- 54 -
• Confirm that the Vertical Louver is normally geared with the shaft of
Stepping Motor.
• If the regular torque is detected when rotating the Vertical Louver with
hands
¢¡
Normal
• Check the connecting condition of CN-UP/DOWN Connector
• Check the soldering condition(on PWB) of CN-UP/DOWN Connector
Check the operating circuit of the Vertical Louver
• Confirm that there is DC +12V between pin
¤Ł
(RED) of CN-UP/DOWN and
GND.
• Confirm that there is a soldering short at following terminals.
- Between
§œ
,
§ß
,
§
and
§
of MICOM
- Between
¤Ø
,
¤Œ
,
¤º
and
¤
of IC7
- Between
¤æ
,
¤
,
¤
and
¤
of IC7
- Between
¤
,
¤Ł
,
¤Ø
,
¤Œ
and
¤º
of CN-UP/DOWN
If there are no problems after above checks
• Confirm the assembly conditions that are catching and interfering parts in
the rotation radial of the Vertical Louver
6. When Vertical Louver does not operate.
Summary of Contents for HMC009KD
Page 62: ...62 Schematic Diagram...
Page 63: ...63...