background image

AccuPro ONE 

Manual

www.icl-growingsolutions.com

Summary of Contents for AccuPro ONE

Page 1: ...AccuPro ONE Manual www icl growingsolutions com...

Page 2: ...ts package 5A Axle bearing X2 5B Wheel Washer 5C Small Cotter pin 5D Large Cotter pin 5E Agitator 5F M6x60 Bolts X4 5G M6 lock nuts X4 5H M6 X35 Bolts 5I M6 Wing Nut X2 6 Axle 7 Lower Frame X2 8 Contr...

Page 3: ...ket 12 1 22 Push the free end of the lower linkage 13 through the center hole of the shutter plate 2 Secure the lower linkage 13 in place using the R pin small 11C as shown 3 Take the two lower frames...

Page 4: ...The arrow should point away from the stand 3 6B Feed the axle 6 through the hole without the axle bearing Item 5A push it through the hole in the centre of the gearbox and through the hole Item 5A on...

Page 5: ...pin item 5C into the holes to fix the second wheel 6F Use the pliers to split the cotter pins on both sides 6G 8 Thread the M6x35 bolt through the handle bar hole Item 2 and lower frame Item 7 Use the...

Page 6: ...per are fully open and the control lever is set at 25 IMPORTANT 9 Protruding from the back of the hopper body Item 9 is a V shaped metal bracket Item 12 pivot bracket Clip the L shaped end of the cont...

Page 7: ...a single or double pass apllication method as shown in images A single pass or image B double pass taking into account the spread width of the material being applied single pass double pass Step 3 Cl...

Page 8: ...3 ICL Koeweistraat 4 4181 CD Waardenburg The Netherlands Tel 31 0 418 655 700 Email info iclsf com For further information contact your ICL Technical Area Sales Manager or visit www icl growingsolutio...

Reviews: