INDEX
P
Piping, Vent/Combustion Air, 13--16
Polarity, Line Voltage, 4
Pressure Switches, 12--14
Pressures, Approximate Operating, 13
R
Roll Out Limit Switch, 11
Room Thermostat, 8
S
Sequence of Operation Chart, SV9541Q, 39
ST9162A Testing Sequence, 19
Supply, Electrical, 4
Supply, Gas, 5
SV9541Q System Operation, 20
Switch, Blower Door Interlock, 5
Switch, “DIP”-- ST9140, 18
Switch, Auxiliary Limit, 10
Switch, LP Gas Pressure, 12
Switch, Limit, 11
Switch, Pressure, 12--13
Switch, Roll Out Limit, 11
T
Technical Service Data, 44; 52
Temperature Rise, 8
Testing Sequence, ST9162A/SV9541Q, 21
Thermostat, Room, 8
Troubleshooting Chart, Honeywell SV9541Q, 37--38
U
Unit Identification, 2
V
Vent Termination, Concentric, 16
Vent Termination, Standard, 14
Vent/Combustion Air Piping, 14
W
Wiring Diagram, 54--59
Wiring, Control, 10