
Getting Started
16
Note: This method requires roughed in electrical prior to installation which
must be centered 33.5” from the floor to comply with ADA requirements.
Please adhere to all local and national building codes when installing the wall
installation power cable.
Step 1: Use the supplied template to mark out where you will need to install your
roughed in electrical box and mounting hardware on the wall for proper installation.
Step 2: Use proper wall anchors or ensure proper depth screws are used when
mounting into wall studs.
Note:
Wall-mounting hardware is not included.
Wall Mounting the Swift UV