3-20
Getting Started:
PAC-5007(P)/5107(P)/5207/5307 Ver. 1.0, 07/2010 ICP DAS
3.
Now, you can set the Address, Baud rate and Checksum. After configuration, you
must
click “Setting” to save the settings.
4.
You have completed the setting; please adjust the DIP Switch to “OFF” position and
restart the power. Finally, you can serch the module again to comfirm settings.
Note:
Remember to remove the wire between INIT* and GND, then restart the power if you
use the I-7000 I/O module.
3.
Follow the steps to
comfirm the settings.
Summary of Contents for ISaGRAF mPAC Series
Page 46: ......