoke reading occurs;
4. If the burner does not shut down before a #1 smoke
occurs, ensure that the burner is set up according to Part
2, section 3.4 (2.3.4). Perform the CO
2
/ Smoke Test, and
allow for the 1.5% CO
2
operating play required by the
instructions;
5. If the burner still does not shut down before a #1 smoke
occurs, check for a blockage of the pressure hose, or at
the hose connection points.
IMPORTANT
The DV-2000™ safety shutdown system will shut down
the burner flame during a blocked intake or blocked
vent condition if and only if, the burner has been set up
and calibrated in accordance with Tables 4.1, 4.2 or 4.3.
Perform the CO
2
/ Smoke Test. For instance, if the
burner is adjusted and final-set to a #1 smoke condition
during normal operation, the burner flame cannot
possibly shut down before #1 smoke occurs during a
blockage condition.
2.3.11 BVSO performance test
The purpose of the following test is to check that the
electrical outlet on the furnace, designated to the BVSO, is
functional.
1.
Start up the burner;
2.
Remove the three-pole plug from the BVSO outlet on
the furnace;
3.
The burner must shut-off immediately, while the
blower continues to run to the end of the cool-down
cycle.
If the test is not in line with the above, call a QUALIFIED
SERVICE TECHNICIAN.
DNS-0355 Rev. B
19
Summary of Contents for NOLF105A12D
Page 25: ...DNS 0571 Rev C DNS 0573 Rev C FIGURE 5 1 Model OLR105A12D FIGURE 5 2 Model OLR160B20C 26...
Page 26: ...FIGURE 5 3 Model OUF105A12C FIGURE 5 4 Model OUF160B18C DNS 0572 Rev D DNS 0568 Rev C 27...
Page 27: ...FIGURE 5 5 Model OLF105A12C DNS 0570 Rev C FIGURE 5 6 Model NOUF105A12D DNS 0674 Rev E 28...
Page 28: ...FIGURE 5 7 Model NOLF105A12D DNS 0676 Rev D 29...
Page 30: ...COMPONENTS AND REPLACEMENT PARTS 31...
Page 31: ...PARTS LIST Model OLR105A12D B50031 B 32...
Page 33: ...PARTS LIST Model OLR160B20C B50032 C 34...
Page 35: ...PARTS LIST Model OUF105A12C B50033 B 36...
Page 37: ...PARTS LIST Model OUF160B18C B50034 D 38...
Page 39: ...PARTS LIST Model OLF105A12C B50035 B 40...
Page 41: ...PARTS LIST Model NOLF105A12D B50037 B 42...