background image

Page: 

3

 / 

3

 

 

 
 

3.  Control Signal Level 

 
 

[START] 

 
 

Voltage [V] 
 
 

 
 
 
 
 
 
 

 

 

Chart-4: Signal Level of START line 

 
 

[KEY] 

 
 

Voltage [V] 
 
 

 
 
 
 
 
 
 

 

 

Chart-5: Signal Level of KEY line 

 
 

AT-140 Pin Configuration 

   

 
 

More than 350 ms* 

Less than 1V to start tuning 

*For “Tuner Through” function ;Less than 250 ms 

Approximately 5V 

Automatic Tuning Process 

Grounded

Approx. 5V 

Time 

Time 

Reviews: